| 期刊論文1. | Dabbas, M. A. A.、Halpin, D. W.(1982)。Integrated project and process management。J. of Constr. Engrg. and Mgmt,108(3),361-374。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 2. | AbouRizk, S. M.、Halpin, D. W.(1990)。Probabilistic simulation studies for repetitive construction processes。J. of Constr. Engrg. and Mgmt,116(4),575-594。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 3. | Huang, R. Y.、Halpin, D. W.(1994)。Visual construction operation simulation: The DISCO spproach。J. of Microcomp. in Civ. Engrg,9,175-184。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 4. | Lutz, J. D.、Halpin, D. W.、Wilson, J. R.(1994)。Simulation of learning development in repetitive construction。J. of Constr. Engrg. and Mgmt,120(4),753-773。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 5. | Martinez, J. C.、Loannou, P. G.(1999)。General-purpose system for effective construction simulation。J. of Constr. Engrg. And Mgmt,125(4),265-276。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 6. | Jim, H. K.、Chang Z. Y.(1998)。Airport passenger terminal aimulation: a planning and design tool。Simulation Practice and Theory,6(4),387-396。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 7. | Ertay, Tijen(1996)。Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: A case study。International Journal of Production Economics,56/57,145-155。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 8. | Saltzman, R. M.(1997)。Animated simulation model for analyzing on street parking issues。Simulation,69(2),79-90。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 9. | Chang C. Y.(1997)。Using computer simulation to manage the crowding problem in parks: A study。Landscape and Urban Planning,37(4),147-161。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 10. | Gonzalez-Quevedo, A. A.、AbouRizk, S. M.、Iseley, D. T.、Halpin, D. W.(1993)。Comparison of two simulation methodologies in construction。J. of Constr. Engrg. and Mgmt,119(3),573-589。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 11. | Senior, B. A.、Halpin, D. W.(1998)。Simplified simulation system for construction projects。J. of Comtr. Engrg. and Mgmt,124(1),72-81。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 12. | Shi, J. J.、AbouRizk, S. M.(1997)。Resource-based modeling for construction simulation。J. of Comtr. Engrg. and Mgmt,123(1),26-33。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 13. | Chehayeb, N. N.、Abourizk, S. M.、Brown, S. S.(2000)。Simeon: the development and implementation of a simulation-based project control methodology。Can. J. Eng,27,349-363。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 14. | Shi, J. J.(1999)。Activity-Based Construction (ABC) modeling and simulation method。J. of Constr. Engrg. and Mgmt,125(5),354-360。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 15. | Sawheny, A.、Abourizk, S. M.、Halpin, D. W.(1998)。Construction project simulation using CYCLONE。Can. J. Eng,25,16-25。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 16. | Abraham, D. M.、Halpin, D. W.(1998)。Simulation of the construction of cable-stayed bridges。Can. J. Eng,25,490-499。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 17. | Chehayeb, N. N.、Abourizk S. M.(1998)。Simulation-based scheduling with continuous activity relationships。J. of Constr. Engrg. And Mgmt,124(2),107-115。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 18. | Halpin, D. W.、Huang, R. Y.(1995)。A process-based approach to value-added construction - the CYCLONE/DISCO system。Can. J. Eng,22,1063-1071。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 19. | McHaney, Roger(1999)。Integration of the genetic algorithm and discrete-event computer simulation for decision support。Simulation,72(6),401-411。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 會議論文1. | Bernold, L. E.、Halpin, D. W.(1984)。Microcomputer cost optimization of earth moving operation。4th International Symposium on Organization and Management of Construction。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 2. | 鄭道明、吳獻堂、曾貽威、張維庭(2000)。營建作業系統模擬工具--COST。八十九年第四屆營建工程與管理研究成果聯合發表會。台中。 延伸查詢![new window](/gs32/images/newin.png) | 3. | Cheng, T. M.、Wu, H. T.、Tseng Y. W.(2000)。Construction Operation Simulation Tool COST。The 17th SAARC Conference。Taipei。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 4. | Lee, D. C.、Park, S. J.、Song, J. S.(1998)。Performance analysis of queueing schemes for multiple priorities in multiservice PCS。Global Telecommunication Conference。Sydney。496-501。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 5. | Weigl, K. H.(1998)。Simulation of a large-scale brewery distribution system。The 1998 Winter Simulation Conference。Washington. D.C。1255-1259。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 6. | Jing, G. G.、Kelton, W. D.、Arantes, J. C.、Houshmand, A. A.(1998)。Modeling a controlled conveyor network with merging configuration。The 1998 Winter Simulation Conference。Washington. D.C。1041-1048。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 圖書1. | Shannon, R. E.(1975)。System simulation: the art and science。Taipei:華泰書局。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 2. | Halpin, D. W.(1990)。Micro-CYCLONE user's manual。West Lafayette, Ind:Purdue University:Department of Civil and Environmental Engineering。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 3. | Halpin, D. W.、Woodhead, R.(1976)。Design of construction and process operations。New York:Wiley。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 4. | 林宏澤、林清泉(1991)。系統模擬。台北:高立圖書有限公司。 延伸查詢![new window](/gs32/images/newin.png) | 5. | Ross, T. J.(1997)。Fuzzy logic with engineering applications。New York:McGRAW-HILL。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 6. | Klir, G. J.、Clair, U. S.、Yuan, B.(1997)。Fuzzy set theory foundations and applications。Prentice-Hall, NJ。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 7. | 王文俊(1997)。認識Fuzzy。台北:全華科技圖書股份有限公司。 延伸查詢![new window](/gs32/images/newin.png) | 8. | Halpin, D. W.、Riggs, Leland S.(1992)。Planning and Analysis of Construction Operations。New York:John Wiley And Sons。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | |