期刊論文1. | Bai, D. S.、Hong, S. H.(1990)。Economic Design of Sampling Plans with Multi-Decision Alternatives。Naval Research Logistics,37,905-918。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
2. | Bonett, D. G.、Woodward, J. A.(1994)。Sequential Defect Removal Sampling。Management Science,40(7),898-902。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
3. | Cassandras, C. G.、Han, Y.(1992)。Optimal Inspection Policies for a Manufacturing Station。European Journal of Operational Research,63,35-53。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
4. | Chen, S. L.、Chung, K. J.(1994)。Inspection Error Effects on Economic Selection of Target Value for a Production Process。European Journal of Operational Research,79,311-324。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
5. | Drury, C. G.、Chi, C. F.(1995)。A Test of Economic Models of Stopping Policy in Visual Search。IIE Transactions,27,382-393。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
6. | Duffuaa, S. O.、Al-Najjar, H. J.(1995)。An Optimal Complete Inspection Plan for Critical Multicharacteristic Components。Journal of the Operational Research Society,46,930-942。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
7. | Fink, R. L.、Margavio, T. M.(1994)。Economic Models for Single Sample Acceptance Sampling Plans, No Inspection, and 100 Percent Inspection。Decision Sciences,25(4),625-653。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
8. | Gilbert, S.、Emmons, H.(1995)。Managing a Deteriorating Process in a Batch Production Environment。IIE Transactions,27,233-243。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
9. | Goyal, S. K.、Gunasekaran, A.、Martikainen, T.、Yli-Olli, P.(1993)。Integrating Production and Quality Control Policies: A Survey。European Journal of Operational Research,69,1-13。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
10. | Kleijnen, J. P. C.、Kriens, J.、Lafleur, M. C. H. M.、Pardoel, J. H. F.(1992)。Sampling for Quality Inspection and Correction: AOQL Performance Criteria。European Journal of Operational Research,62,372-379。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
11. | Lee, H. L.、Tagaras, G.(1992)。Economic Acceptance Sampling Plans in Complex Multi-stage Production Systems。International Journal of Production Research,30(11),2615-2632。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
12. | Ronen, B.、Spector, Y.(1995)。Evaluating Sampling Strategy under Two Criteria。European Journal of Operational Research,80,59-67。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
13. | Sheil, J.(1996)。Towards Economically Optimal First-off inspection。European Journal of Operational Research,94,179-185。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
14. | Stern, H. I.、Ladany, S. P.(1994)。Optimal Number and Allocation of Controls among Serial Production Stages。The International Journal of Advanced Manufacturing Technology,9,398-407。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
15. | Tang, K.(1988)。Economic Design of Product Specifications for a Complete Inspection Plan。International Journal of Production Research,26(2),203-217。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
16. | Tang, K.、Schneider, H.(1990)。Cost Effectiveness of Using a Correlated Variable in a Complete Inspection Plan When Inspection Error Is Present。Naval Research Logistics,37,893-904。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |