The author has designed two paimary school buildings which were destroyed at 921 earthquake and has found that the traditionally built buildings took too long to construct and involved too much money in construction. With the result that school costs and construction time are probably the most controversial subjects being discussed by the educationists and architects in Taiwan today. In order to achieve the best value in school building and to make the maximum use of available resources, the school building progamme, design philosophy and building process must be studied carefully. The main purpose of this study is to give an account of the technological features of a school building system made by industrial design to solve the problems of Taiwan’s school building programme more efficiently.