| 期刊論文1. | Wu, Bin、Seddon, Jonathan J. M.(1994)。An Anthropocentric Approach to knowledge-based Preventive Maintenance。Journal of Intelligent Manufacturing,5,389-397。 | 2. | Pintelonm, L.、Wassenhove, L. V.(1990)。A Maintenance Management Tool。Omega: The International Journal of Management Science,18(1),59-70。 | 3. | McFadden, R. H.(1990)。Developing a Database for a Reliability, Availability, and Maintainability Improvement Program for an Industrial Plant or Commercial Building。IEEE Transactions on Industry Applications,26(4),735-740。 | 4. | Okogbaa, G.、Huang, J.、Shell, R. L.(1992)。Database Design for Predictive Preventive Maintenance System of Automated Manufacturing System。Computers and Industrial Engineering,23(1/4),7-10。 | 5. | Silver, Edward A.、Fiechter, Claude-Nicolas(1995)。Preventive maintenance with limited historical data。European Journal of Operational Research,82,125-144。 | 研究報告1. | 邱元錫(1997)。探討台灣TPM推動與績效 (計畫編號:NSC87-2213-E324-006)。 延伸查詢 | 圖書1. | Shapiro, Samuel S.、Gross, Alan J.(1981)。Statistical Modeling Techniques。Dekker。 | 2. | 佐佐木輝美、李爾雅(1995)。中小企業導入TPM時的問題所在。東京鑄造所群馬工廠。 延伸查詢 | 3. | Von Alven, W. H.(1964)。Reliability Engineering (ARINC Research Corporation)。Englewood Cliffs, NJ:Prentice-Hill。 | 4. | Smith, Anthony M.(1993)。Reliability-Centered maintenance。McGraw-Hill。 | 5. | 日本設備維護協會(1995)。現場從業人員TPM實務。中衛發展中心。 延伸查詢 | 6. | 日本設備維護協會、中衛發展中心(1994)。TPM經營幹部課程講義。 延伸查詢 | 7. | 白勢國夫(1994)。現場幹部TPM實施。中衛發展中心。 延伸查詢 | 8. | Nakajima, Seiichi(1988)。Introduction to TPM: total productive maintenance。Portland, Oregon:Cambridge, Mass:Productivity Press。 | 9. | Hahn, Gerald J.、Shapiro, Samuel S.(1994)。Statistical Model in Engineering。Wiley。 | 10. | 日本設備維護協會(1996)。新TPM加工組立篇。中衛發展中心。 延伸查詢 | |