期刊論文1. | 顏上堯、Tang, Tun-Tai、杜宇平(2002)。Optimal Construction of Airline Individual Crew Pairings。Computers & Operations Research,29(4),341-363。 |
2. | Lau, Hoong-Chuin(1996)。On the Complexity of Manpower Shift Scheduling。Computers & Operations Research,23(1),93-102。 |
3. | Bartholdi, J. J.(1981)。A Guaranteed-Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering。Operations Research,29(3),501-510。 |
4. | Lucic, P.、Teodorovic, D.(1998)。A Fuzzy Set Theory Approach to the Aircrew Rostering Problem。Fuzzy Sets and Systems,95,261-271。 |
5. | 顏上堯、林錦翌(19970600)。空服員排班組合最佳化之研究。中國土木水利工程學刊,9(2),303-313。 延伸查詢 |
6. | 李宇欣、楊承道(19990900)。雙勤務人員排班問題。運輸計劃,28(3),409-420。 延伸查詢 |
7. | Caprara, A.、Fischetti, M.、Toth, P.、Vigo, D.、Guida, P. L.(1997)。Algorithms for Railway Crew Management。Mathematical Programming,79,125-141。 |
8. | Beaumont, N.(1997)。Scheduling Staff Using Mixed Integer Programming。European Journal of Operational Research,98(3),473-484。 |
9. | Brusco, M. J.、Jacobs, L. W.(1998)。Elimination Redundant Columns in Continuous Tour Scheduling Problems。European Journal of Operational Research,111,518-525。 |
10. | Alfares, H. K.(1998)。An Efficient Two-phase Algorithm For Cyclic Days-off Scheduling。Computers Operational Research,25(11),913-923。 |
11. | 陳春益、李宇欣、盧華安(1997)。飛機調度與定期維修整合模式之研究。運輸計劃季刊,26(1),69-94。 延伸查詢 |
12. | 羅智騰、顏上堯(1996)。因應預期性航具維修之系統飛航排程。中國土木水利工程學刊,8(3),447-456。 延伸查詢 |
13. | 翁綵穗、顏上堯(2001)。季節轉換間緩衝期飛航排程之研究。運輸計劃季刊,30(4),891-922。 延伸查詢 |
14. | Beasley, J. E.、Cao, B.(1996)。A Tree Search Algorithm for the Crew Scheduling Problem。European Journal of Operational Research,94(3),517-526。 |
15. | Chang, Jei-Chi、顏上堯、Yan, S.、Chang, J. C.(2002)。Airline Cockpit Crew Scheduling。European Journal of Operational Research,136(3),501-511。 |
16. | Ryan, D. M.(1992)。The Solution of Massive Generalized Set Partitioning Problem in Aircrew Rostering。Journal of the Operational Research Society,43,459-467。 |
17. | Lucic, P.、Teodorovic, D.(1999)。Simulated Annealing for the Multiobjective Aircrew Rostering Problem。Transportation Research, Part A: Policy and Practice,33,19-45。 |
18. | Langerman, J. J.、Ehlers, E. M.(1997)。Agent-based Airline Scheduling。Computers and Industrial Engineering,33(3/4),849-852。 |
19. | Higgins, A.(1998)。Scheduling of Railway Track Maintenance Activities and Crews。Journal of the Operational Research Society,49,1026-1033。 |
20. | Brusco, M. L.(1998)。Solving Personnel Tour Scheduling Problems Using the Dual All-integer Cutting Plane。IIE Transaction,30,835-844。 |
21. | Showalter, M. J.、Morris, J. G.(1983)。Simple Approaches to Shift, Days-off and Tour Scheduling Problems。Management Science,29(8),942-950。 |
22. | Aykin, T.(2000)。A Comparative Evaluation of Modeling Approaches to the Labor Shift Scheduling Problem。European Journal of Operational Research,25,381-397。 |
23. | Narasimhan, R.(1996)。An Algorithm for Single Shift Scheduling of Hierarchical Workface。European Journal of Operational Research,96,113-121。 |
24. | Easton, F. F.、Rossin, D. F.(1991)。Equivalent Alternate Solutions for the Tour Scheduling Problem。Decision Sciences,22,985-1007。 |
25. | Brusco, M. J.、Johns, T. R.(1996)。A Sequential Integer Programming Method for Discontinuous Labor Tour Scheduling。European Journal of Operational Research,95,537-548。 |
26. | Bechtold, S. E.、Brusco, M. J.、Showalter, M. J.(1991)。A Comparative Evaluation of Labor Tour Scheduling Method。Decision Sciences,22,683-699。 |
27. | Brusco, M. J.、Johns, T. R.(1998)。Improving the Dispersion of Surplus Labor in Personnel Scheduling Solutions。Computers and Industrial Engineering,28(4),745-754。 |