:::

詳目顯示

回上一頁
題名:The Optimum Selection of Imperfect Quality Economic Manufacturing Quantity and Process Mean by Considering Quadratic Quality Loss Function
書刊名:工業工程學刊
作者:陳忠和 引用關係
作者(外文):Chen, Chung-ho
出版日期:2006
卷期:23:1
頁次:頁12-19
主題關鍵詞:Economic manufacturing quantityProcess meanTaguchi's quadratic quality loss function經濟生產數量EMQ製程平均數田口二次品質損失函數
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(2) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:2
  • 共同引用共同引用:0
  • 點閱點閱:18
期刊論文
1.Wright, C. M.、Mehrez, A.(1998)。An overview of representative research of the relationships between quality and inventory。Omega,26(1),29-47。  new window
2.Lee, J. S.、Park, K. S.(1991)。Joint determination of production cycle and inspection intervals in a deteriorating production system。Journal of the operational Research Society,42,775-783。  new window
3.Golhar, D. Y.(1987)。Determination of the best mean contents for a canning problem。Journal of Quality Technology,19,82-84。  new window
4.Lee, M. K.、Jang, J. S.(1997)。The optimum target values for a production process with three-class screening。International Journal of Production Economics,49,91-99。  new window
5.Lee, H. L.、Rosenblatt, M. J.(1987)。Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System。Management Science,33(9),1125-1136。  new window
6.Golhar, D. Y.、Pollock, S. M.(1988)。Determination of the Optimal Process Mean and the Upper Limit for a 'Canning Problem'。Journal of Quality Technology,20,188-192。  new window
7.Golhar, D. Y.、Pollock, S. M.(1992)。Cost savings due to variance reduction in a canning process。IIE Transactions,24,88-92。  new window
8.Lee, M. K.、Elsayed, E. A.(2002)。Process mean and screening limits for filling processes under two-stage screening procedure。European Journal of Operational Research,138,118-126。  new window
9.Lee, M. K.、Hong, S. H.、Elsayed, E. A.(2001)。The optimum target value under single and two-stage screenings。Journal of Quality Technology,33,506-514。  new window
10.Lee, M. K.、Hong, S. H.、Kwon, H. M.、Kim, S. B.(2000)。Optimum process mean and screening limits for a production process with three-class screening。International Journal of Reliability, Quality and Safety Engineering,7,179-190。  new window
11.Bisgaard, S.、Hunter, W. G.、Pallesen, L.(1984)。Economic selection of quality of manufactured product。Technometrics,26,9-18。  new window
12.Duffuaa, S. O.、Siddiqui, A. W.(2002)。Integrated process targeting and product uniformity model for three-class screening。International Journal of Reliability, Quality and Safety Engineering,9,261-274。  new window
13.Golhar, D. Y.、Pollock, S. M.(1988)。Determination of the optimal process mean and the upper limit of the canning problem。Journal of Quality Technology,20,188-192。  new window
14.Hunter, W. G.、Kartha, C. P.(1977)。Determining the most profitable target value for a production process。Journal of Quality Technology,9,176-181。  new window
15.Springer, C. H.(1951)。A method of determining the most economic position of a process mean。Industrial Quality Control,8,36-39。  new window
16.Phillips, M. D.、Cho, B. R.(2000)。A nonlinear model for determining the most economic process mean under a beta distribution。International Journal of Reliability, Quality and Safety Engineering,7,61-74。  new window
17.Misiorek, V. I.、Barrnett, N. S.(2000)。Mean selection for filling processes under weights and measures requirements。Journal of Quality Technology,32,111-121。  new window
18.Boucher, T. O.、Jafari, M. A.(1991)。The optimum target value for single filling operations with quality sampling plans。Journal of Quality Technology,23(1),44-47。  new window
19.Carlsson, O.(1984)。Determining the most profitable process level for a production process under different sales conditions。Journal of Quality Technology,16,44-49。  new window
20.Carlsson, O.(1989)。Economic selection of a process level under acceptance sampling by variables。Engineering Costs and Production Economics,16(1),69-78。  new window
21.Pulak, M. F. S.、Al-Sultan, K. S.(1996)。The Optimum Targeting for a Single Filling Operation with Rectifying Inspection。Omega: The International Journal of Management Science,24(6),727-733。  new window
22.Rahim, M. A.、Tuffaha, F.(2004)。Integrated Model for Determining the Optimal Initial Settings of the Process Mean and the Optimal Production Run Assuming Quadratic Loss Function。International Journal of Production Research,42,3281-3300。  new window
23.Rosenblatt, M. J.、Lee, H. L.(1986)。A comparative study of continuous and periodic inspection policies in deteriorating production systems。IIE Transactions,18(1),2-9。  new window
24.Rosenblatt, Meir J.、Lee, Hau L.(1986)。Economic production cycles with imperfect production processes。IIE Transactions,18(1),48-55。  new window
25.Porteus, Evan L.(1986)。Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction。Operations Research,34(1),137-144。  new window
26.Lee, H. L.、Rosenblatt, M. J.(1989)。A production and maintenance planning model with restoration cost dependent on detection delay。IIE Transaction,21(4),368-375。  new window
27.Rahim, M. A.、Arcelus, F. J.(1990)。Optimal Process Levels for the Joint Control of Variables and Attributes。European Journal of Operational Research,45,224-230。  new window
28.曾勝滄(1996)。Optimal Preventive Maintenance Policy for Deteriorating Production Systems。IIE Transactions,28,687-694。  new window
29.Makis, V.、Fung, J.(1998)。An EMQ Model with Inspections and Random Machine Failures。Journal of the Operational Research Society,49,66-75。  new window
30.Al-Sultan, K. S.(1994)。An Algorithm for the Determination of the Optimum Target Values for Two Machines in Series with Quality Sampling Plans。International Journal of Production Research,32,37-45。  new window
31.Al-Sultan, K. S.、Al-Fawzan, M. A.(1997)。Variance Reduction in a Process with Random Linear Drift。International Journal of Production Research,35,1523-1533。  new window
32.Al-Sultan, K. S.、Pulak, M. F. S.(1997)。Process Improvement by Variance Reduction for a Single Filling Operation with Rectifying Inspection。Production Planning & Control,8,431-436。  new window
33.Lee, M. K.、Kim, S. B.、Kwon, H. M.、Hong, S. H.(2004)。Economic Selection of Mean Value for a Filling Process under Quadratic Quality Loss。International Journal of Reliability, Quality and Safety Engineering,11,81-90。  new window
34.Liou, M. J.、Tseng, S. T.、Lin, T. M.(1994)。The Effects of Inspection Errors to the Imperfect EMQ Model。IIE Transactions,26,42-51。  new window
35.Makis, V.(1996)。Optimal Lot Sizing and Inspection Policy for an EMQ Model with Imperfect Inspections。Naval Research Logistics,45,165-186。  new window
36.Rahim, M. A.、Banerjee, P. K.(1988)。Optimal Production Run for a Process with Random Linear Drift。Omega: The International Journal of Management Science,16,347-351。  new window
圖書
1.田口玄一(1986)。Introduction to Quality Engineering: Designing Quality into Products and Processes。Tokyo:Asian Productivity Organization。  new window
圖書論文
1.Al-Sultan, K. S.(1997)。Introduction to optimization。Optimization in Quality Control。Boston:Kluwer Academic Publishers。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE