| 期刊論文1. | Dangayach, G. S.、Deshmukh, S. G.(2000)。Manufacturing Strategy: Experiences From Select Indian Organizations。Journal of Manufacturing Systems,19(2),134-148。 | 2. | Ireland, F.、Dale, B. G.(2001)。A Study of Total Productive Maintenance Implementation。Journal of Quality in Maintenance Engineering,7(3),183-192。 | 3. | Koontz, H.(1961)。The management theory jungle。Journal of the Academy of management,4(3),174-188。 | 4. | 葉焜煌(20010400)。e化供應鏈管理之績效指標探討。資訊管理研究,3(2),57-71。 延伸查詢 | 5. | Anonymous.(2003)。Pulp fact: South African paper mill’s TPM journey。Strategic Direction,19(4),17-19。 | 6. | Backlund, F.,、Akersten, P. A.(2003)。RCM introduction: Process and requirements management aspects。Journal of Quality in Maintenance Engineering,9(3),250-264。 | 7. | Bamber, C., Sharp, J.,、Hides, M.(2002)。The role of the maintenance organization in an integrated management system。Managerial Auditing Journal,17(1/2),20-25。 | 8. | Ben-Daya, M.(2000)。You may need RCM to enhance TPM implementation。Journal of Quality in Maintenance Engineering,6(2),82-85。 | 9. | Cummings, G.(1993)。Beyond most modern-day maintenance strategies: Strategy indicators。Industrial Engineering,25(8),22-23。 | 10. | De Groote, P.(1995)。Maintenance performance analysis: a practical approach。Journal of Quality in Maintenance Engineering,1(2),4-24。 | 11. | Deane, T.(2002)。Developing maintenance plans using RCM principles。Canadian Mining and Metallurgical Bulletin,95(1065),104-105。 | 12. | Dightman, S. D.(2004)。Leveraging TPM to the corporate bottom line。Plant Engineering,58(5),25-26。 | 13. | Ednie, H.(2002)。RCM helps operations get the most out of equipment。CIM Bulletin,1065,20-25。 | 14. | El-Haram, M. A.,、Homer, M. W.(2002)。Practical application of RCM to local authority housing: a pilot study。Journal of Quality in Maintenance Enineerin,8(2),135-143。 | 15. | Farrero, J. M. C., Tarres, L. G.,、Losilla, C. B.(2002)。Optimization of replacement stocks using a maintenance program derived from reliability studies of production systems。Industrial Management and Data Systems Wembley,102(4),188-196。 | 16. | Hansson, J., Backlund, F.,、Lycke, L.(2003)。Managing commitment: increasing the odds for successful implementation of TQM, TPM or RCM。The International Scnirnal of Quality & Reliability Management,20(9),993-1008。 | 17. | Jia, X.,、Christer, A. H.(2002)。A prototype cost model of functional chèck decisions in a reliability-centred maintenance。The Journal of the Operational Research Society,53(12),1380-1384。 | 18. | Ke, H. Y.,、Hwang, C. P.(1997)。Reliability program management based on ISO 9000。The International Journal of Quality & Reliability Management,14(3),309-318。 | 19. | Lin, D., Zuo, M. J., Yam, R. C. M.,、Meng, M. Q. H.(2000)。Optimal system design considering warranty, periodic preventive maintenance, and minimal repair。The Journal of the Operational Research Society,51(7),869-874。 | 20. | Mathew, S.,、Kennedy, D.(2002)。Minimizing equipment down time under shock load conditions。The International Journal of Ouality & Reliability Management,19(1),90-96。 | 21. | McAdam, R.,、McGeough, F.(2000)。Implementing total productive maintenance in multi-union manufacturing organizations: overcoming job demarcation。Total Quality Management,11(2),187-197。 | 22. | McKone, K. E.、Cua, K. O.、Schroeder, R. G.(2001)。The impact of total productive maintenance practices on manufacturing performance。Journal of Operations Management,19(1),39-58。 | 23. | Orr, S.(1999)。The role of quality management in manufacturing strategy: Experiences from the Australian wine industry。Total quality management,10(2),271-279。 | 24. | Pheng, L. S.,、Wee, D.(2001)。Improving maintenance and reducing building defects through ISO 9000。Journal of Ouality in Maintenance Engineering,7(1),6-24。 | 25. | Pujadas, W.、Chen, F. F.(1996)。A reliability centered maintenance strategy for a discrete part manufacturing facility。Computers and Industrial Engineering,31(1/2),241-244。 | 26. | Pun, K. F., Chin, K. S., Chow, M. F.,、Lau, H. C. W.(2002)。An effectiveness-centered approach to maintenance management: a case study。Journal of Quality in Maintenance Engineering,8(4),346-368。 | 27. | Roup, J.(2004)。Strategy maximizes turnaround performance。Oil and Gas Journal,102(20),46-54。 | 28. | Sherwin, D. J.,、Jonsson, P.(1995)。TQM, maintenance and plant availability。Journal of Quality in Maintenance Engineering,1(1),15-19。 | 29. | Srikrishna, S., Yadava, G. S.,、Rao, P. N.(1996)。Reliability-centered maintenance applied to power plant auxiliaries。Journal of quality in Maintenance Engineering,2(1),3-14。 | 30. | Stewart, L.(2003)。Maintenance reduces fleet size。Construction Equipment,106(9),68-69。 | 31. | Westerkamp, T. A.(1998)。Evaluating the maintenance process。IIE Solutions,30(12),22-28。 | 32. | Wilmeth, R. G.,、Usrey, M. W.(2000)。Reliability-centered maintenance: a case study。Engineering Management Journal,12(4),25-32。 | 會議論文1. | Murthy, D. K.,、Verbitsky, D. E.(2003)。Effective reliability management for transit system life cycle。Kansas City, MI。57,169-182。 | 研究報告1. | 高福成(1994)。TPM 全面生產保養推進實務。 延伸查詢 | 學位論文1. | 吳志雄(2002)。全面生產管理(TPM)活動之導入與成效研究-以汽車零組件為例,桃園。 延伸查詢 | 2. | 許靜宜(2002)。供應鏈管理對製造績效之影響:以及時採購為導向,台北市。 延伸查詢 | 3. | 張致誠(2002)。寶行TQM、JIM 及TPM 與企業績效間的關係,台北市。 延伸查詢 | 圖書1. | Nakajima, Seiichi(1988)。Introduction to TPM: total productive maintenance。Portland, Oregon:Cambridge, Mass:Productivity Press。 | 2. | Anderson, R. T.,、Neri, L.(1990)。Reliability-Centered Maintenance: Management and Engineering Methods。London。 | 3. | Duffuaa, S. O., Raouf, A.,、Campbell, J. D.(1999)。Planning and Control of Maintenance System Modeling and Analysis。New York。 | 4. | Hibi, S.(1977)。How to Measure Maintenance Performance。Tokyo。 | 5. | Moubray, J.(1997)。Reliability-Centred Maintenance。Oxford。 | |
| |