| 期刊論文1. | Linn, Richard、Zhang, Wei(1999)。Hybrid flow shop scheduling: A survey。Computer & Industrial Engineering,37(1/2),57-61。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 2. | Wittrock, R. J.(1985)。An Adaptable Scheduling Algorithm for Flexible Flow Lines。Operations Research,36,445-453。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 3. | Sriskandarajah, C.、Sethi, S. P.(1989)。Scheduling Algorithms for Flexible Flowshops: Worst and Average Case Performance。European Journal of Operational Research,43,143-160。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 4. | Brah, S. A.、Hunsucker, J. L.(1991)。Branch and Bound Algorithm for a Flowshop with Multiple Processors。European Journal of Operational Research,51,88-99。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 5. | Chang, S. C.、Liao, D. Y.(1994)。Scheduling Flexible Flow Shops with No Set-up Effects。IEEE Transactions on Robotics and Automation,10(2),112-122。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 6. | Redwine, C. N.、Wismer, D. A.(1974)。A Mixed Integer Programming Model for Scheduling Orders in a Steel Mill。Journal of Optimization Theory and Applications,14(3),305-318。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 7. | Hunsucker, J.、Shah, J.(1992)。Performance of Priority Rules in a Due Date Flow Shop, OMEGA。The International Jourmal of Management Science,20(1),73-89。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 8. | Lee, I.、Sikora, R.、Michael, J. S.(1997)。A Genetic Algorithm-based Approach to Flexible Flow-line Scheduling with Variable Lot Sizes。IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics,27(1),36-54。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 9. | 滕学、杨德礼、王众托(1985)。钢管厂热轧机组产品结构模型、合同分配模型及其优化分析。系统工程理论与实践,5(2),40-47。 延伸查詢![new window](/gs32/images/newin.png) | 10. | Kochhar, S.、Morris, R. J. T.(1987)。Heuristic Methods for Flexible Flow Line Scheduling。Journal of Manufacturing Systems,6(4),299-314。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | 會議論文1. | Salvador, M. S.(1973)。A Solution to a Special Class of Flow Shop Scheduling Problem。Berlin, Germany。83-91。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) | |