期刊論文1. | Goyal, S.K.(1974)。Determination of Optimum Packaging Frequency of Items Jointly Replenished。Management Science,21,436-443。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
2. | Van Eijs, M. J. G.(1993)。A Note on the Joint Replenishment Problem under Constant Demand。Journal of the Operational Research Society,44,185-191。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
3. | Chung, K. J.、Hou, K. L.(2003)。An optimal production run time with imperfect production processes and allowable Shortages。Computers & Operations Research,30(4),483-490。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
4. | Rosenblatt, M. J.、Lee, H. L.(1986)。Economic production cycles with imperfect production process。IIE Transactions,18(1),48-55。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
5. | Kim, Chang Hyun、Hong, Yushin(1999)。An optimal production run length in deteriorating production processes。International Journal of Production Economics,58,183-189。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
6. | Porteus, Evan L.(1986)。Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction。Operations Research,34(1),137-144。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
7. | Osteryound, J. S.、McCarty, D. E.、Reinhart, W. J.(1986)。Use of EOQ Model for Inventory Analysis。Production and Inventory Management Journal,3,39-45。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
8. | Arkin, E.、Joneja, D.、Roundy, R.(1989)。Computational Complexity of Un-capacitated Multi-echelon Production Planning Problems。Operations Research Letters,8,61-66。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
9. | Park, K. S.(1983)。An Integrated Production-inventory Model for Decaying Raw Materials。International Journal of Systems Science,14,801-806。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
10. | Lin, L. C.、Hou, K. L.(2005)。EMQ Model with Maintenance Actions for Deteriorating Production System。Information and Management Sciences,16,53-65。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
11. | Raafat, F.(1985)。A Production - Inventory Model for Decaying Raw Materials and a Decaying Single Finished Production System。International Journal of Systems Science,16,1039-1044。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
12. | Kim, K. M.、Hwang, H.(1991)。The Integrated Production Inventory Model with Powers-of-two Restriction。Computers & Industrial Engineering,20,149-153。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
13. | Chiu, S. W.、Gong, D. C.、Wee, H. M.(2004)。Effects of Random Defective Rate and Imperfect Rework Process on Economic Production Quantity Model。Japan Journal of Industrial and Applied Mathematics,21,375-289。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
14. | Kim, S. H.、Chandra, J.(1987)。An Integrated Inventory for a Single Product and Its Raw Materials。International Journal of Production Research,25,627-634。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
15. | Goyal, S. K.(1977)。An Integrated Inventory Model for a Single Product System。Operational Research Quarterly,28,539-545。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
16. | Lin, C. S.(1999)。Integrated Production-inventory Models with Imperfect Production Processes and a Limited Capacity for Raw Materials。Mathematical and Computer Modeling,29,81-89。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
17. | Lee, J. S.、Park, K. S.(1991)。Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production。Journal of Operational Research Society,42,775-783。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
18. | Lin, C. S.、Chen, C. H.、Kroll, D. E.(2003)。Integrated Production-inventory Models for Imperfect Production Processes under Inspection Schedules。Computers & Industrial Engineering,44(4),633-650。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
19. | Viswanathan, S.(1996)。A New Optimal Algorithm for the Joint Replenishment Problem。Journal of Operational Research Society,47,936-944。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
20. | Giri, B. C.、Moon, I.、Yun, W. Y.(2003)。Scheduling Economic Lot Sizes in Deteriorating Production Systems。Naval Research Logistics,50,650-661。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
21. | Hong, J. D.、Hayya, J. C.(1992)。An Optimal Algorithm for Integrating Raw Materials Inventory in a Single-product Manufacturing System。European Journal of Operational Research,59,313-318。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
22. | Goyal, S. K.、Deshmukh, S. G.(1992)。Integrated Procurement-production Systems: A Review。European Journal of Operational Research,62,1-10。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
23. | Hong, J.-D.(1997)。Optimal Production Cycles, Procurement Schedules, and Joint Investment in an Imperfect Production System。European Journal of Operational Research,100,413-428。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |