:::

詳目顯示

回上一頁
題名:Optimal Lot Sizing Policy for an Unreliable Manufacturing System under Cost-Effectiveness Criterion
書刊名:Asia Pacific Management Review
作者:Giri, B. C.Dohi, T.
出版日期:2006
卷期:11:3
頁次:頁187-193
主題關鍵詞:Cost effectiveness criterionEMQInventoryMachine failure and repairProductionReliability
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:1
  • 點閱點閱:19
The traditional method of determining the optimal Economic Manufacturing Quantity (EMQ) policy for an unreliable production system is the minimization of the expected cost per unit time in the steady state which does not consider the reliability of the system in true sense. The purpose of this article is to introduce an alternative criterion of optimality called cost effectiveness which takes into account both cost and reliability aspects of the production system. The proposed EMQ model is formulated under general failure and general repair time distributions. The criteria for the existence and uniqueness of the optimal production time which maximizes the cost effectiveness are derived. Finally, a numerical example is taken to compare the cost effective production policy with the corresponding average cost one.
期刊論文
1.Nakashima, Kenichi、Arimitsu, Hiroyuki、Nose, Toyokazu、Kuriyama, Sennosuke(20040800)。Cost Analysis of a Remanufacturing System。Asia Pacific Management Review,9(4),595-602。new window  new window
2.Ko, Chang Seong、Rho, Jae Jeung(20030900)。Tabu Search-based Heuristic for the Selection of Manufacturing and Transportation Partners in Supply Chain。Asia Pacific Management Review,8(3),353-364。new window  new window
3.Berg, M.、Posner, M. J. M.、Zhao, H.(1994)。Production Inventory Systems with Unreliable Machines。Operations Research,42,111-118。  new window
4.Dohi, T.、Yamada, Y.、Kaio, N.、Osaki, S.(1997)。The Optimal Lot Sizing for Unreliable Economic Manufacturing Models。International Journal of Reliability, Quality and Safety Engineering,4,413-426。  new window
5.Dohi, T.、Okamura, H.、Osaki, S.(2001)。Optimal Control of Preventive Maintenance Schedule and Safety Stocks in an Unreliable Manufacturing Environment。International Journal of Production Economics,74,147-155。  new window
6.Groenevelt, H.、Pintelon, L.、Seidmann, A.(1992)。Production Lot Sizing with Machine Breakdowns。Management Science,38,104-123。  new window
7.Groenevelt, H.、Pintelon, L.、Seidmann, A.(1992)。Production Batching with Machine Breakdown and Safety Stocks。Operations Research,40,959-971。  new window
8.Giri, B. C.、Dohi, T.(2005)。Exact Formulation of Stochastic EMQ Model for an Unreliable Production System。Journal of the Operational Research Society,56,563-575。  new window
9.Kim, C. H.、Hong, Y.、Kim, S. Y.(1997)。An Extended Optimal lot Sizing Model with an Unreliable Machine。Production Planning & Control,8,577-585。  new window
10.Lin, G. C.、Gong, D. C.(2006)。On a Production-inventory System of Deteriorating Items Subject to Random Machine Breakdowns with a Fixed Repair Time。Mathematical and Computer Modelling,43,920-932。  new window
11.Lin, G. C.、Kroll, D. E.(2006)。Economic Lot Sizing for an Imperfect Product System Subject to Random Breakdowns。Engineering Optimization,38,73-92。  new window
12.Makis, V.、Fung, J.(1998)。An EMQ Model with Inspections and Random Machine Failures。Journal of the Operational Research Society,49,66-75。  new window
13.Moinzadeh, K.、Aggarwal, P.(1997)。Analysis of a Production/Inventory System Subject to Random Disruptions。Management Science,43,1577-1588。  new window
14.Yamada, S.、Osaki, S.(1981)。A Note on Two Inspection Policies。Omega: The International Journal of Management Science,9,99-101。  new window
會議論文
1.Winlund, E. S.(1965)。Cost-effectiveness Management。0。87-96。  new window
圖書
1.Ross, S. M.(1993)。Introduction to Probability Models。Introduction to Probability Models。San Diego, CA:John Wiley and Sons, Inc.。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE