期刊論文1. | Montgomery, Douglas C.、Bazaraa, M. S.、Keswani, Ajit K.(1973)。Inventory Models with a Mixture of Backorders and Lost Sales。Naval Research Logistics,20(2),255-263。 |
2. | Wu, Kun-Shan、Ouyang, Liang-Yuh(2001)。(Q, r, L) Inventory Model with Defective Items。Computers & Industrial Engineering,39(1/2),173-185。 |
3. | Gallego, G.、Moon, I.(1993)。The distribution free newsboy problem: review and extensions。Journal of the Operational Research Society,44,825-834。 |
4. | Huang, Chao-Kuei(2004)。An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration。International Journal of Production Economics,91(1),91-98。 |
5. | Wee, H. M.、Yu, J.、Chen, M. C.(2007)。Optimal inventory model for items with imperfect quality and shortage backordering。Omega,35(1),7-11。 |
6. | Papachristos, S.、Konstantaras, I.(2006)。Economic ordering quantity models for items with imperfect quality。International Journal of Production Economics,100(1),148-154。 |
7. | Rosenblatt, M. J.、Lee, H. L.(1986)。Economic production cycles with imperfect production process。IIE Transactions,18(1),48-55。 |
8. | Hill, R. M.(1999)。The optimal production and shipment policy for the single-vendor single-buyer integrated production inventory problem。International Journal of Production Research,37(11),2463-2475。 |
9. | Lu, L.(1995)。A one-vendor multi-buyer integrated inventory model。European Journal of Operational Research,81(2),312-323。 |
10. | Banerjee, Avijit(1986)。A joint economic-lot-size model for purchaser and vendor。Decision Sciences,17(3),292-311。 |
11. | Goyal, S. K.(1977)。An Integrated Inventory Model for a Single Supplier-Single Customer Problem。International Journal of Production Research,15(1),107-111。 |
12. | Ha, D.、Kim, S. L.(1997)。Implementation of JIT Purchasing: An Integrated Approach。Production Planning and Control,8(2),152-157。 |
13. | Porteus, Evan L.(1986)。Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction。Operations Research,34(1),137-144。 |
14. | Paknejad, M. J.、Nasri, F.、Affisco, J. F.(1995)。Defective Units in a Continuous Review (s, Q) System。International Journal of Production Research,33(10),2767-2777。 |
15. | Lin, C. S.(1999)。Integrated Production-inventory Models with Imperfect Production Processes and a Limited Capacity for Raw Materials。Mathematical and Computer Modelling,29(2),81-89。 |
16. | Huang, C. K.(2002)。An Integrated Vendor-buyer Cooperative Inventory Model for Goods with Imperfect Quality。Production Planning & Control,13(4),355-361。 |
17. | Khouja, M.(2003)。The Impact of Quality Considerations on Material Flow in Two-stage Inventory Systems。International Journal of Production Research,41(7),1533-1547。 |
18. | Ouyang, Liang-Yuh、Wu, Kun-Shan、Ho, Chia-Huei(2006)。Analysis of Optimal Vendor-buyer Integrated Inventory Policy Involving Defective Items。International Journal of Advanced Manufacturing Technology,29(11/ 12),1232-1245。 |
19. | Moon, Ilkyeong、Choi, Sangjin(1997)。Distribution Free Procedures for Make-to-order (MTO), Make-in-advance (MIA), and Composite Policies。International Journal of Production Economics,48(1),21-28。 |
20. | Silver, Edward A.、Moon, Ilkyeong(2001)。The Multi-item Single Period Problem with an Initial Stock of Convertible Units。European Journal of Operational Research,132(2),466-477。 |