:::

詳目顯示

回上一頁
題名:螞蟻理論應用於資源限制下多目標專案之排程
書刊名:專案管理學刊
作者:林如貞林琨庭
作者(外文):Lin, Ru-jenLin, Kun-ting
出版日期:2009
卷期:2:1
頁次:頁23-42
主題關鍵詞:資源限制下專案排程螞蟻理論田口方法Resource constrained project schedulingAnt theoryTaguchi method
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:0
  • 點閱點閱:33
期刊論文
1.Hartmann, S.(1998)。A Competitive Genetic Algorithm for Resource-constrained Project Scheduling。Naval Research Logistics,45,733-750。  new window
2.Bouleimen, K.、Lecocq, H.(2003)。A New Efficient Simulated Annealing Algorithm for Resource-Constrained Project Scheduling Problem and its Multiple Mode Version。European Journal of Operational Research,149,268-281。  new window
3.Merkle, D.、Middendorf, M.、Schmeck, H.(2002)。Ant Colony Optimization for Resource-Constrained Project Scheduling。IEEE transactions on Evolutionary Computation,6,333-346。  new window
4.Mori, M.、Tseng, C. C.(1997)。A Genetic Algorithm for Multi-Mode Resource Constrained Project Scheduling Problem。European Journal of Operational Research,100(1),134-141。  new window
5.Dorigo, M.、Maniezzo, V.、Colorni, A.(1996)。The ant system: Optimizatoin by a colony of cooperating agents。IEEE Transactions on Systems, Man, and Cybernetics--Part B,26(1),29-41。  new window
6.Alcaraz, J.、Maroto, C.、Ruiz, R.(2003)。Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms。Journal of the Operational Research Society,54(6),614-626。  new window
7.蔡登茂(1996)。有限資源多專案排程啓發法之績效評估及應用。技術學刊,11(4)。  延伸查詢new window
8.Brucker, P.、Drexl, A.、Mohring, R.、Neumann, K.、Pesch, E.(1999)。Resource-Constrained Project Scheduling: Notation, Classification, Modes, and Methods。European Journal of Operational Research,112,3-41。  new window
9.Hartmann, S.(2002)。A Self-Genetic Algorithm for Project Scheduling under Resource Constraints。Naval Research Logistics,49,433-448。  new window
10.Leon V. J.、Ramamoorthy, B.(1995)。Strength and Adaptability of Problem-Space Based。Neighborhoods for Resource-Constrained Scheduling, OR Spektrum,17(2/3),173-182。  new window
11.Artigues, C.、Michelon, P.、Reusser, S.(2003)。Insertion Techniques for Static and Dynamic Resource-Constrained Project Scheduling。European Journal of Operational Research,149(2),249-267。  new window
12.Boctor, F. F.(1990)。Some Efficient Multi-Heuristic Procedures for Resource-Constrained Project Scheduling。European Journal of Operational Research,149(1),3-13。  new window
13.Bollnheimer, B.、Hartl, R. F.、Strauss, C.(1996)。An Improved Ant System Algorithm for the Vehicle Routing Problem。Annals of Operations Research,21,336-357。  new window
14.Jeea H. J.、Sachsb, E.(2000)。A Visual Simulation Technique For 3D Printing。Advances in Engineering Software,31,97-106。  new window
15.Kim, K. W.、Gen, M.、Yamazaki, G.(2003)。Hybrid Genetic Algorithm with Fuzzy Logic for Resource-Constrained Project Scheduling。Applied soft computing,2(3),174-188。  new window
16.Klein, R.(2001)。An Integrated Survey of Deterministic Project Scheduling, Omega。The International Journal of Management Science,29,249-272。  new window
17.Kolisch, R.、Padman R.(2000)。Bidirectional Planning: Improving Priority Rule-Based Heuristics for Scheduling Resource-Constrained Projects。European Journal of Operational Research,127(3),619-638。  new window
18.Valls, V.、Ballestin, F.、Quintanilla, S.(2005)。Justification and RCPSP: A Technique that Pays。European Journal of Operational Research,165,375-386。  new window
19.Leon V. J.、Ramamoorthy, B.(1995)。Strength and Adaptability of Problem-Space Based Neighborhoods for Resource-Constrained Scheduling。OR Spektrum,17(2/3),173-182。  new window
20.Kolisch, R.、Padman R.(1996)。Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation。European Journal of Operational Research,90(2),320-333。  new window
21.Liu, J. L.(2006)。Novel Taguchi-Simulated Annealing Method Applied to Airfoil and Wing Plan form Optimization。Journal of Aircraft,43(1),102-112。  new window
22.Schirmer A.(2000)。Case-Based Reasoning and Improved Adaptive Search for Project Scheduling。Naval Res. Logist,47(3),201-222。  new window
23.Fleszar, K.、Hindi, K. S.(2004)。Solving the Resource-Constrained Project Scheduling Problem by a Variable Neighbourhood Search。European Journal of Operational Research,155,402-413。  new window
會議論文
1.蔡登茂、賴明妮(2003)。資金與可重新使用資源限制下最大化專案總淨現値多專案排程問題之硏究,CIIE2003-273。  延伸查詢new window
研究報告
1.Dorigo, M.、Maniezzo, V.、Colorni, A.(1991)。Positive Feedback as a Search Strategy。Politecnico di Milano。  new window
學位論文
1.熊鴻鈞(2003)。螞蟻族群演算法於生產排程之應用(碩士論文)。國立暨南國際大學。  延伸查詢new window
2.蔡政峰(2000)。求解有限資源專案排程問題最佳化之硏究--以基因演算法求解。國立成功大學。  延伸查詢new window
3.林孟毅(2000)。演化演算法在硏發專案重排程問題上的應用。逢甲大學。  延伸查詢new window
4.馬郁淇(2005)。運用田口方法與DFP法於參數設計最佳化--以機構件射出成形製程為例。中華大學。  延伸查詢new window
5.高文慶(2004)。螞蟻演算法於有限資源專案排程最佳化之硏究。元智大學。  延伸查詢new window
6.張嘉君(2003)。應用模擬退火法求解營建工程專案多重資源排程最佳化之硏究。國立朝陽科技大學。  延伸查詢new window
7.曾明仁(1983)。資源限制專案計劃最短排程之硏究。淡江大學。  延伸查詢new window
8.詹竣凱(2006)。競爭式多目標最佳車削參數之硏究。大同大學。  延伸查詢new window
9.Pascoe, T. L.(1965)。An Experiment Comparison of Heuristics Method for Allocating Resource。Cambridge University。  new window
圖書
1.陳耀茂、黃廷彬(2006)。品質工程Excel應用手冊。  延伸查詢new window
其他
1.Möhring R. H.,Schulz, A. S.,Stork, F.,Uetz, M.(1965)。Solving Project Scheduling Problem by Minimum Cut Computation,Berlin, Germany。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE