期刊論文1. | Hartmann, S.(1998)。A Competitive Genetic Algorithm for Resource-constrained Project Scheduling。Naval Research Logistics,45,733-750。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
2. | Bouleimen, K.、Lecocq, H.(2003)。A New Efficient Simulated Annealing Algorithm for Resource-Constrained Project Scheduling Problem and its Multiple Mode Version。European Journal of Operational Research,149,268-281。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
3. | Merkle, D.、Middendorf, M.、Schmeck, H.(2002)。Ant Colony Optimization for Resource-Constrained Project Scheduling。IEEE transactions on Evolutionary Computation,6,333-346。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
4. | Mori, M.、Tseng, C. C.(1997)。A Genetic Algorithm for Multi-Mode Resource Constrained Project Scheduling Problem。European Journal of Operational Research,100(1),134-141。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
5. | Dorigo, M.、Maniezzo, V.、Colorni, A.(1996)。The ant system: Optimizatoin by a colony of cooperating agents。IEEE Transactions on Systems, Man, and Cybernetics--Part B,26(1),29-41。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
6. | Alcaraz, J.、Maroto, C.、Ruiz, R.(2003)。Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms。Journal of the Operational Research Society,54(6),614-626。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
7. | 蔡登茂(1996)。有限資源多專案排程啓發法之績效評估及應用。技術學刊,11(4)。 延伸查詢![new window](/gs32/images/newin.png) |
8. | Brucker, P.、Drexl, A.、Mohring, R.、Neumann, K.、Pesch, E.(1999)。Resource-Constrained Project Scheduling: Notation, Classification, Modes, and Methods。European Journal of Operational Research,112,3-41。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
9. | Hartmann, S.(2002)。A Self-Genetic Algorithm for Project Scheduling under Resource Constraints。Naval Research Logistics,49,433-448。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
10. | Leon V. J.、Ramamoorthy, B.(1995)。Strength and Adaptability of Problem-Space Based。Neighborhoods for Resource-Constrained Scheduling, OR Spektrum,17(2/3),173-182。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
11. | Artigues, C.、Michelon, P.、Reusser, S.(2003)。Insertion Techniques for Static and Dynamic Resource-Constrained Project Scheduling。European Journal of Operational Research,149(2),249-267。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
12. | Boctor, F. F.(1990)。Some Efficient Multi-Heuristic Procedures for Resource-Constrained Project Scheduling。European Journal of Operational Research,149(1),3-13。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
13. | Bollnheimer, B.、Hartl, R. F.、Strauss, C.(1996)。An Improved Ant System Algorithm for the Vehicle Routing Problem。Annals of Operations Research,21,336-357。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
14. | Jeea H. J.、Sachsb, E.(2000)。A Visual Simulation Technique For 3D Printing。Advances in Engineering Software,31,97-106。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
15. | Kim, K. W.、Gen, M.、Yamazaki, G.(2003)。Hybrid Genetic Algorithm with Fuzzy Logic for Resource-Constrained Project Scheduling。Applied soft computing,2(3),174-188。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
16. | Klein, R.(2001)。An Integrated Survey of Deterministic Project Scheduling, Omega。The International Journal of Management Science,29,249-272。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
17. | Kolisch, R.、Padman R.(2000)。Bidirectional Planning: Improving Priority Rule-Based Heuristics for Scheduling Resource-Constrained Projects。European Journal of Operational Research,127(3),619-638。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
18. | Valls, V.、Ballestin, F.、Quintanilla, S.(2005)。Justification and RCPSP: A Technique that Pays。European Journal of Operational Research,165,375-386。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
19. | Leon V. J.、Ramamoorthy, B.(1995)。Strength and Adaptability of Problem-Space Based Neighborhoods for Resource-Constrained Scheduling。OR Spektrum,17(2/3),173-182。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
20. | Kolisch, R.、Padman R.(1996)。Serial and Parallel Resource-Constrained Project Scheduling Methods Revisited: Theory and Computation。European Journal of Operational Research,90(2),320-333。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
21. | Liu, J. L.(2006)。Novel Taguchi-Simulated Annealing Method Applied to Airfoil and Wing Plan form Optimization。Journal of Aircraft,43(1),102-112。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
22. | Schirmer A.(2000)。Case-Based Reasoning and Improved Adaptive Search for Project Scheduling。Naval Res. Logist,47(3),201-222。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
23. | Fleszar, K.、Hindi, K. S.(2004)。Solving the Resource-Constrained Project Scheduling Problem by a Variable Neighbourhood Search。European Journal of Operational Research,155,402-413。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |