期刊論文1. | Connors, D. P.、Feigin, G. E.、Yao, D.(1996)。A Queueing Network Model for Semiconductor Manufacturing。IEEE Transactions on Semiconductor Manufacturing,9(3),412-427。 |
2. | Alpaydin, E.、Altinel, I. K.、Aras, N.(1996)。Parametric distance function vs. nonparametric neural networks for estimating road travel distances。European Journal of Operational Research,93(2),230-243。 |
3. | Backus, P.、Janakiram, M.、Mowzoon, S.、Runger, G. C.、Bhargava, A.(2006)。Factory cycle-time prediction with a data-mininga approach。IEEE Transactions on Semiconductor Manufacturing,19(2),252-258。 |
4. | Chambers, M.、Mount-Campbell, C. A.(2002)。Process optimization via neural network metamodeling。International Journal of Production Economics,79(2),93-100。 |
5. | Chauvet, F.、Proth, J. M.、Wardi, Y.(2001)。Scheduling no-wait production with time windows and flexible processing times。IEEE Transactions on Robotics and Automation,17(1),60-69。 |
6. | Chiang, D. M.、Guo, R. S.、Pai, F. Y.(2008)。Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories。International Journal of Production Research,46(17),4903-4923。 |
7. | Hsu, P. L.、Hsu, C. I.、Chang, P. C.、Chiu, C.(2006)。Regression trees approach for flow-time prediction in wafer manufacturing processes using constraint-based genetic algorithm。International Journal of Production Research,44(24),5327-5341。 |
8. | Huang, C. L.、Huang, Y. H.、Chang, T. Y.、Chang, S. H.、Chung, C. H.、Huang, D. T.、Li, R. K.(1999)。The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks。International Journal of Production Research,37(6),1387-1402。 |
9. | Kim, S.、Yea, S. H.、Kim, B.(2002)。Shift scheduling for stepper in the semiconductor wafer fabrication process。IIE Transactions,34(2),167-177。 |
10. | Leachman, R. C.、Kang, J.、Lin, V.(2002)。short cycle time and low inventory in manufacturing at samsung electronics。Interfaces,32(1),61-77。 |
11. | Lee, Y. H.、Kim, T.(2002)。Manufacturing cycle time reduction using balance control in the semiconductor fabrication line。Production Planning and Control,13(6),529-540。 |
12. | Liao, D. Y.、Wang, C. N.(2004)。Neural-network-based delivery time estimates for prioritized 300-mm automatic material handling operations。IEEE Transactions on Semiconductor Manufacturing,17(3),324-332。 |
13. | Lin, Y. H.、Lee, C. E.(2001)。A total standard WIP estimation method for wafer fabrication。European Journal of Operation Research,131(1),78-94。 |
14. | Narendra, K. S.(1996)。Neural networks for control: theory and practice。Proceedings of the IEEE,84(10),1385-1406。 |
15. | Pai, F. Y.(2004)。WIP management model for semiconductor back-end manufacturing。Journal of American Academy of Business,5(1/2),357-363。 |
16. | Qiu, R. G.(2005)。Virtual production line based WIP control for semiconductor manufacturing systems。International Journal of Production Economics,95(2),165-178。 |
17. | Wu, M. C.、Huang, Y. L.、Chang, Y. C.、Yang, K. F.(2006)。Dispatching in semiconductor fabs with machine-dedication features。International Journal of Advanced Manufacturing Technology,28(9),978-984。 |
18. | Yu, C. A.、Huang, H. P.(2002)。On-line learning delivery decision support system for high product mixed semiconductor foundry。IEEE Transactions on Semiconductor Manufacturing,15(2),274-278。 |
19. | Bonvik, A. M.、Couch, C. E.、Gershwin, S. B.(1997)。A comparison of production-line control mechanisms。International Journal of Production Research,35(3),789-804。 |
20. | Chen, H.、Harrison, J. M.、Mandelbaum, A.、Ackere, A. V.、Wein, L. M.(1988)。Empirical evaluation of a queueing network model for semiconductor wafer fabrication。Operations Research,36(2),202-215。 |
21. | Chien, C. F.、Hsiao, A.、Wang, I.(2004)。Constructing semiconductor manufacturing performance indexes and applying data mining for manufacturing data analysis。Journal of the Chinese Institute of Industrial Engineers,21(4),313-327。 |
22. | Chien, C. F.、Chen, C. H.(2007)。A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-basedsetups。OR Spectrum,29(3),391-419。 |
23. | Li, S.、Collins, D. W.、Tang, T.(1996)。Minimum Inventory Variability Schedule With Applications in Semiconductor Fabrication。IEEE Transactions on Semiconductor Manufacturing,9(1),145-149。 |
24. | Miller, D. J.(1990)。Simulation of a semiconductor manufacturing line。Communications of The ACM,33(10),99-108。 |
25. | Scholl, W.、Domaschke, J.(2000)。Implementation of Modeling and Simulation in Semiconductor Wafer Fabrication with Time Constraints between Wet Etch and Furnace Operations。IEEE Transactions on Semiconductor Manufacturing,13(3),273-277。 |
26. | Uzsoy, R.、Lee, C. Y.、Louis, A. M.(1992)。A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part I: System Characteristics, Performance Evaluation and Production Planning。IIE Transactions,24(4),47-60。 |
27. | Whitt, Ward(1993)。Approximations for the GI/G/m Queue。Production and Operations Management,2(2),114-161。 |
28. | Tu, Y. M.、Li, R. K.(1998)。Constraint time buffer determination model。IEEE International Journal of Production Research,36(4),1091-1103。 |
29. | Wein, L. M.(1988)。Scheduling Semiconductor Wafer Fabrication。IEEE Transactions on Semiconductor Manufacturing,1(3),115-130。 |
30. | Burman, D. Y.、Gurrola-Gal, F. J.、Nozari, A.、Sathaye, S.、Sitarik, J. P.(1986)。Performance Analysis Techniques for IC Manufacturing Lines。AT&T Technical Journal,65(4),46-57。 |