:::

詳目顯示

回上一頁
題名:Standard WIP Determination and WIP Balance Control with Time Constraints in Semiconductor Wafer Fabrication
書刊名:品質學報
作者:郭仲仁劉志明戚志揚
作者(外文):Kuo, Chung-jenLiu, Chih-mingChi, Chih-yang
出版日期:2008
卷期:15:6
頁次:頁409-423
主題關鍵詞:標準在製品存貨水準存貨平準生產週期時間時間限制倒傳遞類神經網路決策樹等候模式Standard WIPWIP balanceProduction cycle timeTime constraintBackpropagation neural networkDecision treeQueuing model
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:44
期刊論文
1.Connors, D. P.、Feigin, G. E.、Yao, D.(1996)。A Queueing Network Model for Semiconductor Manufacturing。IEEE Transactions on Semiconductor Manufacturing,9(3),412-427。  new window
2.Alpaydin, E.、Altinel, I. K.、Aras, N.(1996)。Parametric distance function vs. nonparametric neural networks for estimating road travel distances。European Journal of Operational Research,93(2),230-243。  new window
3.Backus, P.、Janakiram, M.、Mowzoon, S.、Runger, G. C.、Bhargava, A.(2006)。Factory cycle-time prediction with a data-mininga approach。IEEE Transactions on Semiconductor Manufacturing,19(2),252-258。  new window
4.Chambers, M.、Mount-Campbell, C. A.(2002)。Process optimization via neural network metamodeling。International Journal of Production Economics,79(2),93-100。  new window
5.Chauvet, F.、Proth, J. M.、Wardi, Y.(2001)。Scheduling no-wait production with time windows and flexible processing times。IEEE Transactions on Robotics and Automation,17(1),60-69。  new window
6.Chiang, D. M.、Guo, R. S.、Pai, F. Y.(2008)。Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories。International Journal of Production Research,46(17),4903-4923。  new window
7.Hsu, P. L.、Hsu, C. I.、Chang, P. C.、Chiu, C.(2006)。Regression trees approach for flow-time prediction in wafer manufacturing processes using constraint-based genetic algorithm。International Journal of Production Research,44(24),5327-5341。  new window
8.Huang, C. L.、Huang, Y. H.、Chang, T. Y.、Chang, S. H.、Chung, C. H.、Huang, D. T.、Li, R. K.(1999)。The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks。International Journal of Production Research,37(6),1387-1402。  new window
9.Kim, S.、Yea, S. H.、Kim, B.(2002)。Shift scheduling for stepper in the semiconductor wafer fabrication process。IIE Transactions,34(2),167-177。  new window
10.Leachman, R. C.、Kang, J.、Lin, V.(2002)。short cycle time and low inventory in manufacturing at samsung electronics。Interfaces,32(1),61-77。  new window
11.Lee, Y. H.、Kim, T.(2002)。Manufacturing cycle time reduction using balance control in the semiconductor fabrication line。Production Planning and Control,13(6),529-540。  new window
12.Liao, D. Y.、Wang, C. N.(2004)。Neural-network-based delivery time estimates for prioritized 300-mm automatic material handling operations。IEEE Transactions on Semiconductor Manufacturing,17(3),324-332。  new window
13.Lin, Y. H.、Lee, C. E.(2001)。A total standard WIP estimation method for wafer fabrication。European Journal of Operation Research,131(1),78-94。  new window
14.Narendra, K. S.(1996)。Neural networks for control: theory and practice。Proceedings of the IEEE,84(10),1385-1406。  new window
15.Pai, F. Y.(2004)。WIP management model for semiconductor back-end manufacturing。Journal of American Academy of Business,5(1/2),357-363。  new window
16.Qiu, R. G.(2005)。Virtual production line based WIP control for semiconductor manufacturing systems。International Journal of Production Economics,95(2),165-178。  new window
17.Wu, M. C.、Huang, Y. L.、Chang, Y. C.、Yang, K. F.(2006)。Dispatching in semiconductor fabs with machine-dedication features。International Journal of Advanced Manufacturing Technology,28(9),978-984。  new window
18.Yu, C. A.、Huang, H. P.(2002)。On-line learning delivery decision support system for high product mixed semiconductor foundry。IEEE Transactions on Semiconductor Manufacturing,15(2),274-278。  new window
19.Bonvik, A. M.、Couch, C. E.、Gershwin, S. B.(1997)。A comparison of production-line control mechanisms。International Journal of Production Research,35(3),789-804。  new window
20.Chen, H.、Harrison, J. M.、Mandelbaum, A.、Ackere, A. V.、Wein, L. M.(1988)。Empirical evaluation of a queueing network model for semiconductor wafer fabrication。Operations Research,36(2),202-215。  new window
21.Chien, C. F.、Hsiao, A.、Wang, I.(2004)。Constructing semiconductor manufacturing performance indexes and applying data mining for manufacturing data analysis。Journal of the Chinese Institute of Industrial Engineers,21(4),313-327。  new window
22.Chien, C. F.、Chen, C. H.(2007)。A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-basedsetups。OR Spectrum,29(3),391-419。  new window
23.Li, S.、Collins, D. W.、Tang, T.(1996)。Minimum Inventory Variability Schedule With Applications in Semiconductor Fabrication。IEEE Transactions on Semiconductor Manufacturing,9(1),145-149。  new window
24.Miller, D. J.(1990)。Simulation of a semiconductor manufacturing line。Communications of The ACM,33(10),99-108。  new window
25.Scholl, W.、Domaschke, J.(2000)。Implementation of Modeling and Simulation in Semiconductor Wafer Fabrication with Time Constraints between Wet Etch and Furnace Operations。IEEE Transactions on Semiconductor Manufacturing,13(3),273-277。  new window
26.Uzsoy, R.、Lee, C. Y.、Louis, A. M.(1992)。A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part I: System Characteristics, Performance Evaluation and Production Planning。IIE Transactions,24(4),47-60。  new window
27.Whitt, Ward(1993)。Approximations for the GI/G/m Queue。Production and Operations Management,2(2),114-161。  new window
28.Tu, Y. M.、Li, R. K.(1998)。Constraint time buffer determination model。IEEE International Journal of Production Research,36(4),1091-1103。  new window
29.Wein, L. M.(1988)。Scheduling Semiconductor Wafer Fabrication。IEEE Transactions on Semiconductor Manufacturing,1(3),115-130。  new window
30.Burman, D. Y.、Gurrola-Gal, F. J.、Nozari, A.、Sathaye, S.、Sitarik, J. P.(1986)。Performance Analysis Techniques for IC Manufacturing Lines。AT&T Technical Journal,65(4),46-57。  new window
圖書
1.Hopp, W. J.、Spearman, M. L.(2001)。Factory Physics: Foundations of Manufacturing Management。Irwin McGraw-Hill。  new window
2.Goldratt, E. M.、Cox, J.(1986)。The Goal: A Process of Ongoing Improvement。North River Press, Inc.。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE