:::

詳目顯示

回上一頁
題名:多期多產品之平行機綠色生產排程規劃
書刊名:高雄應用科技大學學報
作者:藍俊雄于健 引用關係蔡承叡蔡佳妏
作者(外文):Lan, Chun-hsiungYu, ChienTsai, Cheng-juiTsai, Chia-wen
出版日期:2009
卷期:38
頁次:頁21-47
主題關鍵詞:生產排程平行機控汙成本累進回溯式階段排程法Lingo 9.0Production schedulingParallel machineAntipollution costABSSA
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:16
期刊論文
1.Fullerton, R. R.、McWatters, C.(2001)。The Production Performance Benefits from JIT Implementation。Journal of Operations Management,19(1),81-96。  new window
2.Abou-Elela、Sohair I.、Hesham Abdel Haleem、Enas Abou-Taleb、Hanan S. Ibrahim(2007)。Application of cleaner production technology in chemical industry: a near zero emission。Journal of Cleaner Production,15,1852-1858。  new window
3.Balakrishman, R.、Linsmeier,TJ.3、Venkatanchalam,M.(1996)。Financial benefits from JIT adoption : effects of customer concentration and cost structure。The Accounting Review,71(2),183-205。  new window
4.Carnes, Thomas A.、Jefferson, P. Jones、Timothy, B. B.、Katherine, J. Barker(2003)。Just-in-time inventory systems innovation and the predictability of learnings。International Journal of Forecasting,19,743-749。  new window
5.Dobson, G.、Karmarker, U. S.(1989)。Simultaneous Resource Scheduling to Minimize Weighted Flow Times。Operations research,37(4),592-560。  new window
6.Droge, Cij、Germain, R(1998)。The just-in -time inventory effect: does it hold under different contextual, environmental and organization condition。Journal of Business Logistics,19(2),53-71。  new window
7.Gallup, James、Betsy, Marcotte(2004)。An assessment of the design and effectiveness o f the Environmental Pollution Prevention Project (EP3)。Journal of Cleaner Production,12,215-225。  new window
8.Hassin, Refael、Mati Shani(2005)。Machine scheduling with earliness, tardiness and non-execution penalties。Computers & Operations Research,32,683-705。  new window
9.Kesen, Saadettin Erhan、Omer Faruk Baykoc(2007)。Simulation of automated guided vehicle (AGV) systems based on just-in-time (JIT) philosophy in a job-shop environment。Simulation Modelling Practice and Theory,15,272-284。  new window
10.Krozer, Yoram(2008)。Life cycle costing for innovations in product chains。Journal of Cleaner Production,16,310-321。  new window
11.Lan, C.H.(2003)。The Design of a Multi-Conveyor System for Profit Maximization。The International Journal of Advanced Manufacturing Technology,22(7/8),510-521。  new window
12.Monden, Yasuhiro(2002)。The relationship between mini profit-center and JIT system。Int. J. Production Economics,80,145-154。  new window
13.Singer, M.、Pinedo, M.(1998)。A computational study o f branch and bound techniques for minimizing the total tardiness in job shops。IIE Scheduling Logistics,29,109-119。  new window
14.Wang, Shaojun、Bhaba R. Sarker(2006)。Production, Manufacturing and Logistics Optimal models for a multi-stage supply chain system controlled by kanban u nder just-in-time philosophy。European Journal of Operational Research,172,179-200。  new window
15.Freimer, Michael、Douglas Thomas、John Tyworth(2006)。The value of setup cost reduction and process improvement for the economic production quantity model with defects。European Journal of Operational Research,173,241-251。  new window
16.Xu, Yi、Bhaba R. Sarker(2003)。Models for a family of products with shelf life, and production and shortage costs in emerging markets。Computers & Operations Research,30,925-938。  new window
17.Abou-Elela, Sohair I.、Nasr, Fayza A.、Ibrahim, Hanan S.、Badr, Nagwa M.、Askalany, Abdul Raziq M.(2008)。Pollution prevention pays off in a board paper mill。Journal of Cleaner Production,16,330-334。  new window
18.Lee, W.(2005)。A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering。Omega,33(2),163-174。  new window
19.Satyaki Ghosh Dastidar、Rakesh Nagi(2005)。Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs。Computers & Operations Research,32,2987-3005。  new window
會議論文
1.Chen, T.-R.、Hisa, T. C.(1994)。Job Shop Scheduling with Multiple Resources and an Application to a Semiconductor Testing Facility。FL, U.S.A:LakeBuena Vista。1564-1570。  new window
圖書
1.Pinedo, M.(1995)。Scheduling Theory, Algorithms, and Systems。New Jersey:Prentice Hall。  new window
2.Stevenson, William J.(2002)。Operations Management。New York:McGraw-Hill。  new window
3.Baker, Kenneth R.(1974)。Introduction to Sequencing and Scheduling。John Wiley & Sons, Inc.。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE