:::

詳目顯示

回上一頁
題名:A Genetic Algorithm for Solving the Economic Lot Scheduling Problem with Reworks
書刊名:工業工程學刊
作者:張育仁姚銘忠 引用關係
作者(外文):Chang, Yu-jenYao, Ming-jong
出版日期:2009
卷期:26:5
頁次:頁411-425
主題關鍵詞:存貨重製排程遺傳演算法經濟批量InventoryReworksSchedulingGenetic algorithmEconomic lot
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:7
  • 點閱點閱:44
期刊論文
1.Boesel, J.、Nelson, B. L.、Ishii, N.(2003)。A Framework for Simulation-optimization Software。IIE Transactions,35,221-229。  new window
2.Grznar, J.、Riggle, C.(1997)。An Optimal Algorithm for the Basic Period Approach to the Economic Lot Scheduling Problem。International Journal of Management Science,25,355-364。  new window
3.Hsu, Wen-Lian(1983)。On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine。Management Science,29(1),93-105。  new window
4.Khouja, M.、Michalewicz, Z.、Wilmot, M.(1998)。The Use of Genetic Algorithms to Solve the Economic Lot Size Scheduling Problem。European Journal of Operational Research,110,509-524。  new window
5.Moon, I.、Silver, E. A.、Choi, S.(2002)。Hybrid Genetic Algorithm for the Economic Lot-scheduling Problem。International Journal of Production Research,40,809-824。  new window
6.Schrady, D. A.(1967)。A Deterministic Inventory Model for Repairable Items。Naval Research Logistics Quarterly,14,391-398。  new window
7.Yano, Candace Arai、Lee, Hau L.(19950401)。Lot Sizing with Random Yields: A Review。Operations Research,43(2),311-334。  new window
8.Lee, H. L.、Rosenblatt, M. J.(1987)。Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System。Management Science,33(9),1125-1136。  new window
9.Saxker, R.、Newton, C.(2002)。A Genetic Algorithm for solving economic lot size scheduling problem。Computers & Industrial Engineering,42,189-198。  new window
10.Bomberger, E. E.(1966)。A Dynamic Programming Approach to a Lot Size Scheduling Problem。Management Science,12(11),778-784。  new window
11.姚銘忠、陳英欽、Elmaghraby, Salah E.(20030900)。On the Feasibility Testing of the Economic Lot Scheduling Problem Using the Extended Basic Period Approach。工業工程學刊,20(5),435-448。new window  new window
12.Richter, K.(1996)。The EOQ Repair and Waste Disposal Model with Variable Setup Numbers。European Journal of Operational Research,96,313-324。  new window
13.Teunter, R. H.(2004)。Lot-sizing for inventory systems with product recovery。Computer & Industrial Engineering,46(3),431-441。  new window
14.Porteus, Evan L.(1986)。Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction。Operations Research,34(1),137-144。  new window
15.Barad, M.、Braha, D.(1996)。Control Limits for Multi-stage Manufacturing Processes with Binomial Yield (Single and Multiple Production Runs)。Journal of the Operational Research Society,47,98-112。  new window
16.Boctor, F. F.(1987)。The G-group Heuristic for Single Machine Lot Scheduling。International Journal of Production Research,25,363-379。  new window
17.Buscher, U.、Lindner, G.(2007)。Optimizing a Production System with Rework and Equal Sized Batch Shipments。Computers & Operations Research,34,515-535。  new window
18.Chatfield, D.(2007)。The Economic Lot Scheduling Problem: A Pure Genetic Search Approach。Computers and Operations Research,34,2865-2881。  new window
19.Elmaghraby, Salah E.(1978)。The Economic Lot Scheduling Problem (ELSP): Review and Extensions。Management Science,24(6),587-597。  new window
20.Flapper, S. D. P.、Fransoo, J. C.、Broekmeulen, R. A. C. M.、Inderfurth, K.(2002)。Planning and Control of Rework in the Process Industries: A Review。Production Planning & Control,13,26-34。  new window
21.Golany, B.、Yang, J.、Yu, G.(2001)。Economic Lot-Sizing with Remanufacturing Options。IIE Transactions,33,995-1003。  new window
22.Grosfeld-Nir, A.、Gerchak, Y.(2002)。Multistage Production to Order with Rework Capability。Management Science,48,652-664。  new window
23.Hunter, A.(1998)。Crossing Over Genetic Algorithms: The Sugal Generalised GA。Journal of Heuristics,4,179-192。  new window
24.Khouja, M.(2000)。The Economic Lot and Delivery Scheduling Problem: Common Cycle, Rework, and Variable Production Rate。IIE Transactions,32,715-725。  new window
25.Lee, H. L.(1992)。Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework。Management Science,38,1314-1328。  new window
26.Lopez, M. A.、Kingsmans, B. G.(1991)。The Economic Lot Scheduling Problem: Theory and Practice。International Journal of Production Economics,23,147-164。  new window
27.Porteus, E. L.(1990)。The Impact of Inspection Delay on Process and Inspection Lot Sizing。Management Science,36(8),999-1007。  new window
28.Richter, K.(1996)。The Extended EOQ Repair and Waste Disposal Model。International Journal of Production Economics,45,443-448。  new window
29.Tang, O.、Teunter, R. H.(2006)。Economic Lot Scheduling Problem with Returns。Production and Operations Management,15(4),488-497。  new window
30.Teunter, R. H.(2001)。Economic Ordering Quantities for Recoverable Item Inventory Systems。Naval Research Logistics,48,484-495。  new window
31.Teunter, R. H.、Bayindir, Z. P.、Heuvel, W. V. D.(2006)。Dynamic Lot Sizing with Product Returns and Remanufacturing。International Journal of Production Research,44,4377-4400。  new window
32.Teunter, R. H.、Kaparis, K.、Tang, O.(2008)。Multi-product Economic Lot Scheduling Problem with Separate Production Lines for Manufacturing and Remanufacturing。European Journal of Operational Research,191,1241-1253。  new window
33.Torabi, S. A.、Fatemi Ghomi, S. M. T.、Karimi, B.(2006)。A Hybrid Genetic Algorithm for the Finite Horizon Economic Lot and Delivery Scheduling in Supply Chains。European Journal of Operational Research,173,173-189。  new window
34.Wein, A. S.(1992)。Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment。Operations Research,40,551-563。  new window
學位論文
1.姚銘忠(1999)。The Economic Lot Scheduling Problem with Extension to Multiple Resource Constraints,Raleigh, NC。  new window
圖書
1.Winston, W. L.(1991)。Operations Research - Applications and Algorithms。PWS-Kent Publishing Company。  new window
2.Hanssmann, F.(1962)。Operations Research in Production and Inventory。Operations Research in Production and Inventory。New York, NY。  new window
3.Inderfurth, K.、Flapper, S. D. P.、Lambert, A. J. D.、Pappis, C. P.、Voutsinas, T. G.(2004)。Production Planning for Product Recovery Management。Reverse Logistics-Quantitative Models for Closed-Loop Supply Chains。  new window
其他
1.Pohlheim, H.。Evolutionary Algorithms: Principles, Methods and Algorithms。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關書籍
 
無相關著作
 
QR Code
QRCODE