期刊論文1. | Boesel, J.、Nelson, B. L.、Ishii, N.(2003)。A Framework for Simulation-optimization Software。IIE Transactions,35,221-229。 |
2. | Grznar, J.、Riggle, C.(1997)。An Optimal Algorithm for the Basic Period Approach to the Economic Lot Scheduling Problem。International Journal of Management Science,25,355-364。 |
3. | Hsu, Wen-Lian(1983)。On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine。Management Science,29(1),93-105。 |
4. | Khouja, M.、Michalewicz, Z.、Wilmot, M.(1998)。The Use of Genetic Algorithms to Solve the Economic Lot Size Scheduling Problem。European Journal of Operational Research,110,509-524。 |
5. | Moon, I.、Silver, E. A.、Choi, S.(2002)。Hybrid Genetic Algorithm for the Economic Lot-scheduling Problem。International Journal of Production Research,40,809-824。 |
6. | Schrady, D. A.(1967)。A Deterministic Inventory Model for Repairable Items。Naval Research Logistics Quarterly,14,391-398。 |
7. | Yano, Candace Arai、Lee, Hau L.(19950401)。Lot Sizing with Random Yields: A Review。Operations Research,43(2),311-334。 |
8. | Lee, H. L.、Rosenblatt, M. J.(1987)。Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System。Management Science,33(9),1125-1136。 |
9. | Saxker, R.、Newton, C.(2002)。A Genetic Algorithm for solving economic lot size scheduling problem。Computers & Industrial Engineering,42,189-198。 |
10. | Bomberger, E. E.(1966)。A Dynamic Programming Approach to a Lot Size Scheduling Problem。Management Science,12(11),778-784。 |
11. | 姚銘忠、陳英欽、Elmaghraby, Salah E.(20030900)。On the Feasibility Testing of the Economic Lot Scheduling Problem Using the Extended Basic Period Approach。工業工程學刊,20(5),435-448。 |
12. | Richter, K.(1996)。The EOQ Repair and Waste Disposal Model with Variable Setup Numbers。European Journal of Operational Research,96,313-324。 |
13. | Teunter, R. H.(2004)。Lot-sizing for inventory systems with product recovery。Computer & Industrial Engineering,46(3),431-441。 |
14. | Porteus, Evan L.(1986)。Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction。Operations Research,34(1),137-144。 |
15. | Barad, M.、Braha, D.(1996)。Control Limits for Multi-stage Manufacturing Processes with Binomial Yield (Single and Multiple Production Runs)。Journal of the Operational Research Society,47,98-112。 |
16. | Boctor, F. F.(1987)。The G-group Heuristic for Single Machine Lot Scheduling。International Journal of Production Research,25,363-379。 |
17. | Buscher, U.、Lindner, G.(2007)。Optimizing a Production System with Rework and Equal Sized Batch Shipments。Computers & Operations Research,34,515-535。 |
18. | Chatfield, D.(2007)。The Economic Lot Scheduling Problem: A Pure Genetic Search Approach。Computers and Operations Research,34,2865-2881。 |
19. | Elmaghraby, Salah E.(1978)。The Economic Lot Scheduling Problem (ELSP): Review and Extensions。Management Science,24(6),587-597。 |
20. | Flapper, S. D. P.、Fransoo, J. C.、Broekmeulen, R. A. C. M.、Inderfurth, K.(2002)。Planning and Control of Rework in the Process Industries: A Review。Production Planning & Control,13,26-34。 |
21. | Golany, B.、Yang, J.、Yu, G.(2001)。Economic Lot-Sizing with Remanufacturing Options。IIE Transactions,33,995-1003。 |
22. | Grosfeld-Nir, A.、Gerchak, Y.(2002)。Multistage Production to Order with Rework Capability。Management Science,48,652-664。 |
23. | Hunter, A.(1998)。Crossing Over Genetic Algorithms: The Sugal Generalised GA。Journal of Heuristics,4,179-192。 |
24. | Khouja, M.(2000)。The Economic Lot and Delivery Scheduling Problem: Common Cycle, Rework, and Variable Production Rate。IIE Transactions,32,715-725。 |
25. | Lee, H. L.(1992)。Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework。Management Science,38,1314-1328。 |
26. | Lopez, M. A.、Kingsmans, B. G.(1991)。The Economic Lot Scheduling Problem: Theory and Practice。International Journal of Production Economics,23,147-164。 |
27. | Porteus, E. L.(1990)。The Impact of Inspection Delay on Process and Inspection Lot Sizing。Management Science,36(8),999-1007。 |
28. | Richter, K.(1996)。The Extended EOQ Repair and Waste Disposal Model。International Journal of Production Economics,45,443-448。 |
29. | Tang, O.、Teunter, R. H.(2006)。Economic Lot Scheduling Problem with Returns。Production and Operations Management,15(4),488-497。 |
30. | Teunter, R. H.(2001)。Economic Ordering Quantities for Recoverable Item Inventory Systems。Naval Research Logistics,48,484-495。 |
31. | Teunter, R. H.、Bayindir, Z. P.、Heuvel, W. V. D.(2006)。Dynamic Lot Sizing with Product Returns and Remanufacturing。International Journal of Production Research,44,4377-4400。 |
32. | Teunter, R. H.、Kaparis, K.、Tang, O.(2008)。Multi-product Economic Lot Scheduling Problem with Separate Production Lines for Manufacturing and Remanufacturing。European Journal of Operational Research,191,1241-1253。 |
33. | Torabi, S. A.、Fatemi Ghomi, S. M. T.、Karimi, B.(2006)。A Hybrid Genetic Algorithm for the Finite Horizon Economic Lot and Delivery Scheduling in Supply Chains。European Journal of Operational Research,173,173-189。 |
34. | Wein, A. S.(1992)。Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment。Operations Research,40,551-563。 |