:::

詳目顯示

回上一頁
題名:Single-Machine Scheduling with Due-Date Assignment and Aging Effect under a Deteriorating Maintenance Activity Consideration
書刊名:International Journal of Information and Management Sciences
作者:Yang, Suh-jenqHsu, Chou-jungYang, Dar-li
出版日期:2010
卷期:21:2
頁次:頁177-195
主題關鍵詞:SchedulingDue-date assignmentAging effectMaintenance activity
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(4) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:4
  • 共同引用共同引用:2
  • 點閱點閱:33
Abstract This study investigates single-machine due-date assignment and scheduling problems with a job-dependent aging effect under a deteriorating maintenance activity consideration simultaneously. The maintenance activity can be scheduled immediately after any one of the jobs has been completed. In order to model the problem more realistic, we assume that: (1) once the maintenance activity has been completed, the machine will revert to its initial condition and the aging effect will start anew, and (2) the machine maintenance duration depends on its starting time. The objective is to find the optimal maintenance position as well as the optimal location of the common due-date for minimizing the total of earliness, tardiness and due-date costs. We introduce a polynomial time solution for the problem. We also present two special cases of the problem and show that they can be optimally solved by a lower order algorithm.
期刊論文
1.Chen, Jen-shiang、Yang, Jin-shan(20070900)。Alternative Models for Solving Single-Machine Scheduling with Tool Changes。International Journal of Information and Management Sciences,18:3,頁283-297。new window  new window
2.Chen, Wen-jinn、Tsou, Jia-chi(20081200)。Sequencing Heuristic for Scheduling Jobs with Periodic Maintenance。International Journal of Information and Management Sciences,19:4,頁635-649。new window  new window
3.Yao, Ming-jong、Huang, Jia-yen(20071200)。A Global-Optimization Algorithm for Solving the Maintenance Scheduling Problem for a Family of Machines。International Journal of Information and Management Sciences,18:4,頁365-386。new window  new window
4.Janiak, A.、Rudek, R.(2009)。Experience based approach to scheduling problems with the learning effect。IEEE Transactions on Systems, Man, and Cybernetics-Part A,39,344-357。  new window
5.Lee, C.-Y.、Leon, V.-J.(2001)。Machine scheduling with a rate-modifying activity。European Journal of Operational Research,128,119-128。  new window
6.Biskup, D.(2008)。A state-of-the-art review on scheduling with learning effects。European Journal of Operational Research,188,315-329。  new window
7.Kuo, W. H.、Yang, D. L.(20080600)。A note on due-date assignment and single-machine scheduling with deteriorating jobs。Journal of the Operational Research Society,59(6),857-859。  new window
8.Cheng, T.C.E.、L.Y. Kang、C.T. Ng(2004)。Due-date assignment and single-machine scheduling with deteriorating jobs。Journal of the Operational Research Society,55,198-203。  new window
9.Gordon, Valery S.、Proth, Jean-marie、Chu, Chengbin(20020516)。A survey of the state-of-art of common due date assignment and scheduling research。European Journal of Operational Research,139(1),1-25。  new window
10.Panwalker, S.、Smith, M.、Seidmann, A.(19820401)。Common due-date assignment to minimize total penalty for the one machine scheduling problem。Operations Research,30(2),391-399。  new window
11.Mosheiov, G.、Sidney, J. B.(2003)。Scheduling with general job-dependent learning curves。European Journal of Operational Research,147,665-670。  new window
12.Biskup, D.(1999)。Single-machine scheduling with learning considerations。European Journal of Operational Research,115,173-178。  new window
13.Baker, K. R.、Scudder, G. D.(1990)。Sequencing with earliness and tardiness penalties: A review。Operations Research,38(1),22-36。  new window
14.Schmidt, G.(2000)。Scheduling with limited machine availability。European Journal of Operational Research,121(1),1-15。  new window
15.Graham, R. L.、Lawler, E. L.、Lenstra, J. K.、Rinnooy Kan, A. H. G.(1979)。Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey。Annals of Discrete Mathematics,5,287-326。  new window
16.Cheng, T. C. E.、Gupta, M. C.(1989)。Survey of scheduling research involving due date determination decisions。European Journal of Operational Research,38(2),156-166。  new window
17.Chang, P.-C., Chen, S.-H. and Mani, V.,(2009)。A note on due-date assignment and single machine schedul-ing with a learning/aging effect。International Journal of Production Economics,117,142-149。  new window
18.Chen, J.-S.(2008)。Optimization models for the tool change scheduling problem。Omega,36,888-894。  new window
19.Chen, W.-J.(2009)。Minimizing number of tardy jobs on a single machine subject to periodic maintenance。Omega,37,591-599。  new window
20.Cheng, T. C. E.(1992)。Optimal single machine sequencing and assignment of common due-date。Computers& Industrial Engineering,22,115-120。  new window
21.Gawiejnowicz, S.,(2007)。Scheduling deteriorating jobs subject to job or machine availability constraints。European Journal of Operational Research,180,472-478。  new window
22.Gordon, V. S. and Tarasevich, A. A.,(2009)。A note: Common due date assignment for a single machinescheduling with the rate-modifying activity。Computers & Operations Research,36,325-328。  new window
23.Kubzin, M. A. and Strusevich, V. A.,(2005)。Two-machine flow shop no-wait scheduling with machinemaintenance。4OR: A Quarterly Journal of Operations Research,3,303-313。  new window
24.Kubzin, M. A. and Strusevich, V. A.,(2006)。Planning machine maintenance in two-machine shop schedul-ing。Operation Research,54,789-800。  new window
25.Ma, Y., Chu, C. and Zuo, C.(2010)。A survey of scheduling with deterministic machine availability con-straints。Computers & Industrial Engineering,58(2),199-211。  new window
26.Mosheiov, G.、Oron, D.(200612)。Due-date assignment and maintenance activity scheduling problem。Mathematical and Computer Modelling,44(11/12),1053-1057。  new window
27.Mosheiov, G. and Sarig, A.,(2009)。Scheduling a maintenance activity to minimize total weighted completion-time。Computer and Mathematics with Application,57,619-623。  new window
28.Mosheiov, G.、Sidney, J. B.(2010)。Scheduling a deteriorating maintenance activity on a single machine。Journal of the Operational Research Society,61(5),882-887。  new window
29.Yang, S.-J. and Yang, D.-L.,(201)。Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities。Omega,38(6),528-533。  new window
圖書
1.Brucker, P.(2001)。Scheduling Algorithms。New York:Springer-Verlag Inc.。  new window
2.Hardy, G. H., Littlewood, J. E. and Polya, G.,(1967)。Inequalities。London:Cambridge University Press。  new window
3.Papadimitriou, C. H.、Steiglitz, K.(1982)。Combinatorial Optimization: Algorithms and Complexity。Prentice-Hall, Inc.。  new window
圖書論文
1.Janiak, A.、Rudek, R.(2006)。Scheduling problems with position dependent job processing times。Scheduling in Computer and Manufacturing Systems。Warszawa:WKL。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top