:::

詳目顯示

回上一頁
題名:Scheduling Due Dates Assignment with Simultaneous Considerations of Time-Dependent and Position-Dependent Deterioration Effects and Deteriorating Maintenance on a Single Machine
書刊名:International Journal of Information and Management Sciences
作者:楊肅正 引用關係
作者(外文):Yang, Suh-jenq
出版日期:2012
卷期:23:3
頁次:頁a8+257-272
主題關鍵詞:生產排程共同交貨時間指派剩餘交貨時間指派退化效應退化性維修SchedulingCommon due date assignmentSlack due date assignmentDeterioration effectsDeteriorating maintenance
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:3
  • 點閱點閱:22
期刊論文
1.Yang, Suh-jenq、Hsu, Chou-jung、Yang, Dar-li(20100600)。Single-Machine Scheduling with Due-Date Assignment and Aging Effect under a Deteriorating Maintenance Activity Consideration。International Journal of Information and Management Sciences,21(2),177-195。new window  new window
2.Rudek, A.、Rudek, R.(201108)。A note on optimization in deteriorating systems using scheduling problems with the aging effect and resource allocation models。Computers and Mathematics with Applications,62(4),1870-1878。  new window
3.Cheng, T. C. E.、Ding, Q.、Lin, B. M. T.(2004)。A concise survey of scheduling with time-dependent processing times。European Journal of Operational Research,152(1),1-13。  new window
4.Wang, J.-B.、Guo, Q.(201002)。A due-date assignment problem with learning effect and deteriorating jobs。Applied Mathematical Modelling,34,309-313。  new window
5.Wang, X. Y.、Wang, M. Z.(201011)。Single machine common flow allowance scheduling with a rate-modifying activity。Computers & Industrial Engineering,59(4),898-902。  new window
6.Shabtay, D.、Steiner, G.(200803)。The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times。Annals of Operations Research,159(1),25-40。  new window
7.Kuo, W. H.、Yang, D. L.(20080600)。A note on due-date assignment and single-machine scheduling with deteriorating jobs。Journal of the Operational Research Society,59(6),857-859。  new window
8.Gordon, Valery S.、Proth, Jean-marie、Chu, Chengbin(20020516)。A survey of the state-of-art of common due date assignment and scheduling research。European Journal of Operational Research,139(1),1-25。  new window
9.Hsu., C.-J.、Yang, S.-J.、Yang, D.-L.(201105)。Two due date assignment problems with position-dependent processing time on a single-machine。Computers & Industrial Engineering,60(4),796-800。  new window
10.Panwalker, S.、Smith, M.、Seidmann, A.(19820401)。Common due-date assignment to minimize total penalty for the one machine scheduling problem。Operations Research,30(2),391-399。  new window
11.Lai, P. J.、Lee, W. C.(20100516)。Single-machine scheduling with a nonlinear deterioration function。Information Processing Letters,110(11),455-459。  new window
12.Wang, J.-B.、Wang, M.-Z.(201201)。Single-machine scheduling with nonlinear deterioration。Optimization Letters,6(1),87-98。  new window
13.Wang, J.-B.、Huang, X.、Wu, Y.-B.、Ji, P.(201205)。Group scheduling with independent setup times, ready times, and deteriorating job-processing times。The International Journal of Advanced Manufacturing Technology,60(5/8),643-649。  new window
14.Mosheiov, G.、Sidney, J. B.(201005)。Scheduling a deteriorating maintenance activity on a single machine。Journal of the Operational Research Society,61(5),882-887。  new window
15.Kubzin, M. A.、Strusevich, V. A.(2006)。Planning machine maintenance in two-machine shop scheduling。Operations Research,54(4),789-800。  new window
16.Wu, Yu-bin(20111200)。Single-machine Scheduling Resource-dependent Deteriorating Jobs with a Learning Effect。International Journal of Information and Management Sciences,22(4),395-405。new window  new window
17.Wu, Yu-bin(20111200)。Parallel Machines Scheduling with Rate-modifying Activities and Total Absolute Differences Penalties。International Journal of Information and Management Sciences,22(4),407-418。new window  new window
18.Graham, R. L.、Lawler, E. L.、Lenstra, J. K.、Rinnooy Kan, A. H. G.(1979)。Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey。Annals of Discrete Mathematics,5,287-326。  new window
19.Gawiejnowicz, Stanislaw、Kononov, Alexander(20100100)。Complexity and approximability of scheduling resumable proportionally deteriorating jobs。European Journal of Operational Research,200(1),305-308。  new window
20.Mosheiov, G.、Oron, D.(200612)。Due-date assignment and maintenance activity scheduling problem。Mathematical and Computer Modelling,44(11/12),1053-1057。  new window
21.Adamopoulos, G. I.、Pappis, C. P.(199610)。Single machine scheduling with flow allowances。Journal of the Operational Research Society,47(10),1280-1285。  new window
22.Cheng, T. C. E.、Lee, W. C.、Wu, C. C.(201012)。Single-machine scheduling with deteriorating functions for job processing times。Applied Mathematical Modelling,34(12),4171-4178。  new window
23.Janiak, A.、Rudek, R.(201006)。Scheduling jobs under an aging effect。Journal of the Operational Research Society,61(6),1041-1048。  new window
24.Ji, M.、He, Y.、Cheng, T. C. E.(200610)。Scheduling linear deteriorating jobs with an availability constraint on a single machine。Theoretical Computer Science,362(1/3),115-126。  new window
25.Kubzin, M. A.、Strusevich, V. A.(200512)。Two-machine flow shop no-wait scheduling with machine maintenance。A Quarterly Journal of Operations Research,3(4),303-313。  new window
26.Lee, W. C.、Wu, C. C.(200803)。Multi-machine scheduling with deteriorating jobs and scheduled maintenance。Applied Mathematical Modelling,32(3),362-373。  new window
27.Lodree Jr., E. J.、Geiger, C. D.(201003)。A note on the optimal sequence position for a ratemodifying activity under simple linear deterioration。European Journal of Operational Research,201(2),644-648。  new window
28.Low, C.、Hsu, C. J.、Su, C. T.(200807)。Minimizing the makespan with an availability constraint on a single machine under simple linear deterioration。Computers & Mathematics with Applications,56(1),257-265。  new window
29.Shabtay, D.(201001)。Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs。Journal of Production Economics,123(1),235-242。  new window
30.Wang, J. B.、Wei, C. M.(201106)。Parallel machines scheduling with a deteriorating maintenance activity and total absolute differences penalties。Applied Mathematics and Computation,217(20),8093-8099。  new window
31.Wang, J. J.、Wang, J. B.、Liu, F.(201110)。Parallel machines scheduling with a deteriorating maintenance activity。Journal of the Operational Research Society,62(10),1898-1902。  new window
32.Wu, C. C.、Lee, W. C.(200307)。Scheduling linear deteriorating jobs to minimize makespan with an availability constraint on a single machine。Information Processing Letters,87(2),89-93。  new window
33.Yang, S. J.、Yang, D. L.(2010)。Single-machine scheduling problems with aging/deteriorating effect under an optional maintenance activity consideration。INFOR: Information Systems and Operational Research,48(3),171-179。  new window
34.Zhao, C. L.、Tang, H. Y.、Cheng, C. D.(200910)。Two-parallel machines scheduling with ratemodifying activities to minimize total completion time。European Journal of Operational Research,198(1),354-357。  new window
圖書
1.Jozefowska, J.(2007)。Just-in-Time Scheduling: Models and Algorithms for Computer and Manufacturing Systems。New York, NY:Springer-Verlag Inc.。  new window
2.Gawiejnowicz, S.(2008)。Time-dependent Scheduling。Berlin:Springer-Verlag。  new window
3.Hardy, G. H.、Littlewood, J. E.、Polya, G.(1967)。Inequalities。London:Cambridge University Press。  new window
其他
1.Rudek, R.(201207)。Scheduling problems with position dependent job processing times: computational complexity results。  new window
圖書論文
1.Janiak, A.、Rudek, R.(2006)。Scheduling problems with position dependent job processing times。Scheduling in Computer and Manufacturing Systems。Warszawa:WKL。  new window
2.Gordon, V. S.、Proth, J. M.、Strusevich, V. A.(2004)。Scheduling with due date assignment。Handbook of Scheduling: Algorithms, Models and Performance Analysis。Boca Raton, FL:CRC Press。  new window
3.Kaminsky, P.、Hochbaum, D.(2004)。Due date quotation models and algorithms, Handbook of Scheduling: Algorithms。Models and Performance Analysis。Boca Raton, FL.:CRC Press。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top