題名:Bicriteria Supply Chain Scheduling on Unrelated-Parallel Machines
書刊名:工業工程學刊
作者:Mehravaran, YasamanLogendran, Rasaratnam
出版日期:2011
卷期:28:2
頁次:頁91-101
主題關鍵詞:雙重排程非相關平行機臺工作順序相依整備供應鏈Bicriteria schedulingUnrelated-parallel machinesSequence-dependent setupsSupply chain
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:0
  • 點閱點閱:11
This article addresses the unrelated-parallel machine scheduling problem with sequence-dependent setup times for minimizing the work-in-process inventory (WIP) while maximizing the customer service level in a supply chain. The machine availabilities and job releases are considered dynamic. In order to meet a variety of needs of the producer and customers, a mathematical model that conforms to a bicriteria objective has been developed. As the proposed research problem is shown to be NP-hard, a metasearch heuristic based upon tabu search is also developed to solve industry-size problems. Moreover, to evaluate the effectiveness of the proposed search algorithm, the search algorithmic solutions obtained for example problems are compared with that of the optimal solutions of the mathematical model obtained from CPLEX. To the best of our knowledge, this research is the first of its kind attempted for this scheduling problem in a supply chain.
期刊論文
1.Suresh, V.、Chaudhuri, D.(1994)。Minimizing maximum tardiness for unrelated parallel-machines。International Journal of Production Economics,34(2),223-229。  new window
其他
1.Azizoglu, M. and Kirca, O.(1999)。Scheduling jobs on unrelated parallel machines to minimize regular total cost functions。  new window
2.Chauhan, S., Gordon, V. andProth, J.(2007)。Scheduling in supply chain environment。  new window
3.Chen, Z. and Hall, N.(2007)。Supply chain scheduling: conflict and cooperation in assembly systems。  new window
4.Chen, Z. and Vairaktarakis, G.(2005)。Integrated scheduling of production and distribution operations。  new window
5.Choua, F. and Lee, C.(1999)。Two-machine flowshop scheduling with bicriteria problem。  new window
6.Eren, T.(2009)。A note on minimizing maximum lateness in an m-machine scheduling problem with a learning effect。  new window
7.Eren, T.(2009)。Minimizing the total weighted completion time on a single machine scheduling with release dates and a learning effect。  new window
8.Eren, T. and Güner, E.(2006)。A bicriteria scheduling with sequence-dependent setup times。  new window
9.Koksalan, M. and Keha, A.B.(2003)。Using genetic algorithms for single-machine bicriteria scheduling problems。  new window
10.Logendran, R., McDonell, B. and Smucker, B.(2007)。Scheduling unrelated machines with sequence dependent setups。  new window
11.Logendran, R. and Subur, F.(2004)。Unrelated parallel machine scheduling with job splitting。  new window
12.Mansouri, A., Hendizadeh, H. and Salmasi, N.(2009)。Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times。  new window
13.Montgomery, D.C.(2008)。Design and Analysis of Experiments。  new window
14.Suresh, V. and Chaudhuri, D.(1996)。Biciteria scheduling problem for unrelated parallel machines。  new window
15.Yaghubian, A.R., Hodgson, T.J., Joines, J.A., Culbreth, C.T. and Huang, J.C.(1999)。Dry kiln scheduling in furniture production。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE