:::

詳目顯示

回上一頁
題名:Decision Support System for Rehabilitation Scheduling to Enhance the Service Quality and the Effectiveness of Hospital Resource Management
書刊名:工業工程學刊
作者:鄭怡詔鄭家年簡禎富
作者(外文):Huang, Yi-chaoZheng, Jia-nianChien, Chen-fu
出版日期:2012
卷期:29:5
頁次:頁348-363
主題關鍵詞:決策支援系統混合排程基因演算法復健全面資源管理醫院管理Decision support systemHybrid shop schedulingGenetic algorithmRehabilitationtotal Resource managementHospital management
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:3
  • 點閱點閱:87
In hospitals, rehabilitation inpatients often complain about long waiting time between the therapeutic processes. Due to the partial precedence constraints of rehabilitation therapies, the rehabilitation scheduling problem is a hybrid shop scheduling problem. This article aims to construct a decision support system for rehabilitation scheduling. Equipped with the developed genetic algorithm, this system can generate the optimal schedules for rehabilitation patients to minimize waiting time and thus enhance service quality and overall resource effectiveness of rehabilitation facilities. The developed system is also equipped with GUI (graphical user interfaces) to provide scheduling information including Gantt charts and scheduling lists to support various users including therapists and inpatients. We conducted an empirical study in a general hospital for validation. The results showed that the waiting time of each inpatient is reduced significantly and thus demonstrated the practical viability of the proposed solution to enhance the effectiveness of hospital resource management. The developed system has been implemented online in the hospital.
期刊論文
1.Chien, C.-F.、Tseng, F. P.、Chen, C. H.(2008)。An evolutionary approach to rehabilitation patient scheduling: a case study。European Journal of Operational Research,189(3),1234-1253。  new window
2.Chien, C.-F.、Chen, H.-K.、Wu, J.-Z.、Hu, C.-H.(2007)。Construct the OGE for promoting tool group productivity in semiconductor manufacturing。International Journal of Production Research,45(3),509-524。  new window
3.Boberg, E.W.、D.H. Gustafson、R.P. Hawkins、C.- L. Chan、E. Bricker、S. Pingree、H. Berhe、A. Peressini(1995)。Development, acceptance, and use patterns of a computer-based education and social support system for people living with AIDS/HIV infection。Computers in Human Behavior,11(2),289-311。  new window
4.Chang, C.、R. Wu、J. Lin(2009)。A Dual Route Planning for Unknown Scaled Emergency Management。Journal of the Chinese Institute of Industrial Engineers,26(3),195-204。  new window
5.Cheng, R.、M. Gen、Y. Tsujimura(1996)。A tutorial survey of job-shop scheduling problems using genetic algorithms: part I. Representation。Computers and Industrial Engineering,30(4),983-997。  new window
6.Chekuri, C.、R. Motwani(1999)。Precedence constraints scheduling to minimize sum of weighted completion times on a single machine。Discrete Applied Mathematics,98,29-38。  new window
7.Cheung, W.、H. Zhou(2001)。Using Genetic Algorithms and Heuristics for job Shop Scheduling with Sequence-Dependent Setup times。Annals of Operations Research,107,65-81。  new window
8.Chien, C.-F.、C. Hu(2011)。Total Resource Management Framework: An Empirical Study of Semiconductor Fab。Journal of Quality,18(6),581-607。  new window
9.Chien, C.(2009)。A hybrid approach of data mining and genetic algorithms for rehabilitation scheduling。International Journal of Manufacturing Technology and Management,16(1),76-100。  new window
10.Chien, C.-F.、Wu, C.-H.、Chiang, Y.-H.(2012)。Coordinated capacity migration and expansion planning for semiconductor manufacturing under demand uncertainties。International Journal of Production Economics,135(2),860-869。  new window
11.Dias, T.M.、D.F. Ferber、C.C.D. Souza、A.V. Moura(2003)。Constructing nurse schedules at large hospitals。International Transactions in Operational Research,10(3),245-265。  new window
12.Dorndorf, U.、E. Pesch(1995)。Evolution based learning in a job shop scheduling environment。Computers and Operations Research,22,25-40。  new window
13.Gerrits, M.、P. Hogeweg(1991)。Redundant coding of an NP-complete problem allows effective Genetic Algorithm search。Parallel Problem Solving from Nature,496,70-74。  new window
14.Gladish, B.P.、M.A. Parra、A.B. Terol、M.V. Rodriguez(2005)。Management of surgical waiting lists through a Possibilistic Linear Multiobjective Programming problem。Applied Mathematics and Computation,167,477-495。  new window
15.Gong, D.-C.、C. Chiu、K. Wang、K. Chang、H. Chen、M. Yang(2001)。A Hospital Public Transportation System’s Route and Schedule Planning。Journal of the Chinese Institute of Industrial Engineers,18(2),43-56。  new window
16.Grunow, M.、H.O. Guenther、G. Yang(2004)。Development of a Decision Support Model for Scheduling Clinical Studies and Assign Medical Personnel。Health Care Management Science,7,305-317。  new window
17.Hartmann, S.(1998)。A competitive genetic algorithm for resource-constrained project scheduling。Naval Research Logistics,45(7),733-750。  new window
18.Huang, Y.(2004)。Constructing web-based hospital executive information system and an empirical study。Journal of the Chinese Institute of Industrial Engineers,21(2),101-112。  new window
19.Juang, W.C.、M.C. Liao、C.L. Sy、Y.T. Chang、Y.C. Kuo、C.Y. Chang、S.R. Wann、H.T. Chang(2006)。Computer-based Optimization for Scheduling Emergency Department Physicians。Journal of Taiwan Emergency Medicine,8(3),99-105。  new window
20.Kim, S. C.、Horowitz, I.、Young, K. K.、Buckley, T. A.(2000)。Flexible bed allocation and performance in the intensive care unit。Journal of Operations Management,18(4),427-443。  new window
21.Lee, W.、T. Chang、T. Chang(2007)。The Relationship between Quality of Healthcare Service and Customer Satisfaction – €“ An Example of Hospitals in Taiwan。Journal of the Chinese Institute of Industrial Engineers,24(1),81-95。  new window
22.Levner, E.、M. Vlach(1999)。Single-machine scheduling with mixed precedence constraints。Journal of Operations Research, Society of Japan,42(3),330-341。  new window
23.Liaw, C.F.(2000)。A hybrid genetic algorithm for the open shop scheduling problem。European Journal of Operational Research,124,28-42。  new window
24.Liaw, C.F.、C.Y. Cheng、M. Chen(1251)。The total completion time open shop scheduling problem with a given sequence of jobs on one machine。Computers and Operations Research,29,1251-1266。  new window
25.Liu, C.、Chien, C.-F.、Ho, I.(1998)。An Object- Oriented Analysis and Design Method for Shop Floor Control Systems。International Journal of Computer Integrated Manufacturing,11(5),379-400。  new window
26.Marinagi, C.C.、C.D. Spyropoulosa、C. Papatheodorou、S. Kokkotos(2000)。Continual planning and scheduling for managing patient tests in hospital laboratories。Artificial Intelligence in Medicine,20,139-154。  new window
27.Ogulata, S.N.、M. Koyuncu、E. Karakas(2008)。Personnel and patient scheduling in the high demanded hospital services: A case study in the physiotherapy service。Journal of Medical Systems,32(3),221-228。  new window
28.Ramudhin, A.、P. Marier(1996)。The Generalized Shifting Bottleneck Procedure。European Journal of Operational Research,93,34-48。  new window
29.Rothlauf, F.、D.E. Goldberg(2003)。Redundant Representations in Evolutionary Computation。Evolutionary Computation,11(4),381-415。  new window
30.Shital, S.、A. Kusiak(2006)。Cancer gene search with data-mining and genetic algorithms。Computers in Biology and Medicine,37(2),251-261。  new window
31.Wang, Y.Z.(2003)。Using genetic algorithm methods to solve course scheduling problem。Expert systems with Application,25,39-50。  new window
32.Watanabe, M.、K. Ida、M. Gen(2005)。A genetic algorithm with modified crossover operator and search area adaptation for the job-shop scheduling problem。Computers and Industrial Engineering,48,743-752。  new window
33.Wu, J.-Z.(2011)。Inventory write-down prediction for semiconductor manufacturing considering inventory age, accounting principle, and product structure with real settings。Computers & Industrial Engineering。  new window
34.Wu, J.-Z.、X.-C. Hao、C.-F. Chien、M. Gen。A Novel Bi-Vector Encoding Genetic Algorithm for the Simultaneous Multiple Resources Scheduling Problem。Journal of Intelligent Manufacturing。  new window
35.Yu, H.、W. Liang(2001)。Neural network and genetic algorithm-based hybrid approach to expanded jobshop scheduling。Computers and Industrial Engineering,39,337-356。  new window
36.Zhou, H.、Feng, Y.、Han, L.(2001)。The Hybrid Heuristic Genetic Algorithm for Job Shop Scheduling。Computers and Industrial Engineering,40,191-200。  new window
37.Bard, J. F.、Purnomo, H. W.(2005)。Preference scheduling for nurses using column generation。European Journal of Operational Research,164(2),510-534。  new window
38.Mori, M.、Tseng, C. C.(1997)。A Genetic Algorithm for Multi-Mode Resource Constrained Project Scheduling Problem。European Journal of Operational Research,100(1),134-141。  new window
39.Cheng, R.、Gen, M.、Tsujimura, Y.(1999)。A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: Hybrid genetic search strategies。Computers & Industrial Engineering,36(2),343-364。  new window
40.Margarida, M.、V.P. Margarida(2007)。A genetic algorithm approach to a nurse rerostering problem。Computers & Operations Research,34(3),667-691。  new window
41.Wu, J.-Z.、Chien, C.-F.、Gen, M.(2012)。Coordinating strategic outsourcing decisions for semiconductor assembly using a bi-objective genetic algorithm。International Journal of Production Research,50(1),235-260。  new window
42.Spyropoulos, C. D.(2000)。AI planning and scheduling in the medical hospital environment。Artificial Intelligence in Medicine,20(2),101-111。  new window
43.Garey, M. R.、Johnson, D. S.、Sethi, R.(1976)。The complexity of flowshop and jobshop scheduling。Mathematics of Operations Research,1(2),117-129。  new window
44.Li, S.H.A.、Li, S.H.A.(2009)。A two-stage modeling with genetic algorithms for the nurse scheduling problem。Expert Systems with Applications,36(5),9506-9512。  new window
45.吳吉政、許嘉裕(20090400)。Critical Success Factors for Improving Decision Quality on Collaborative Design in the IC Supply Chain。品質學報,16(2),95-108。new window  new window
46.Hartmann, S.(2002)。A Self-adapting Genetic Algorithm for Project Scheduling under Resource Constraints。Naval Research Logistics,49(5),433-448。  new window
47.Chien, C.-F.、Deng, J. F.(2004)。A Container Packing Support System for Determining and Visualizing Container Packing Patterns。Decision Support Systems,37(1),23-34。  new window
48.Aickelin, U.、Dowsland, K. A.(2004)。An indirect Genetic Algorithm for a nurse-scheduling problem。Computers & Operations Research,31,761-778。  new window
49.Park, B. J.、Choi, H. R.、Kim, H. S.(2003)。A hybrid genetic algorithm for the job shop scheduling problems。Computers & Industrial Engineering,45,597-613。  new window
會議論文
1.Julstrom, B.A.(1999)。Redundant genetic encodings may not be harmful。the Genetic and Evolutionary Computation Conference,79。  new window
圖書
1.Pagliarulo, M. A.(2001)。Introduction to Physical Therapy。St. Louis:Mosby。  new window
2.Gen, Mitsuo、Cheng, Runwei(2000)。Genetic Algorithms and Engineering Optimization。New York:John Wiley & Sons。  new window
3.Gen, M.、Cheng, R.(1997)。Genetic Algorithms and Engineering Design。New York:John Wiley & Sons。  new window
4.Goldberg, D. E.(1989)。Genetic Algorithms in Search, Optimization and Machine Learning。Addison-Wesley Publishing Company Inc.。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top