期刊論文1. | Chien, C.-F.、Tseng, F. P.、Chen, C. H.(2008)。An evolutionary approach to rehabilitation patient scheduling: a case study。European Journal of Operational Research,189(3),1234-1253。 |
2. | Chien, C.-F.、Chen, H.-K.、Wu, J.-Z.、Hu, C.-H.(2007)。Construct the OGE for promoting tool group productivity in semiconductor manufacturing。International Journal of Production Research,45(3),509-524。 |
3. | Boberg, E.W.、D.H. Gustafson、R.P. Hawkins、C.- L. Chan、E. Bricker、S. Pingree、H. Berhe、A. Peressini(1995)。Development, acceptance, and use patterns of a computer-based education and social support system for people living with AIDS/HIV infection。Computers in Human Behavior,11(2),289-311。 |
4. | Chang, C.、R. Wu、J. Lin(2009)。A Dual Route Planning for Unknown Scaled Emergency Management。Journal of the Chinese Institute of Industrial Engineers,26(3),195-204。 |
5. | Cheng, R.、M. Gen、Y. Tsujimura(1996)。A tutorial survey of job-shop scheduling problems using genetic algorithms: part I. Representation。Computers and Industrial Engineering,30(4),983-997。 |
6. | Chekuri, C.、R. Motwani(1999)。Precedence constraints scheduling to minimize sum of weighted completion times on a single machine。Discrete Applied Mathematics,98,29-38。 |
7. | Cheung, W.、H. Zhou(2001)。Using Genetic Algorithms and Heuristics for job Shop Scheduling with Sequence-Dependent Setup times。Annals of Operations Research,107,65-81。 |
8. | Chien, C.-F.、C. Hu(2011)。Total Resource Management Framework: An Empirical Study of Semiconductor Fab。Journal of Quality,18(6),581-607。 |
9. | Chien, C.(2009)。A hybrid approach of data mining and genetic algorithms for rehabilitation scheduling。International Journal of Manufacturing Technology and Management,16(1),76-100。 |
10. | Chien, C.-F.、Wu, C.-H.、Chiang, Y.-H.(2012)。Coordinated capacity migration and expansion planning for semiconductor manufacturing under demand uncertainties。International Journal of Production Economics,135(2),860-869。 |
11. | Dias, T.M.、D.F. Ferber、C.C.D. Souza、A.V. Moura(2003)。Constructing nurse schedules at large hospitals。International Transactions in Operational Research,10(3),245-265。 |
12. | Dorndorf, U.、E. Pesch(1995)。Evolution based learning in a job shop scheduling environment。Computers and Operations Research,22,25-40。 |
13. | Gerrits, M.、P. Hogeweg(1991)。Redundant coding of an NP-complete problem allows effective Genetic Algorithm search。Parallel Problem Solving from Nature,496,70-74。 |
14. | Gladish, B.P.、M.A. Parra、A.B. Terol、M.V. Rodriguez(2005)。Management of surgical waiting lists through a Possibilistic Linear Multiobjective Programming problem。Applied Mathematics and Computation,167,477-495。 |
15. | Gong, D.-C.、C. Chiu、K. Wang、K. Chang、H. Chen、M. Yang(2001)。A Hospital Public Transportation System’s Route and Schedule Planning。Journal of the Chinese Institute of Industrial Engineers,18(2),43-56。 |
16. | Grunow, M.、H.O. Guenther、G. Yang(2004)。Development of a Decision Support Model for Scheduling Clinical Studies and Assign Medical Personnel。Health Care Management Science,7,305-317。 |
17. | Hartmann, S.(1998)。A competitive genetic algorithm for resource-constrained project scheduling。Naval Research Logistics,45(7),733-750。 |
18. | Huang, Y.(2004)。Constructing web-based hospital executive information system and an empirical study。Journal of the Chinese Institute of Industrial Engineers,21(2),101-112。 |
19. | Juang, W.C.、M.C. Liao、C.L. Sy、Y.T. Chang、Y.C. Kuo、C.Y. Chang、S.R. Wann、H.T. Chang(2006)。Computer-based Optimization for Scheduling Emergency Department Physicians。Journal of Taiwan Emergency Medicine,8(3),99-105。 |
20. | Kim, S. C.、Horowitz, I.、Young, K. K.、Buckley, T. A.(2000)。Flexible bed allocation and performance in the intensive care unit。Journal of Operations Management,18(4),427-443。 |
21. | Lee, W.、T. Chang、T. Chang(2007)。The Relationship between Quality of Healthcare Service and Customer Satisfaction – An Example of Hospitals in Taiwan。Journal of the Chinese Institute of Industrial Engineers,24(1),81-95。 |
22. | Levner, E.、M. Vlach(1999)。Single-machine scheduling with mixed precedence constraints。Journal of Operations Research, Society of Japan,42(3),330-341。 |
23. | Liaw, C.F.(2000)。A hybrid genetic algorithm for the open shop scheduling problem。European Journal of Operational Research,124,28-42。 |
24. | Liaw, C.F.、C.Y. Cheng、M. Chen(1251)。The total completion time open shop scheduling problem with a given sequence of jobs on one machine。Computers and Operations Research,29,1251-1266。 |
25. | Liu, C.、Chien, C.-F.、Ho, I.(1998)。An Object- Oriented Analysis and Design Method for Shop Floor Control Systems。International Journal of Computer Integrated Manufacturing,11(5),379-400。 |
26. | Marinagi, C.C.、C.D. Spyropoulosa、C. Papatheodorou、S. Kokkotos(2000)。Continual planning and scheduling for managing patient tests in hospital laboratories。Artificial Intelligence in Medicine,20,139-154。 |
27. | Ogulata, S.N.、M. Koyuncu、E. Karakas(2008)。Personnel and patient scheduling in the high demanded hospital services: A case study in the physiotherapy service。Journal of Medical Systems,32(3),221-228。 |
28. | Ramudhin, A.、P. Marier(1996)。The Generalized Shifting Bottleneck Procedure。European Journal of Operational Research,93,34-48。 |
29. | Rothlauf, F.、D.E. Goldberg(2003)。Redundant Representations in Evolutionary Computation。Evolutionary Computation,11(4),381-415。 |
30. | Shital, S.、A. Kusiak(2006)。Cancer gene search with data-mining and genetic algorithms。Computers in Biology and Medicine,37(2),251-261。 |
31. | Wang, Y.Z.(2003)。Using genetic algorithm methods to solve course scheduling problem。Expert systems with Application,25,39-50。 |
32. | Watanabe, M.、K. Ida、M. Gen(2005)。A genetic algorithm with modified crossover operator and search area adaptation for the job-shop scheduling problem。Computers and Industrial Engineering,48,743-752。 |
33. | Wu, J.-Z.(2011)。Inventory write-down prediction for semiconductor manufacturing considering inventory age, accounting principle, and product structure with real settings。Computers & Industrial Engineering。 |
34. | Wu, J.-Z.、X.-C. Hao、C.-F. Chien、M. Gen。A Novel Bi-Vector Encoding Genetic Algorithm for the Simultaneous Multiple Resources Scheduling Problem。Journal of Intelligent Manufacturing。 |
35. | Yu, H.、W. Liang(2001)。Neural network and genetic algorithm-based hybrid approach to expanded jobshop scheduling。Computers and Industrial Engineering,39,337-356。 |
36. | Zhou, H.、Feng, Y.、Han, L.(2001)。The Hybrid Heuristic Genetic Algorithm for Job Shop Scheduling。Computers and Industrial Engineering,40,191-200。 |
37. | Bard, J. F.、Purnomo, H. W.(2005)。Preference scheduling for nurses using column generation。European Journal of Operational Research,164(2),510-534。 |
38. | Mori, M.、Tseng, C. C.(1997)。A Genetic Algorithm for Multi-Mode Resource Constrained Project Scheduling Problem。European Journal of Operational Research,100(1),134-141。 |
39. | Cheng, R.、Gen, M.、Tsujimura, Y.(1999)。A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: Hybrid genetic search strategies。Computers & Industrial Engineering,36(2),343-364。 |
40. | Margarida, M.、V.P. Margarida(2007)。A genetic algorithm approach to a nurse rerostering problem。Computers & Operations Research,34(3),667-691。 |
41. | Wu, J.-Z.、Chien, C.-F.、Gen, M.(2012)。Coordinating strategic outsourcing decisions for semiconductor assembly using a bi-objective genetic algorithm。International Journal of Production Research,50(1),235-260。 |
42. | Spyropoulos, C. D.(2000)。AI planning and scheduling in the medical hospital environment。Artificial Intelligence in Medicine,20(2),101-111。 |
43. | Garey, M. R.、Johnson, D. S.、Sethi, R.(1976)。The complexity of flowshop and jobshop scheduling。Mathematics of Operations Research,1(2),117-129。 |
44. | Li, S.H.A.、Li, S.H.A.(2009)。A two-stage modeling with genetic algorithms for the nurse scheduling problem。Expert Systems with Applications,36(5),9506-9512。 |
45. | 吳吉政、許嘉裕(20090400)。Critical Success Factors for Improving Decision Quality on Collaborative Design in the IC Supply Chain。品質學報,16(2),95-108。 |
46. | Hartmann, S.(2002)。A Self-adapting Genetic Algorithm for Project Scheduling under Resource Constraints。Naval Research Logistics,49(5),433-448。 |
47. | Chien, C.-F.、Deng, J. F.(2004)。A Container Packing Support System for Determining and Visualizing Container Packing Patterns。Decision Support Systems,37(1),23-34。 |
48. | Aickelin, U.、Dowsland, K. A.(2004)。An indirect Genetic Algorithm for a nurse-scheduling problem。Computers & Operations Research,31,761-778。 |
49. | Park, B. J.、Choi, H. R.、Kim, H. S.(2003)。A hybrid genetic algorithm for the job shop scheduling problems。Computers & Industrial Engineering,45,597-613。 |