題名:Decision Criterion to Evaluate the Effect of Capacity Saving of a Single Machine with Uncertain Job Arrivals
書刊名:創新研發學刊
作者:Kao, Ching-kueiChuang, Pei-ying
出版日期:2014
卷期:10:1
頁次:頁41-50
主題關鍵詞:Setup timeCapacity savingFirst in first outFamily-based scheduling rule
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:9
A single finite-capacity machine that can process several product types requires a set-up that is capable of allowing adjustments in machine settings to complete a particular job. The family-based scheduling rule (FSR) can be used to improve performance by reducing the set-ups resulting from hard-pressed capacity. However, the waiting time of jobs on queue increases and fluctuates, so the mean and variance of the flow time of jobs also increase. In this study, a decision criterion to evaluate the effects of capacity saving is developed through a change in the considered dispatching rule from the first in first out (FIFO) rule to FSR. This decision criterion can be used to determine in which condition the set-up time can be significantly saved through a replacement of FIFO with FSR and thus help in making a choice between FIFO and FSR.
期刊論文
1.Chung, S. H.、Yang, M. H.、Kao, C. K.(2012)。Analyzing the effects of family-based scheduling rule on reducing capacity loss of single machine with uncertain job arrivals。Expert Systems with Applications,39(1),1231-1242。  new window
2.Kannan, V. R.、Lyman, S. B.(1994)。Impact of family-based scheduling on transfer batches in a job shop manufacturing cell。International Journal of Production Research,32,2777-2794。  new window
3.Trovinger, S. C.、Bohn, R. E.(2005)。Setup time reduction for electronics assembly: Combining simple (SMED) and IT-based methods。Production and Operations Management,14,205-217。  new window
4.Nomden, G.、Van Der Zee, D. J.、Slomp, J.(2008)。Family-based dispatching: anticipating fiiture jobs。International Journal of Production Research,46,73-97。  new window
5.Missbauer, H.(1997)。Order release and sequence-dependent setup times。International Journal of Production Economics,49,131-143。  new window
6.Liu, C. Y.、Chang, S. C.(2000)。Scheduling Flexible Flow Shops with Sequence-dependent Setup Effects。IEEE Transactions on Robotics and Automation,16,408-419。  new window
7.Jensen, J. B.、Malhotra, M. K.、Philipoom, P. R.(1998)。Family-based scheduling of shops with functional layouts。International Journal of Production Research,36(10),2687-2700。  new window
8.Chern, C. C.、Liu, Y. L.(2003)。Family-Based Scheduling Rules of a Sequence-Dependent Wafer Fabrication System。IEEE Transactions on Semiconductor Manufacturing,16(1),15-25。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top