公共工程於規劃、設計、招標、施工、驗收及保固期間皆會產生爭議,特以施工階段之履約爭議最為複雜且對工程成功影響最大。為完整了解台電之採購標案於履約期間所生爭議事件相關爭議問題及處理結果,乃將該等履約爭議事件中不同爭議原因或事由經歸納整理,同時擇取具代表性爭議事件作案例分析,彙整履約爭議事件處理結果與各類型代表案例爭點,最後再依據上述爭議事件處理結果與爭點,檢討機關契約文件並提出適切原則性研究建議。分析結果顯示:以在與台電公司的履約爭議案例當中,常涉及電力相關或者工程等專業知識,而且有時甚至會牽涉到核能、安全防護等其他領域,這部份的判斷就需要擁有專業知識、涉及相關領域,或者經驗豐富的法官、專家才能夠去釐清雙方的問題與責任。較特別的是,會有因為台電公司本身因該工程或契約遭到自身上級主管機關彈劾、要求改善等事項,進而要求廠商按照台電公司主管機關要求改善、彈劾的爭議點進行改善,甚至是拒絕付款,若是對簿公堂,對於廠商而言,延宕期間過長在訴訟期間即因財務問題而倒閉。
Public works in the planning, design, tendering, construction inspection and during the warranty are generated controversy, especially in the construction phase of the compliance dispute the most complex and the greatest impact on project success. For a complete understanding of the procurement tenders Taiwan power born controversial issues and events related to the dispute results in the compliance period, is the controversial events, such as the performance of different reasons or the subject of controversy after collate, and choose to take controversial event as a representative case studies , compile the results of the compliance dispute with the type of event handling cases on behalf of contention point, and finally the results based on the above controversy and contention point, review the agency contract documents and propose appropriate research proposals in principle. The results show: The Taiwan Power Company's compliance with the controversial case in which, often involving other power-related or engineering expertise, and sometimes even involve other areas of nuclear energy, security, etc. This part of the judgment on the need to have expertise judges involved in related fields, or experienced, expert to be able to clarify the issues and responsibilities of both parties. The more special is that there will be because Taipower company itself or contract for the project itself was impeached by higher authorities, require improvement and other matters, thus requiring manufacturers to request the competent authority in accordance with the Taiwan Power Company to improve the impeachment controversy points to improve, or even refuse payment, if court, for manufacturers, during the long delayed due to financial problems that have closed down during the proceedings.
研究報告
1.曾俊智(2010)。政府工程採購履約爭議之探討--兼論最高法院97年度台上字第1624號判決。  延伸查詢new window
學位論文
1.黃韋憲(2008)。政府採購之案例研究(碩士論文)。國立中央大學。  延伸查詢new window
2.李耀明(2002)。國軍軍事工程招標與履約爭議防制及處理之研究(碩士論文)。國防大學中正理工學院。  延伸查詢new window
3.江金璋(2006)。公共工程履約爭議事件爭點與契約管理之研究--以台灣地區西部走廊快速公路興建為例(碩士論文)。逢甲大學。  延伸查詢new window
4.楊英君(1999)。公共工程履約爭議處理制度之研究(碩士論文)。國立台灣科技大學。  延伸查詢new window
5.胡宗鳴(2003)。政府採購救濟機制之比較研究--以招標爭議之救濟機制為重心(碩士論文)。國立台北大學。  延伸查詢new window
6.彭麗春(1999)。政府採購法上申訴制度之研究(碩士論文)。輔仁大學。  延伸查詢new window
圖書
1.公共工程委員會(2008)。政府採購爭議處理事件案源及問題類型分析。行政院公共工程委員會。  延伸查詢new window
2.林鴻銘(2003)。政府採購法之實用權益。永然出版社。  延伸查詢new window
3.葉重新(2001)。教育研究法。台北:心理。  延伸查詢new window
 
 
 
 