期刊論文1. | Chien, C.-F.、Zheng, J.-N.(2012)。Mini-max regret strategy for robust capacity expansion decisions in semiconductor manufacturing。Journal of Intelligent Manufacturing,23(6),2151-2159。 |
2. | Chien, C.-F.、Wu, C.-H.、Chiang, Y.-H.(2012)。Coordinated capacity migration and expansion planning for semiconductor manufacturing under demand uncertainties。International Journal of Production Economics,135(2),860-869。 |
3. | Chien, C.-F.、Wang, H.-J.、Wang, M.(2007)。A UNISON Framework for Analyzing Alternative Strategies of IC Final Testing for Enhancing Overall Operational Effectiveness。International Journal of Production Economics,107(1),20-30。 |
4. | Chien, C.-F.、Kuo, R. T.(2013)。Beyond make-or-buy: cross-company short-term capacity backup in semiconductor industry ecosystem。Flexible Services and Manufacturing Journal,25(3),310-342。 |
5. | 簡禎富、游智閔、徐紹鐘(20090400)。紫式決策分析以建構半導體晶圓廠人力規劃決策模型。管理與系統,16(2),157-180。 延伸查詢 |
6. | Wu, S. D.、Erkoc, M.、Karabuk, S.(2005)。Managing capacity in the high-tech industry: a review of literature。The Engineering Economist,50,125-158。 |
7. | 簡禎富、陳勁甫、林國義(20130400)。在新竹科學工業園區及週邊規劃研究園區之研究。管理與系統,20(2),227-255。 延伸查詢 |
8. | Ahmed, S.、King, A. J.、Parija, G.(2003)。A multi-stage stochastic integer programming approach for capacity expansion under uncertainty。Journal of Global Optimization,26,3-24。 |
9. | Chen, W.-C.、Chien, C.-F.(2011)。Evaluating Capacity Pooling Strategy in Semiconductor Manufacturing: A Productivity Perspective Study。International Journal of Production Research,49(12),3635-3652。 |
10. | Chien, C.-F.、Wu, J.-Z.、Wu, C.-C.(2013)。A Two-Stage Stochastic Programming Approach for New Tape-Out Allocation Decisions for Demand Fulfillment Planning in Semiconductor Manufacturing。Flexible Services and Manufacturing Journal,25(3),286-309。 |
11. | Chou, C.、Chien, C.-F.、Gen, M.(2014)。A Multi-Objective Hybrid Genetic Algorithm for TFT-LCD Module Assembly Scheduling。IEEE Transactions on Automation Science and Engineering,11(3),692-705。 |
12. | Geng, N.、Jiang, Z.(2009)。A Review on Strategic Capacity Planning for the Semiconductor Manufacturing Industry。International Journal of Production Research,47(13),3639-3655。 |
13. | Geng, N.、Jiang, Z.、Chen, F.(2009)。Stochastic Programming Based Capacity Planning for Semiconductor Wafer Fab with Uncertain Demand and Capacity。European Journal of Operational Research,198,899-908。 |
14. | Hood, S. J.、Bermon, S.、Barahona, F.(2003)。Capacity Planning under Demand Uncertainty for Semiconductor Manufacturing。IEEE Transactions on Semiconductor Manufacturing,16(2),273-280。 |
15. | Lee, C.-Y.、Chen, C.-H.、Chien, C.-F.(2014)。A Simulation Analysis for Evaluating TFT-LCD Fab Capacity Expansion with a Distant Transportation Problem。International Journal of Production Research,52(6),1868-1885。 |
16. | Lin, J. T.、Wu, C. H.、Chen, T. L.、Shih, S. H.(2011)。A Stochastic Programming Model for Strategic Capacity Planning in Thin Film Transistor-liquid Crystal Display (TFT-LCD) Industry。Computer and Operation Research,38(7),992-1007。 |
17. | Van Mieghem, J. A.(2003)。Capacity Management, Investment, and Hedging: Review and Recent Developments。Manufacturing and Service Operations Management,5(4),269-302。 |
18. | Wang, K. J.、Wang, S. M.、Chen, J. C.(2008)。A Resource Portfolio Planning Model using Sampling-based Stochastic Programming and Genetic Algorithm。European Journal of Operational Research,184(1),327-340。 |
19. | Bermon, S.、Hood, S.(1999)。Capacity optimization planning system (CAPS)。Interfaces,29(5),31-50。 |
20. | Chien, C.-F.、Chen, Y.-J.、Peng, J.-T.(2010)。Manufacturing intelligence for semiconductor demand forecast based on technology diffusion and product life cycle。International Journal of Production Economics,128(2),496-509。 |
21. | Christie, Robert M. E.、Wu, S. David(2002)。Semiconductor capacity planning: Stochastic modeling and computational studies。IIE Transactions,34(2),131-143。 |
22. | Dantzig, George B.(1955)。Linear Programming under Uncertainty。Management Science,1,197-206。 |
23. | Hsu, C.-Y.、Chien, C.-F.、Lin, K.-Y.、Chien, C.-Y.(2010)。Data Mining for Yield Enhancement in TFT-LCD Manufacturing and an Empirical Study。Journal of the Chinese Institute of Industrial Engineers,27(2),140-156。 |
24. | Karabuk, S.、Wu, S. D.(2003)。Coordinating Strategic Capacity Planning in the Semiconductor Industry。Operations Research,51(6),839-849。 |
25. | Swaminathan, J. M.(2002)。Tool Procurement Planning for Wafer Fabrication Facilities: A Scenario-based Approach。HE Transactions,34(2),144-155。 |
26. | Wu, Jei-Zheng、Chien, Chen-Fu(2008)。Modeling Strategic Semiconductor Assembly Outsourcing Decisions Based on Empirical Settings。OR Spectrum,30(3),401-430。 |
27. | Wu, J.-Z.、Chien, C.-F.、Gen, M.(2012)。Coordinating strategic outsourcing decisions for semiconductor assembly using a bi-objective genetic algorithm。International Journal of Production Research,50(1),235-260。 |