:::

詳目顯示

回上一頁
題名:Optimization of Product Design Based on a Design-Function-Oriented Cost Model: A Strategic Non-Throw-Away Perspective
書刊名:工業工程學刊
作者:Shen, Chun-yingYu, Kun-tzu
出版日期:2013
卷期:30:2
頁次:頁94-104
主題關鍵詞:Throw-away cost modelDesign-function-oriented cost modelProcess capability indexPCISpecification tolerance variationRisk management
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:3
  • 點閱點閱:4
Most published studies adopt a throw-away cost model to solve minimum production cost problems, without considering subsequent risk-based contingent costs at the product design stage. The design-function-oriented cost model proposed in this study considers multi-characteristic quality specifications, product design functions, and subsequent risk-based contingent costs of a product for minimizing total costs during the initial product design stage. The optimization of in-house manufacturing process selection and quality assessment for outsourcing is associated with variation/cost functions. An adjustable managerial contingent cost coefficient was used to enable design teams to make appropriate trade-offs at various stages of the life cycle of product marketing based on the product’s intended strategic market position. An empirical case study demonstrated the efficacy of the proposed model as one that can be easily understood and applied by any organization. The results and processes of the case study also provide useful managerial implications.
期刊論文
1.Wu, C.-W.、Pearn, W. L.、Kotz, S.(2009)。An overview of theory and practice on process capability indices for quality assurance。International Journal of Production Economics,117(2),338-359。  new window
2.Handfield, Robert B.、Ragatz, Gary L.、Petersen, Kenneth J.、Monczka, Robert M.(1999)。Involving Suppliers in New Product Development。California Management Review,42(1),59-82。  new window
3.Branca, A. S.、Catalao-Lopes, M.(2011)。Strategic interaction and quality choice。Total Quality Management and Business Excellence,22,265-273。  new window
4.Hsieh, C. C.、Wu, C. H.、Huang, Y. J.(2008)。Ordering and pricing decision in a two-echelon supply chain asymmetric demand information。European Journal of Operational Research,190,509-525。  new window
5.Cakravastia, A.、Takahashi, K.(2004)。Integrated model for supplier selection and negotiation in a make-to-order environment。International Journal of Production Research,42(21),4457-4474。  new window
6.Shen, C. Y.、Yu, K. T.(2009)。Enhancing the Efficacy of Supplier Selection Decision-Making on the Initial Stage of New Product Development: A Hybrid Fuzzy Approach Considering the Strategic and Operational Factors Simultaneously。Expert Systems with Applications,36(8),11271-11281。  new window
7.Chen, K. S.、Huang, M. L.(2007)。Process capability evaluation for the process of product families。Quality & Quantity,41(1),151-162。  new window
8.池文海、傅家啟、王孔政(20070900)。A Neural Network Based Approach for Tolerance Analysis。工業工程學刊,24(5),366-377。new window  延伸查詢new window
9.Fathi, Y.(1990)。Producer-consumer tolerances。Journal of Quality Technology,22,138-145。  new window
10.Lee, W. J.、Woo, T. C.、Chou, S. Y.(1993)。Tolerance synthesis for nonlinear systems based on nonlinear programming。IIE Transactions,25,51-61。  new window
11.Lin, J.、Qian, Y. J.、Cui, W.、Miao, Z.(2010)。Overlapping and communication policies in product development。European Journal of Operational Research,201(3),737-750。  new window
12.駱景堯、余豐榮、蔡建華(20020300)。Bootstrap於非對稱性公差之製程能力指標信賴區間估計研究。工業工程學刊,19(2),107-117。new window  延伸查詢new window
13.Östlin, J.、Sundin, E.、Bjőrkman, M.(2008)。Importance of closed-loop supply chain relationships for product remanufacturing。International Journal of Production Economics,115(2),336-348。  new window
14.彭文理、吳建瑋(20050300)。An Effective Modern Approach for Measuring High-Tech Product Manufacturing Process Quality。工業工程學刊,22(2),119-133。new window  new window
15.Rachaniotis, N. P.、Pappis, C. P.(2008)。Preventive maintenance and upgrade system: Optimizing the whole performance system by components' replacement or rearrangement。International Journal of Production Economics,112,236-244。  new window
16.Sun, H.、Zhao, Y.(2010)。The empirical relationship between quality management and the speed of a product development。Total Quality Management with Business Excellence,21,351-361。  new window
17.Sutherland, G. H.、Roth, B.(1975)。Mechanism design: accounting for manufacturing tolerances and costs in function generating problems. Transaction of ASME。Journal of Engineering for Industry,97,283-286。  new window
18.Verschuren, P.、Hartog, R.(2005)。Evaluation in Design-Oriented Research。Quality & Quantity,39,733-762。  new window
19.Wang, P.、Liang, M.(2005)。An integrated approach to tolerance synthesis, process selection and machining parameter optimization problems。International Journal of Production Research,43,2237-2262。  new window
20.Wu, Z.、Elmaraghy, W. H.、Elmaraghy, H. A.(1988)。Evaluation of cost-tolerance algorithm for design tolerance analysis and synthesis。Manufacturing Review,1,68-179。  new window
21.Zhang, H. C.、Hug, H. E.(1992)。Tolerance techniques: The state-of-art。International Journal of Production Research,30,2111-2135。  new window
22.Lin, C. W.、Chen, H. Y.(2004)。A fuzzy strategic alliance selection framework for supply chain partnering under limited evaluation resources。Computers in Industry,55(2),159-179。  new window
23.林添佑、于鴻福(20090100)。An Optimal Policy for CSP-1 with Inspection Errors and Return Cost。工業工程學刊,26(1),70-76。new window  new window
24.Pearn, W. L.、Chen, K. S.(2002)。One-Sided Capability Indices Cpu and Cpl: Decision Making with Sample Information。International Journal of Quality & Reliability Management,19(3),221-245。  new window
25.Pearn, W. L.、Kotz, S.、Johnson, N. L.(1992)。Distributional and inferential properties of the process accuracy and process precision indices。Journal of Quality Technology,24(4),216-231。  new window
26.Sarkis, J.、Talluri, S.(2002)。A Model for Strategic Supplier Selection。Journal of Supply Chain Management,38(1),18-28。  new window
27.Weber, Charles A.、Current, John R.、Benton, W. C.(1991)。Vendor selection criteria and methods。European Journal of Operational Research,50(1),2-18。  new window
28.Kane, Victor E.(1986)。Process capability indices。Journal of Quality Technology,18(1),41-52。  new window
29.Govindarajan, V.、Shank, J. K.(1992)。Strategic cost management and the value chain。Journal of Cost Management,1992(Winter),5-21。  new window
會議論文
1.Ghobadian, A.、Stainer, A.、Kiss, T.(199307)。A Computerized Vendor Rating System。the 1st International Symposium on Logistics。Nottingham, UK:The University of Nottingham。321-328。  new window
圖書
1.Hill, T.(2000)。Manufacturing Strategy: Texts and Cases。Basingstoke:Palgrave Macmillan。  new window
2.Taguchi, G.、Elsayed, E. A.、Hsiang, T. C.(1989)。Quality Engineering in Production Systems。New York, NY:McGraw Hill Publishing Company。  new window
3.Ulrich, Karl T.、Eppinger, Steven D.(2003)。Product Design and Development。McGraw-Hill/Irwin。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top