:::

詳目顯示

回上一頁
題名:The Integrated Policy with Immediate Return for Defective Items
書刊名:工業工程學刊
作者:Yu, Hong-fwuhsu, wen-kai 引用關係Huang, Yu-xiu
出版日期:2013
卷期:30:4
頁次:頁230-237
主題關鍵詞:EOQEPQImperfect qualityImmediate returnIntegrated production-inventory model
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(3) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:2
  • 共同引用共同引用:0
  • 點閱點閱:3
The economic production quantity (EPQ) and the economic order quantity (EOQ) models have been widely used in inventory management for vendors and retailers, respectively. However, an optimal solution for the EPQ or the EOQ model is only based on either vendors’ or buyers’ viewpoint. That is, such an optimal solution is usually beneficial to one of the vendors and buyers, but detrimental to the others. Hence, to establish a long-term cooperative relationship between the vendor and buyer, an integrated inventory model is needed. The purpose of this paper is to investigate a single- vendor single-retailer production-inventory model for products with imperfect quality. It is assumed that a 100% inspection process is conducted to screen out the defectives contained in the received lot and the defectives screened out during the 100% inspection process will be returned to the vendor immediately. By maximizing the expected annual integrated total profit, the optimal number of shipments in a cycle and the optimal size of each shipment are determined. A numerical example is provided to illustrate the proposed model and demonstrate the superiority of the proposed model to a general single supplier-single buyer system not considering lot-splitting shipments.
期刊論文
1.Hsu, W. K.、Yu, H. F.(2011)。Economic order quality model with immediate return for defective items。ICIC Express Letters,5(7),2215-2220。  new window
2.Jagieta, L.、Michenzi, A. R.(1982)。Inflation's impact on the economic lot quantity (EOQ) formula。Omega,10,698-699。  new window
3.Konstantaras, I.、Goyal, S. K.、Papachristos, S. E.(2007)。Economic ordering policy for an item with imperfect quality subject to the in-house inspection。International Journal of Systems Science,38(6),473-482。  new window
4.Chung, K. J.、Her, C. C.、Lin, S. D.(2009)。A two-warehouse inventory model with imperfect quality production processes。Computers and Industrial Engineering,56,193-197。  new window
5.Eroglu, A.、Ozdemir, A.(2007)。An economic order quantity model with defective items and shortages。International Journal of Production Economics,106,544-549。  new window
6.Ben-Daya, M.(2002)。The economic production lot-sizing problem with imperfect production processes and imperfect maintenance。International Journal of Production Economics,76(3),257-264。  new window
7.Khan, M.、Jaber, M. Y.、Wahab, M. I. M.(2010)。Economic order quantity model for items with imperfect quality with learning in inspection。International Journal of Production Economics,124(1),87-96。  new window
8.Pentico, David W.、Drake, Matthew J.(2009)。The deterministic EOQ with partial backordering: a new approach。European Journal of Operational Research,194(1),102-113。  new window
9.Bose, S.、Goswami, A.、Chaudhuri, K. S.(1995)。An EOQ model for deteriorating items with linear time-dependent demand rate and shortages under inflation and time discounting。Journal of the Operational Research Society,46,771-782。  new window
10.Aderohunmu, R.、Mobolurin, A.、Bryson, N.(1995)。Joint vendor-buyer policy in JIT manufacturing。Journal of Operational Research Society,46,375-385。  new window
11.Ben-Daya, M.、Darwish, M.、Ertogral, K.(2008)。The joint economic lot sizing problem: Review and extensions。European Journal of Operational Research,185,726-742。  new window
12.Chan, W. M.、Ibrahim, R. N.、Lochert, P. B.(2003)。A new EPQ model: Integrating lower pricing rework and reject situations。Production Planning and Control,14,588-595。  new window
13.Chung, K. J.、Hou, K. L.(2003)。An optimal production run time with imperfect production processes and allowable shortages。Computers & Operations Research,30,483-490。  new window
14.Goyal, S. K.、Gupta, Y. P.(1989)。Integrated inventory models: The buyer-vendor coordination。European Journal of Operational Research,41,261-269。  new window
15.Goyal, S. K.、Nebebe, F.(2000)。Determination of economic production-shipment policy for a single-vendor singlebuyer integrated production-inventory system。European Journal of Operational Research,121,175-178。  new window
16.Goyal, S. K.、Srinivasan, G.、Arcelus, F. J.(1991)。One time only incentives and inventory policies。European Journal of Operational Research,54,1-6。  new window
17.Goyal, S. K.、Szendrovits, A. Z.(1986)。A constant lot size model with equal and unequal size batch shipments between production stages。Engineering Costs and Production Economics,10,203-210。  new window
18.Hill, R. M.(1997)。The single-vendor single-buyer integrated production-inventory model with a generalized policy。European Journal of Operational Research,97,493-499。  new window
19.Hoque, M. A.、Goyal, S. K.(2000)。An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment。International Journal of Production Economics,65,305-315。  new window
20.Hsu, W. K.、Yu, H. F.(2009)。EOQ model for imperfective items under a one-time-only discount。Omega,37,1018-1026。  new window
21.Huang, C. K.(2004)。An optimal policy for single-vendor single-buyer integrated production-inventory problem with process unreliability consideration。International Journal of Production Economics,91,91-98。  new window
22.Khouja, M.、Mehrez, A.(1994)。An economic production lot size model with imperfect quality and variable production rate。Journal of Operational Research Society,45(12),1405-1417。  new window
23.Khouja, M.、Park, S.(2003)。Optimal lot sizing under continuous price decrease。Omega,31,539-545。  new window
24.Kim, S. L.、Ha, D.(2003)。A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage。International Journal of Production Economics,86,1-10。  new window
25.Lu, L.(1995)。A one-vendor multi-buyer integrated inventory model。European Journal of Operational Research,81,312-323。  new window
26.Maddah, B.、Jaber, M. Y.(2008)。Economic order quantity model for items with imperfect quality: Revisited。International Journal of Production Economics,112,808-815。  new window
27.Papachristos, S.、Konstantaras, I.(2006)。Economic ordering quantity models for items with imperfect quality。International Journal of Production Economics,100,148-154。  new window
28.Pentico, D. W.、Drake, M. J.、Toews, C.(2009)。The deterministic EPQ with partial backordering: A new approach。Omega,37,624-636。  new window
29.Rosenbalatt, M. J.、Lee, H. L.(1986)。Economic production cycles with imperfect production process。IIE Transactions,18,48-55。  new window
30.Salameh, M. K.、Jaber, M. Y.(2000)。Economic order quantity model for items with imperfect quality。International Journal of Production Economics,64,59-64。  new window
31.Silver, E. A.(1976)。Establishing the order quantity when the amount received is uncertain。INFOR,14(1),32-39。  new window
32.Wang, S.、Sarker, B. R.(2006)。Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy。European Journal of Operational Research,172,179-200。  new window
33.Yang, P. C.、Wee, H. M.(2000)。Economic ordering policy of deteriorated item for vendor and buyer: An integrated approach。Production Planning and Control,11,41-47。  new window
34.Yao, M. J.、Hsu, T. C.(2009)。An efficient search algorithm for obtaining the optimal replenishment strategies in multistage just-in-time supply chain systems。Journal of Industrial and Management Optimization,5,11-32。  new window
35.于鴻福、許文楷(2120100)。An EOQ Model with Immediate Return for Imperfect Items Under an Announced Price Increase。工業工程學刊,29(1),30-42。new window  new window
36.Banerjee, A.、Burton, S.(1994)。Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers。International Journal of Production Economics,35,215-222。  new window
37.Banerjee, A.、Kim, S. L.(1995)。An integrated JIT inventory model。International Journal of Operations and Production Management,15,237-244。  new window
38.Bogaschewsky, R. W.、Buscher, U. D.、Lindner, G.(2001)。Optimizing multi-stage production with constant lot size and varying number of unequal sized batches。Omega,29,183-191。  new window
39.Goyal, S. K.、Huang, C. K.、Chen, K. C.(2003)。A simple integrated production policy of an imperfect item for vendor and buyer。Production Planning and Control,14(7),596-602。  new window
40.Huang, C. K.(2002)。An integrated vendor-buyer cooperative inventory model for items with imperfect quality。Production Planning and Control,13(4),355-361。  new window
41.Goyal, S. K.(1995)。A one-vendor multi-buyer integrated inventory model: A common。European Journal of Operational Research,82,209-210。  new window
42.Shih, W.(1980)。Optimal inventory policies when stockouts result from defective products。International Journal of Production Research,18,677-686。  new window
43.Yao, M. J.、Chiou, C. C.(2004)。On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers。European Journal of Operational Research,159,406-419。  new window
44.Goyal, S. K.(1988)。A join t economic-lot-size model for purchaser and vendor: A comment。Decision Sciences,19,236-241。  new window
45.Banerjee, Avijit(1986)。A joint economic-lot-size model for purchaser and vendor。Decision Sciences,17(3),292-311。  new window
46.Goyal, S. K.(1977)。An Integrated Inventory Model for a Single Supplier-Single Customer Problem。International Journal of Production Research,15(1),107-111。  new window
47.Ha, D.、Kim, S. L.(1997)。Implementation of JIT Purchasing: An Integrated Approach。Production Planning and Control,8(2),152-157。  new window
圖書
1.Zipkin, P. H.(2000)。Foundations of Inventory Management。New York:McGraw Hill。  new window
2.Silver, E. A.、Pyke, D. F.、Peterson, R. P.(1998)。Inventory Management and Production Planning and Scheduling。John Wiley & Sons。  new window
圖書論文
1.Harris, F. W.(1915)。What quantity to make at once。Operations and Cost。Chicago:A. W. Shaw。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE