:::

詳目顯示

回上一頁
題名:Scheduling Deteriorating Jobs with Chain Constraints and a Power Function of Job Completion Times
書刊名:工業工程學刊
作者:Duan, Hong-lingWang, WeiWu, Yu-bin
出版日期:2014
卷期:31:3
頁次:頁128-133
主題關鍵詞:SchedulingDeteriorating jobsSingle machineWeighted sum of the θth power of job completion timesParallel chains
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:4
  • 點閱點閱:4
期刊論文
1.Cheng, T. C. E.、Wu, C. C.、Lee, W. C.(2008)。Some scheduling problems with deteriorating jobs and learning effects。Computers & Industrial Engineering,54,972-982。  new window
2.Wang, J.-B.、Wang, J.-J.、Ji, P.(2011)。Scheduling jobs with chain precedence constraints and deteriorating jobs。Journal of the Operational Research Society,62,1765-1770。  new window
3.Yang, S. J.、Yang, D. L.(2010)。Minimizing the total completion time in single-machine scheduling with aging/deteriorating effects and deteriorating maintenance activities。Computers Sz Mathematics with Applications,60,2161-2169。  new window
4.陳威仰、沈國基(20110700)。A Pareto-Optimal Solution Procedure for the Single-Machine Scheduling Problem with Release Time and Multiple Performance Measures。工業工程學刊,28(5),346-359。new window  new window
5.Cheng, M.、Tadikamalla, P. R.、Shang, J.、Zhang, S.(2014)。Bicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobs。European Journal of Operational Research,234,650-657。  new window
6.Cossari, Anthony、Ho, Johnny C.、Paletta, Giuseppe、Ruiz-Torres, Alex J.(20130400)。Minimizing Workload Balancing Criteria on Identical Parallel Machines。工業工程學刊,30(3),160-172。new window  new window
7.Dolgui, A.、Gordon, V.、Strusevich, V.(2012)。Single machine scheduling with precedence constraints and positionally dependent processing times。Computers & Operations Research,39,1218-1224。  new window
8.Gao, W.-J.、Huang, X.、Wang, J.-B.(2010)。Single-machine scheduling with precedence constraints and decreasing start-time dependent processing times。The International Journal of Advanced Manufacturing Technology,46,291-299。  new window
9.Janiak, A.、Krysiak, T.、Pappis, C. P.、Voutsinas, T. G.(2009)。A scheduling problem with job values given as a power function of their completion times。European Journal of Operational Research,193,836-848。  new window
10.李新濤、楊肅正(20121200)。Parallel Machines Scheduling with Deterioration Effects and Resource Allocations。工業工程學刊,29(8),534-543。new window  延伸查詢new window
11.Lee, W.-C.、Wu, C.-C.、Chung, Y.-H.(2008)。Scheduling deteriorating jobs on a single machine with release times。Computers & Industrial Engineering,54,441-452。  new window
12.Lee, W.-C.、Wu, C.-C.、Liu, H.-C.(2009)。A note on singlemachine makespan problem with general deteriorating function。The International Journal of Advanced Manufacturing Technology,40,1053-1056。  new window
13.Lee, W.-C.、Wang, W.-J.、Shiau, Y.-R.、Wu, C.-C.(2010)。A single-machine scheduling problem with two-agent and deteriorating jobs。Applied Mathematical Modeling,34,3098-3107。  new window
14.Low, C.、Lin, W.-Y.(2013)。Some scheduling problems with time-dependent learning effect and deteriorating jobs。Applied Mathematical Modeling,37,8865-8875。  new window
15.Mehravaran, Yasaman、Logendran, Rasaratnam(20110300)。Bicriteria Supply Chain Scheduling on Unrelated-Parallel Machines。工業工程學刊,28(2),91-101。new window  new window
16.Miao, C.、Xia, Y.、Zhang, Y.、Zou, J.(2013)。Batch scheduling with deteriorating jobs to minimize the total completion time。Journal of the Operations Research Society of China,1,377-383。  new window
17.Mondal, S. A.、Sen, A. K.(2000)。An improved precedence rule for single machine sequencing problems with quadratic penalty。European Journal of Operational Research,125,425-428。  new window
18.Mosheiov, G.(1994)。Scheduling jobs under simple linear deterioration。Computers & Operations Research,21,653-659。  new window
19.Ng, C. T.、Wang, J.-B.、Cheng, T. C. E.、Lam, S. S.(2011)。Flowshop scheduling of deteriorating jobs on dominating machines。Computers & Industrial Engineering,61,647-654。  new window
20.蘇玲慧、陳建良(20110100)。Two- and Three-Machine Flowshop Scheduling Problems with Optional Final Operation。工業工程學刊,28(1),55-71。new window  new window
21.Sun, L.-H.、Sun, L.-Y.、Wang, J.-B.(2011)。Single-machine scheduling to minimize total absolute differences in waiting times with deteriorating jobs。Journal of the Operational Research Society,62,768-775。  new window
22.Sun, L.-H.、Sun, L.-Y.、Wang, M.-Z.、Wang, J.-B.(2012)。Flow shop makespan minimization scheduling with deteriorating jobs under dominating machines。International Journal of Production Economics,138,195-200。  new window
23.Szwarc, W.、Posner, M. E.、Liu, J. J.(1988)。The single machine problem with a quadratic cost function of completion times。Management Science,34,1480-1488。  new window
24.Townsend, W.(1978)。The single machine problem with quadratic penalty function of completion times: A branchand-bound solution。Management Science,24,530-534。  new window
25.Wang, J.-B.、Wang, M.-Z.(2013)。Minimizing makespan in three-machine flow shops with deteriorating jobs。Computers & Operations Research,40,547-557。  new window
26.Wang, X.-R.、Wang, J.-J.(2013)。Single-machine scheduling with convex resource dependent processing times and deteriorating jobs。Applied Mathematical Modeling,37,2388-2393。  new window
27.Wang, X.-Y.、Wang, J.-J.(2013)。Single-machine due date assignment problem with deteriorating jobs and resourcedependent processing times。The International Journal of Advanced Manufacturing Technology,67,255-260。  new window
28.Wang, D.、Wu, Y.-B.、Wang, J.-B.、Ji, P.(2012)。Singlemachine scheduling with decreasing time-dependent processing times to minimize total absolute differences in waiting times。Journal of the Chinese Institute of Industrial Engineers,29,444-453。  new window
29.Wei, C.-M.、Wang, J.-B.(2010)。Single machine quadratic penalty function scheduling with deteriorating jobs and group technology。Applied Mathematical Modeling,34,3642-3647。  new window
30.Xu, Y.-T.、Zhang, Y.、Huang, X.(2014)。Single-machine ready times scheduling with group technology and proportional linear deterioration。Applied Mathematical Modeling,38,384-391。  new window
31.Yang, S.-J.(2013)。Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time。Applied Mathematical Modeling,37,2995-3005。  new window
32.楊肅正、許洲榮、張庭瑞、楊達立(20110600)。Single-Machine Scheduling with Past-Sequence-Dependent Delivery Times and Learning Effect。工業工程學刊,28(4),247-255。new window  延伸查詢new window
33.楊肅正、楊達立、張庭瑞(20111200)。Single-Machine Scheduling with Joint Deterioration and Learning Effects Under Group Technology and Group Availability Assumptions。工業工程學刊,28(8),597-605。new window  new window
34.楊達立、李新濤、楊肅正(20120600)。Unrelated Parallel-Machine Scheduling Simultaneously with Rate-Modifying Activities and Earliness and Tardiness Penalties。工業工程學刊,29(4),282-289。new window  延伸查詢new window
35.Ying, Kuo-ching、Lin, Shih-wei(20130900)。A High-Performing Constructive Heuristic for Minimizing Makespan in Permutation Flowshops。工業工程學刊,30(6),355-362。new window  new window
36.Zhao, C.-L.、Tang, H.(2012)。Two-machine flow shop scheduling with deteriorating jobs and chain precedence constraints。International Journal of Production Economics,136,131-136。  new window
37.趙傳立、郭家源、許洲榮(20110900)。Parallel-Machine Scheduling with Deteriorating Jobs and Rate-Modifying Activities to Minimize Total Completion Time。工業工程學刊,28(6),485-491。new window  new window
38.Gawiejnowicz, S.、Kurc, W.、Pankowska, L.(2009)。Equivalent time-dependent scheduling problems。European Journal of Operational Research,196,919-929。  new window
39.Huang, X.、Wang, M.-Z.(2001)。Parallel identical machines scheduling with deteriorating jobs and total absolute differences penalties。Applied Mathematical Modeling,35,1349-1353。  new window
40.Lai, P. J.、Lee, W. C.(20100516)。Single-machine scheduling with a nonlinear deterioration function。Information Processing Letters,110(11),455-459。  new window
41.Wang, J.-B.、Wang, M.-Z.(201201)。Single-machine scheduling with nonlinear deterioration。Optimization Letters,6(1),87-98。  new window
42.Wang, J.-B.、Huang, X.、Wu, Y.-B.、Ji, P.(201205)。Group scheduling with independent setup times, ready times, and deteriorating job-processing times。The International Journal of Advanced Manufacturing Technology,60(5/8),643-649。  new window
43.Wang, J. B.、Wang, M. Z.、Ji, P.(2012)。Single Machine Total Completion Time Minimization Scheduling with a Time-Dependent Learning Effect and Deteriorating Jobs。International Journal of Systems Science,43(5),861-868。  new window
44.Wu, C.-C.、Lee, W.-C.(2008)。Single-machine group scheduling problems with deteriorating setup times and job-processing times。International Journal of Production Economics,115,128-133。  new window
45.Wu, C.-C.、Shiau, Y.-R.、Lee, W.-C.(2008)。Single-machine group scheduling problems with deterioration consideration。Computers & Operations Research,35,1652-1659。  new window
46.楊肅正(20110600)。Parallel Machines Scheduling with Simultaneous Considerations of Position-Dependent Deterioration Effects and Maintenance Activities。工業工程學刊,28(4),270-280。new window  new window
47.Gawiejnowicz, Stanislaw、Kononov, Alexander(20100100)。Complexity and approximability of scheduling resumable proportionally deteriorating jobs。European Journal of Operational Research,200(1),305-308。  new window
48.Wang, J.-B.、Ng, C. T.、Cheng, T. C. E.(2008)。Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint。Computers and Operations Research,35,2684-2693。  new window
49.Zhu, V. C. Y.、Sun, L.、Sun, L.、Li, X.(2010)。Single machine scheduling time-dependent jobs with resource-dependent ready times。Computers & Industrial Engineering,58,84-87。  new window
圖書
1.Pinedo, M.(2012)。Scheduling Theory, Algorithms, and Systems。New Jersey:Prentice Hall。  new window
2.Gawiejnowicz, S.(2008)。Time-dependent Scheduling。Berlin:Springer-Verlag。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
1. A Modified Immunoglobulin-Based Artificial Immune System Algorithm for Solving the Permutation Flow Shop Scheduling Problem
2. Properties of Two-Machine No-Wait Flow-Shop Scheduling with a Non-Resumable Unavailable Interval
3. Total Tardiness Minimization in a Parallel Machine System with Flexible Periodic Maintenance
4. A High-Performing Constructive Heuristic for Minimizing Makespan in Permutation Flowshops
5. Minimizing Workload Balancing Criteria on Identical Parallel Machines
6. Parallel Machines Scheduling with Deterioration Effects and Resource Allocations
7. Unrelated Parallel-Machine Scheduling Simultaneously with Rate-Modifying Activities and Earliness and Tardiness Penalties
8. A Genetic Optimization Algorithm and Perceptron Learning Rules for a Bi-Criteria Parallel Machine Scheduling
9. Single-Machine Scheduling with Joint Deterioration and Learning Effects Under Group Technology and Group Availability Assumptions
10. Parallel-Machine Scheduling with Deteriorating Jobs and Rate-Modifying Activities to Minimize Total Completion Time
11. A Pareto-Optimal Solution Procedure for the Single-Machine Scheduling Problem with Release Time and Multiple Performance Measures
12. Parallel Machines Scheduling with Simultaneous Considerations of Position-Dependent Deterioration Effects and Maintenance Activities
13. Single-Machine Scheduling with Past-Sequence-Dependent Delivery Times and Learning Effect
14. Bicriteria Supply Chain Scheduling on Unrelated-Parallel Machines
15. Two- and Three-Machine Flowshop Scheduling Problems with Optional Final Operation
 
無相關博士論文
 
無相關書籍
 
無相關著作
 
無相關點閱
 
QR Code
QRCODE