| 期刊論文1. | 顏上堯、陳玉菁(20021200)。純檢修資格航機修護人力供給模式之建立。運輸計劃,31(4),817-829。 延伸查詢 | 2. | Yan, S.、Tang, C. H.、Fu, T. C.(2008)。An Airline Scheduling Model and Solution Algorithms under Stochastic Demands。European Journal of Operational Research,190(1),22-39。 | 3. | Yan, S.、Chi, C. J.、Tang, C. H.(2006)。Inter-city Bus Routing and Timetable Setting under Stochastic Demands。Transportation Research Part A: Policy and Practice,40(7),572-586。 | 4. | Garrido, R. A.、Lamas, P.、Pino, F. J.(2015)。A stochastic programming approach for floods emergency logistics。Transportation research part E: logistics and transportation review,75,18-31。 | 5. | Yan, S.、Lin, C. K.、Chen, S. Y.(2014)。Logistical support scheduling under stochastic travel times given an emergency repair work schedule。Computers & Industrial Engineering,67,20-35。 | 6. | 楊大輝、賴奕維(20051200)。航空公司短期維修計畫之人員勤務指派。運輸計劃,34(4),525-548。 延伸查詢 | 7. | Agra, A.、Christiansen, M.、Delgado, A.、Hvattum, L. M.(2015)。A Maritime Inventory Routing Problem with Stochastic Sailing and Port Times。Computers and Operations Research,61,18-30。 | 8. | Beliën, J.、Demeulemeester, E.、De Bruecker, P.、Van den Bergh, J.、Cardoen, B.(2013)。Integrated Staffing and Scheduling for an Aircraft Line Maintenance Problem。Computers and Operations Research,40(4),1023-1033。 | 9. | Belsnes, M. M.、Wolfgang, O.、Follestad, T.、Aasgård, E. K.(2016)。Applying Successive Linear Programming for Stochastic Short-term Hydropower Optimization。Electric Power Systems Research,130,167-180。 | 10. | Bergh, J. V. D.、Bruecker, P. D.、Beliën, J.、Boeck, L. D.、Demeulemeester, E.(2013)。A Three-Stage Approach for Aircraft Line Maintenance Personnel Rostering using MIP, Discrete Event Simulation and DEA。Expert Systems with Applications,40(7),2659-2668。 | 11. | Errico, F.、Desaulniers, G.、Gendreau, M.、Rei, W.、Rousseau, L. M.(2016)。A Priori Optimization with Recourse for the Vehicle Routing Problem with Hard Time Windows and Stochastic Service Times。European Journal of Operational Research,249(1),55-66。 | 12. | Gundegjerde, C.、Halvorsen, I. B.、Halvorsen-Weare, E. E.、Hvattum, L. M.、Nonas, L. M.(2015)。A Stochastic Fleet Size and Mix Model for Maintenance Operations at Offshore Wind Farms。Transportation Research Part C: Emerging Technologies,52,74-92。 | 13. | Hosseini, M.、MirHassani, S. A.(2015)。Refiieling-station Location Problem under Uncertainty。Transportation Research Part E: Logistics and Transportation Review,84,101-116。 | 14. | Song, D. P.、Li, D.、Drake, P.(2015)。Multi-objective Optimization for Planning Liner Shipping Service with Uncertain Port Times。Transportation Research Part E: Logistics and Transportation Review,84,1-22。 | 15. | Tang, C. H.、Yan, S.、Chang, C. W.(2009)。Short-term Work Team Scheduling Models for Effective Road Repair and Management。Transportation Planning and Technology,32(3),289-311。 | 16. | Tang, C. H.(2011)。A Gate Reassignment Model for the Taiwan Taoyuan Airport under Temporary Gate Shortages and Stochastic Flight Delays。IEEE Transactions on Systems, Man, and Cybernetics--Part A: Systems and Humans,41(4),637-650。 | 17. | Tang, C. H.(2011)。A Scenario Decomposition-genetic Algorithm Method for Solving Stochastic Air Cargo Container Loading Problems。Transportation Research Part E: Logistics and Transportation Review,47(4),520-531。 | 18. | Yan, S.、Yang, T. H.、Chen, H. H.(2004)。Airline Short-term Maintenance Manpower Supply Planning。Transportation Research Part A: Policy and Practice,38(9/10),615-642。 | 19. | Yan, S.、Tang, C. H.(2008)。An Integrated Framework for Inter-city Bus Scheduling under Stochastic Bus Travel Times。Transportation Science,42(3),318-335。 | 20. | List, George F.、Wood, Bryan、Nozick, Linda K.、Turnquist, Mark A.、Jones, Dean A.、Kjeldgaard, Edwin A.、Lawton, Craig R.(2003)。Robust Optimization for Fleet Planning under Uncertainty。Transportation Research Part E: Logistics and Transportation Review,39(3),209-227。 | 21. | Yan, S.、Chen, H. H.、Yang, T. H.(2003)。An Airline Maintenance Manpower Planning Model with Flexible Strategies。Journal of Air Transport Management,9(4),233-239。 | 22. | Alfares, H. K.(1999)。Aircraft Maintenance Workforce Scheduling: A Case Study。Journal of Quality in Maintenance Engineering,5(2),78-89。 | 會議論文1. | Gupta, P.、Bazargan, M.、McGrath, R.(2003)。Simulation Model for Aircraft Line Maintenance Planning。The 2003 Annual Reliability and Maintainability Symposium,387-391。 | 學位論文1. | 王偉楓(2010)。智慧型飛機維修人員排班決策輔助系統(碩士論文)。元智大學。 延伸查詢 | 2. | 趙仲威(2013)。航空公司停機線維修人員指派之研究-以高雄國際機場為例(碩士論文)。長榮大學。 延伸查詢 | 3. | 劉承哲(2013)。利用整數規劃求解排班最佳化及疲勞最小化(碩士論文)。國立成功大學。 延伸查詢 | 圖書1. | Birge, J. R.、Louveaux, F. V.(1997)。Introduction to Stochastic Programming。Springer-Verlag。 | |