期刊論文1. | Yeh, R. H.、Lo, H. C.(1998)。Quality Control Products Under Free-Repair Warranty。International Journal of Operations and Quantitative Management,4,265-275。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
2. | Yeh, R. H.、Ho, W. T.、Tseng, S. T.(2000)。Optimal Production Length for Products Sold with Warranty。European Journal of Operational Research,120,575-582。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
3. | Chen, C. H.、Khoo, M. B. C.(2009)。Optimum Process Mean and Manufacturing Quantity Settings for Serial Production System Under the Quality Loss and Rectifying Inspection Plan。Computers & Industrial Engineering,57,1080-1088。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
4. | Chen, C. H.、Lai, M. T.(2007)。Economic Manufacturing Quantity, Optimum Process Mean, and Economic Specification Limits Setting Under the Rectifying Inspection Plan。European Journal of Operational Research,183,336-344。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
5. | Chen, C. H.、Lai, M. T.(2007)。Determining the Optimum Process Mean Based on Quadratic Quality Loss Function and Rectifying Inspection Plan。European Journal of Operational Research,182,755-763。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
6. | Chen, C. L.、Liu, C. L.(2007)。Procurement Strategies in the Presence of the Spot Market--an Analytical Framework。Production Planning & Control,18,297-309。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
7. | Dajmaludim, V. D.、Murthy, N. P.、Wilson, R. J.(1994)。Quality Control Through Lot Sizing for Items Sold with Warranty。International Journal of Production Economics,33,97-107。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
8. | Ladany, S. P.、Shore, H.(2007)。Profit Maximizing Warranty Period with Sales Expressed by a Demand Function。Quality and Reliability Engineering International,23,291-301。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
9. | Wang, C. H.、Sheu, S. H.(2000)。Fast Approach to the Optimal Production/PM Policy。Computer and Mathematics with Applications,40,1297-1314。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
10. | Wang, C. H.、Sheu, S. H.(2003)。Optimal Lot Sizing for Products Sold Under Free-Repair Warranty。European Journal of Operation Research,49,131-141。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
11. | Yeh, R. H.、Chen, T. H.(2006)。Optimal lot size and inspection policy for products sold with warranty。European Journal of Operational Research,174,766-776。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
12. | Li, J.、Liu, L.(2008)。Supply chain coordination with manufacturer's limited reserve capacity: An extended newsboy problem。International Journal of Production Economics,112(2),860-868。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
13. | Chen, S. L.、Liu, C. L.(2008)。The optimal consignment policy for the manufacturer under supply chain coordination。International Journal of Production Research,46(18),5121-5143。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
14. | 陳忠和(20060100)。The Optimum Selection of Imperfect Quality Economic Manufacturing Quantity and Process Mean by Considering Quadratic Quality Loss Function。工業工程學刊,23(1),12-19。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
15. | 陳忠和、Michael B.C. Khoo(20080900)。Joint Determination of Optimum Process Mean and Economic Specification Limits for Rectifying Inspection Plan with Inspection Error。工業工程學刊,25(5),389-398。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
16. | Wang, Chih-Hsiung(2004)。The Impact of a Free-repair Warranty Policy on EMQ Model for Imperfect Production Systems。Computers & Operations Research,31(12),2021-2035。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |