期刊論文1. | Onwubolu, G.、Davendra, D.(2006)。Scheduling flow shops using differential evolution algorithm。European Journal of Operational Research,171(2),674-692。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
2. | Garey, M. R.、Johnson, D. S.、Sethi, R.(1976)。The complexity of flowshop and jobshop scheduling。Mathematics of Operations Research,1(2),117-129。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
3. | Al-Anzi, Fawaz S.、Allahverdi, Ali(20060700)。A Hybrid Tabu Search Heuristic for the Two-Stage Assembly Scheduling Problem。International Journal of Operations Research,3(2),109-119。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
4. | Al-Anzi, F. S.、Allahverdi, A.(2006)。A NSDE and a tabu Search Heuristics for Assembly Scheduling Problem of the Two-Stage Distributed Database Application。Computers & Operations Research,33,1056-1080。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
5. | Allahverdi, Ali、Al-Anzi, Fawaz S.(2006)。Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times。International Journal of Production Research,44,4713-4735。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
6. | Allahverdi, Ali、Al-Anzi, Fawaz S.(2008)。The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time。International Journal of Advanced Manufacturing Technology,37(1/2),166-177。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
7. | Allahverdi, Ali、Al-Anzi, Fawaz S.(2009)。The two-stage assembly scheduling problem to minimize total completion time with setup times。Computers & Operations Research,36,2740-2747。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
8. | Allahverdi, A.、Soroush, H. M.(2008)。The significance of reducing setup times/setup costs。European Journal of Operational Research,187,978-984。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
9. | Haouari, M.、Daouas, T.(1999)。Optimal scheduling of the 3-machine assembly-type flow shop。RAIRO--Operations Research,33,439-445。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
10. | Hariri, A. M. A.、Potts, C. N.(1997)。A branch and bound algorithm for the two-stage assembly scheduling problem。European Journal of Operational Research,103,547-556。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
11. | Potts, C. N.、Sevast'janov, S. V.、Strusevich, V. A.、Van Wassenhove, L. N.、Zwaneveld, C. M.(1995)。The two-stage assembly scheduling problem: Complexity and approximation。Operations Research,43,346-355。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
12. | Sun, X.、Morizawa, K.、Nagasawa, H.(2003)。Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling。European Journal of Operational Research,146,498-516。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
13. | Sung, C. S.、Kim, H. A.(2008)。A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times。International Journal of Production Economics,113,1038-1048。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
14. | Torabzadeh, E.、Zandieh, M.(2010)。Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop。Advances in Engineering Software,41,1238-1243。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
15. | Tozkapan, A.、Kirca, Ö.、Chung, C. S.(2003)。A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem。Computers & Operations Research,30,309-320。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
16. | Al-Anzi, F. S.、Allahverdi, A.(2007)。A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times。European Journal of Operational Research,182(1),80-94。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
17. | Allahverdi, A.、Ng, C. T.、Cheng, T. C. E.、Kovalyov, M. Y.(2008)。A survey of scheduling problems with setup times or costs。European Journal of Operational Research,187,985-1032。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
18. | Lee, C. Y.、Cheng, T. C. E.、Lin, B. M. T.(1993)。Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem。Management Science,39,616-625。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |