:::

詳目顯示

回上一頁
題名:Pricing and Collection Effort Decisions in a Closed-Loop Supply Chain
書刊名:工業工程學刊
作者:Chen, Jen-mingChang, Chia-i
出版日期:2016
卷期:33:8
頁次:頁568-578
主題關鍵詞:Closed-loop supply chainReversed logisticReturnGenetic algorithm
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:9
期刊論文
1.Chen, J. M.、Chang, C. I.(2012)。The co-opetitive strategy of a closed-loop supply chain with remanufacturing。Transportation Research Part E: Logistics and Transportation Review,48,387-400。  new window
2.Ferrer, G.、Swaminathan, J. M.(2010)。Managing new and differentiated remanufactured products。European Journal of Operational Research,203(2),370-379。  new window
3.Giuntini, R.、Gaudette, K.(2003)。Remanufacturing: The next great opportunity for boosting US productivity。Business Horizons,46,41-48。  new window
4.Debo, L. G.、Toktay, L. B.、Van Wassenhove, Luk N.(2005)。Market Segmentation and Product Technology Selection for Remanufacturable Products。Management Science,51(8),1193-1205。  new window
5.Savaskan, R. Canan、Bhattacharya, Shantanu、van Wassenhove, Luk N.(2004)。Closed-Loop Supply Chain Models with Product Remanufacturing。Management Science,50(2),239-252。  new window
6.Guide, V. Daniel R. Jr.、Van Wassenhove, Luk N.(2009)。The evolution of closed-loop supply chain research。Operations Research,57(1),10-18。  new window
7.Wang, Hsiao-Fan、Hsu, Hsin-Wei(2010)。A closed-loop logistic model with a spanning-tree based genetic algorithm。Computers and Operations Research,37(2),376-389。  new window
8.Kannan, G.、Sasikumar, P.、Devika, K.(2010)。A genetic algorithm approach for solving a closed loop supply chain model: A case of battery recycling。Applied Mathematical Modeling,34(3),655-670。  new window
9.Brandenburg, M.、Govindan, Kannan、Sarkis, J.、Seuring, S.(2014)。Quantitative models for sustainable supply chain management: Developments and directions。European Journal of Operational Research,233(1),299-312。  new window
10.Bulmus, S. C.、Zhu, S. X.、Teunter, R.(2014)。Competition for cores in remanufacturing。European Journal of Operational Research,233(1),105-113。  new window
11.Govindan, K.、Soleimani, H.、Kannan, D.(2015)。Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future。European Journal of Operational Research,240(3),603-626。  new window
12.Souza, G. C.(2013)。Closed-loop supply chains: A critical review, and future research。Decision Sciences,44(1),7-38。  new window
13.Atasu, A.、Sarvary, M.、Van Wassenhove, Luk N.(2008)。Remanufacturing as a marketing strategy。Management Science,54(10),1731-1746。  new window
14.Atasu, Atalay、Guide, V. Daniel R. Jr.、Van Wassenhove, Luk N.(2010)。So what if remanufacturing cannibalizes my new product sales?。California Management Review,52(2),56-76。  new window
15.Barber, Kevin D.、Beach, Roger、Zolkiewski, Judy(2012)。Environmental sustainability: A value cycle research agenda。Production Planning & Control: The Management of Operations,23(2/3),105-119。  new window
16.Bulmuş, S. C.、S. X. Zhu、R. H. Teunter(2014)。Optimal core acquisition and pricing strategies for hybrid manufacturing and remanufacturing systems。International Journal of Production Research,52,6627-6641。  new window
17.Chen, J. M.、C. I. Chang(2012)。The economics of a closed-loop supply chain with remanufacturing。Journal of the Operational Research Society,63,1323-1335。  new window
18.Chen, J. M.、Chang, C. I.(2013)。Dynamic pricing for new and remanufactured products in a closed-loop supply chain。International Journal of Production Economics,146(1),153-160。  new window
19.Chen, J. M.、C. I. Chang(2014)。Coordinating a closed-loop supply chain using a bargaining power approach。International Journal of Systems Science: Operations & Logistics,40,1051-1061。  new window
20.Feng, L.、J. Zhang、W. Tang(2013)。Optimal control of production and remanufacturing for a recovery system with perishable items。International Journal of Production Research,51,3977-3994。  new window
21.Ferguson, M. E.、Toktay, L. B.(2006)。The effect of competition on recovery strategies。Production and Operations Management,15(3),351-368。  new window
22.Ferrer, G.(1997)。The economics of tire remanufacturing。Resources, Conservation and Recycling,19(4),221-255。  new window
23.Ferrer, G.(1997)。The economics of personal computer remanufacturing。Resources, Conservation and Recycling,21,79-108。  new window
24.Ferrer, G.、R. U. Ayres(2000)。The impact of remanufacturing in the economy。Ecological Economics,32,413-429。  new window
25.Ferrer, G.、J. M. Swaminathan(2006)。Managing new and remanufactured products。Management Science,52,15-26。  new window
26.Garetti, M.、Taisch, M.(2012)。Sustainable manufacturing: trends and research challenges。Production Planning & Control: The Management of Operations,23,83-104。  new window
27.Geyer, R.、L. N. Van Wassenhove、A. Atasu(2007)。The economics of remanufacturing under limited component durability and finite life cycle。Management Science,53,88-100。  new window
28.Govindan, Kannan、Popiuc, M. N.(2014)。Reverse supply chain coordination by revenue sharing contract: A case for the personal computers industry。European Journal of Operational Research,233(2),326-336。  new window
29.Govindan, K.、M. N. Popiuc、A. Diabat(2014)。Overview of coordination contracts within forward and reverse supply chains。Journal of Cleaner Production,47,319-334。  new window
30.Gu, Q.、G. Tagaras(2014)。Optimal collection and remanufacturing decisions in reverse supply chains with collector's imperfect sorting。International Journal of Production Research,52,5155-5170。  new window
31.Ho, T. H.、S. Savin、C. Terwiesch(2011)。Note: a reply to "New product diffusion decisions under supply constraints"。Management Science,57,1811-1812。  new window
32.Hong, I-Hsuan、Yeh, Jun-Sheng(2012)。Modeling closed-loop supply chains in the electronics industry: A retailer collection application。Transportation Research Part E: Logistics and Transportation Review,48(4),817-829。  new window
33.Kulturel-Konak, S.、A. Konak(2013)。Linear programming based genetic algorithm for the unequal area facility layout problem。International Journal of Production Research,51,4302-4324。  new window
34.Lage, M. Jr.、M. G. Filho(2012)。Production planning and control for remanufacturing: literature review and analysis。Production Planning & Control: The Management of Operations,23,419-435。  new window
35.Li, C.(2013)。An integrated approach to evaluating the production system in closed-loop supply chains。International Journal of Production Research,51,4045-4069。  new window
36.Li, X.、G. Du(2011)。Inequality constraint handling in genetic algorithms using a boundary simulation method。Computers & Operations Research,39,521-540。  new window
37.Martin, P.、Guide, V. D. R. Jr.、Craighead, C. W.(2010)。Supply chain sourcing in remanufacturing operations: An empirical investigation of remake versus buy。Decision Sciences,41,301-324。  new window
38.Matsumoto, M.、Y. Umeda(2011)。An analysis of remanufacturing practices in Japan。Journal of Remanufacturing,1,1-11。  new window
39.McGuire, T. W.、R. Staelin(2008)。An industry equilibrium analysis of downstream。Marketing Science,27,115-130。  new window
40.Min, H.、H. J. Ko、C. S. Ko(2006)。A genetic algorithm approach to developing the multi-echelon reverse logistics network for product returns。Omega,34,56-69。  new window
41.Mitra, S.、Webster, S.(2008)。Competition in remanufacturing and the effects of government subsidies。International Journal of Production Economics,111(2),287-298。  new window
42.Paucar-Caceres, A.、Espinosa, A.(2011)。Management science methodologies in environmental management and sustainability: discourses and applications。Journal of the Operational Research Society,62,1601-1620。  new window
43.Savaskan, R. C.、L. N. Van Wassenhove(2006)。Reverse channel design: The case of competing retailers。Management Science,52,1-14。  new window
44.Shen, W.、I. Duenyas、R. Kapuscinski(2011)。New product diffusion decisions under supply constraints。Management Science,57,1802-1810。  new window
45.Sue, J.(2007)。Why buy remanufactured?。Recharger Magazine。  new window
46.Tosun, U.、T. Dokeroglu、A. Cosar(2013)。A robust island parallel genetic algorithm for the quadratic assignment problem。International Journal of Production Research,51,4117-4133。  new window
47.Vercraene, S.、J. P. Gayon、S. D. Flapper(2014)。Coordination of manufacturing, remanufacturing and returns acceptance in hybrid manufacturing/remanufacturing systems。International Journal of Production Economics,148,62-70。  new window
48.Webster, S.、Mitra, S.(2007)。Competitive strategy in remanufacturing and the impact of take-back laws。Journal of Operations Management,25(6),1123-1140。  new window
49.Zhang, L.、L. Gao、X. Li(2013)。A hybrid genetic algorithm and tabu search for a multi-objective dynamic job shop scheduling problem。International Journal of Production Research,51,3516-3531。  new window
50.Deng, S.、Yano, C. A.(2006)。Joint production and pricing decisions with setup costs and capacity constraints。Management Science,52,741-756。  new window
圖書
1.Kodak(2010)。Health, safety and environment annual report。Rochester, NY:The Kodak Corporation。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關期刊論文
 
無相關博士論文
 
無相關書籍
 
無相關著作
 
1. Total Tardiness Minimization in a Parallel Machine System with Flexible Periodic Maintenance
2. Interpretive Structural Modeling and Path Analysis for Proposed Framework of Lean Supply Chain in Indian Manufacturing Industry
3. A Branch-and-Bound Algorithm for Identical Parallel Machine Total Tardiness Scheduling Problem with preemption
4. Bi-Objective Optimization for Integrating Production and Preventive Maintenance Scheduling in Two-Stage Assembly Flow Shop Problem
5. Minimizing the Number of Tardy Jobs on a Two-Stage Assembly Flowshop
6. A Branch-and-Bound Algorithm for Identical Parallel-Machine Total Completion Time Scheduling Problem with Preemption and Release Times
7. An Exploration on Debugging Performance for Software Reliability Growth Models with Learning Effects and Change-Points
8. A Study on Nurse Day-Off Scheduling under the Consideration of Binary Preference
9. A Production Inventory Model for Vendor–Buyer Coordination with Quantity Discount, Backordering and Rework for Fixed Life Time Products
10. Secondary Use of Electric Vehicle Batteries and Potential Impacts on Business Models
11. A Pre-Dispatching Vehicle Method for a Diffusion Area in a 300 mm Wafer Fab
12. Measuring Schedule Uncertainty for a Stochastic Resource-Constrained Project Using Scenario-Based Approach with Utility-Entropy Decision Model
13. A Rostering Optimization Model for Physician Scheduling in Medical Department--A Case Study in District Hospital
14. Multi-Objective Metaheuristics for Solving a Type II Robotic Mixed-Model Assembly Line Balancing Problem
 
QR Code
QRCODE