:::

詳目顯示

回上一頁
題名:A Production Inventory Model for Vendor–Buyer Coordination with Quantity Discount, Backordering and Rework for Fixed Life Time Products
書刊名:工業工程學刊
作者:Muniappana, P.Uthayakumarb, R.Ganesh, S.
出版日期:2016
卷期:33:6
頁次:頁355-362
主題關鍵詞:ProductionInventoryQuantity discountBackorderingCoordinationRework
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:16
This study develops perishable items production inventory models with backordering and rework process. In the absence of coordination, shortages are allowed for the buyer and damaged products are returned to the vendor. The vendor himself makes arrangement for screening or disposal of the damaged products. During coordination strategy, shortages are not allowed, the quantity discount is provided to the buyer and the damaged products are not returned to the vendor. The buyer himself makes the arrangement for screening or disposal of the damaged products. In both cases, optimum multiples of orders and optimum order quantity are determined by vendor and buyer, which will minimize the total inventory cost. It proves that the coordination strategy can achieve system optimization. A numerical example is given to illustrate the solution procedure for the model. Finally, based on the example, we have conducted a sensitivity analysis of the model.
期刊論文
1.Kreng, V. B.、Tan, S. J.(2011)。Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy。Expert Systems with Applications,38(8),9888-9899。  new window
2.Tajbakhsh, M. M.、Lee, C. G.、Zolfaghari, S.(2011)。An inventory model with random discount offerings。Omega,39,710-718。  new window
3.Wahab, M. I. M.、Jaber, M. Y.(2010)。Economic order quantity model for items with imperfect quality, different holding costs, and learning effects: A note。Computers & Industrial Engineering,58(1),186-190。  new window
4.Giannoccaro, I.、Pontrandolfo, P.(2004)。Supply chain coordination by revenue sharing contracts。International Journal of Production Economics,89,131-139。  new window
5.Goyal, S. K.、Gupta, Y. P.(1989)。Integrated Inventory Models: The Buyer-vendor Coordination。European Journal of Operational Research,41(3),261-269。  new window
6.Fries, B.(1975)。Optimal order policies for a perishable commodity with fixed life time。Operations Research,23,46-61。  new window
7.Fujiwara, O.、Soewandi, H.、Sedarage, D.(1997)。An optimal and issuing policy for a two-stage inventory system for perishable products。European Journal of Operational Research,99,412-424。  new window
8.Chang, Hung-Chi(2011)。A comprehensive note on: An economic order quantity with imperfect quality and quantity discounts。Applied Mathematical Modelling,35(10),5208-5216。  new window
9.Kanchana, K.、Anulark, T.(2006)。An approximate periodic model for fixed-life perishable products in a two-echelon inventory distribution system。International Journal of Production Economics,100,101-115。  new window
10.Lian, Z.、Liu, L.(2011)。Continuous review perishable inventory systems: Models and heuristics。IIE Transactions,33,809-822。  new window
11.Liu, L.、Lian, Z.(1999)。(s, S) model for inventory with fixed life time。Operations Research,47,130-158。  new window
12.Liu, L.、Shi, D.(1999)。(s, S) model for inventory with exponential life times and renewal demands。Naval Research Logistics,46,39-56。  new window
13.Jaber, Mohamad Y.、Saadany, Ahmed M. A. El(2011)。An economic production and remanufacturing model with learning effects。International Journal of Production Economics,131,115-127。  new window
14.Nandakumar, P.、Morton, T. E.(1993)。Near myopic heuristic for the fixed life perishability problem。Management Science,39,1490-1498。  new window
15.Wong, W. K.、Qi, J.、Leung, S. Y. S(2009)。Coordinating supply chains with sales rebate contracts and vendormanaged inventory。International Journal of Production Economics,120,151-161。  new window
16.Duan, Yongrui、Luo, Jianwen、Huo, Jiazhen(2010)。Buyer-vendor inventory coordination with quantity discount incentive for fixed lifetime product。International Journal of Production Economics,128,351-357。  new window
17.Chiu, Yuan-Shyi Peter、Liu, Shang-Chih、Chiu, Chun-Lin、Chang, Huei-Hsin(2011)。Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments。Mathematical and Computer Modelling,54,2165-2174。  new window
18.Chen, L. H.、Kang, F. S.(2010)。Coordination Between Vendor and Buyer Considering Trade Credit and Items of Imperfect Quality。International Journal of Production Economics,123(3),52-61。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關期刊論文
 
無相關博士論文
 
無相關書籍
 
無相關著作
 
1. A Branch-and-Bound Algorithm for Identical Parallel Machine Total Tardiness Scheduling Problem with preemption
2. Bi-Objective Optimization for Integrating Production and Preventive Maintenance Scheduling in Two-Stage Assembly Flow Shop Problem
3. Minimizing the Number of Tardy Jobs on a Two-Stage Assembly Flowshop
4. A Branch-and-Bound Algorithm for Identical Parallel-Machine Total Completion Time Scheduling Problem with Preemption and Release Times
5. An Exploration on Debugging Performance for Software Reliability Growth Models with Learning Effects and Change-Points
6. A Study on Nurse Day-Off Scheduling under the Consideration of Binary Preference
7. Measuring Schedule Uncertainty for a Stochastic Resource-Constrained Project Using Scenario-Based Approach with Utility-Entropy Decision Model
8. A Rostering Optimization Model for Physician Scheduling in Medical Department--A Case Study in District Hospital
9. Interpretive Structural Modeling and Path Analysis for Proposed Framework of Lean Supply Chain in Indian Manufacturing Industry
10. Modified Single-Vendor Single-Buyer Supply Chain Model with Quality Loss for Product
11. On Two-door Three-dimensional Container Packing Problem under Home Delivery Service
12. A Computational Analysis of the Impact of Correlation and Data Translation on DEA Efficiency Scores
13. Slide Operation Method for a Touch Screen--The Concept of Connecting Audio Component
14. Bi-objective Closed-loop Supply Chain Network Design with Risks in a Fuzzy Environment
 
QR Code
QRCODE