題名:Unrelated Parallel-machine Scheduling with Controllable Processing Times and Eligibility Constraints to Minimize the Makespan
書刊名:工業工程學刊
作者:Low, ChinyaoWu, Guan-he
出版日期:2016
卷期:33:4
頁次:頁286-293
主題關鍵詞:SchedulingUnrelated parallel machinesEligibility constraintsResource allocationAnt colony optimization
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:30
期刊論文
1.Lenstra, J. K.、Shmoys, D. B.、Tardos, E.(1990)。Approximation algorithms for scheduling unrelated parallel machines。Mathematical Programming,46,259-271。  new window
2.Li, K.、Shi, Y.、Yang, S.-L.、Cheng, B.-Y.(2011)。Parallel machine scheduling problem to minimize the makespan。Applied Soft Computing,11(8),5551-5557。  new window
3.Shabtay, D.、Steiner, G.(2007)。A survey of scheduling with controllable processing times。Discrete Applied Mathematics,155,1643-1666。  new window
4.Yin, Y.、Cheng, T. C. E.、Wu, C. C.、Cheng, S. R.(2013)。Single-machine common due-date scheduling with batch delivery costs and resource- dependent processing times。International Journal of Production Research,51,5083-5099。  new window
5.Guo, Chengtao、Jiang, Zhibin、Zhang, Huai、Li, Na(2012)。Decomposition-based classified ant colony optimization algorithm for scheduling semiconductor wafer fabrication system。Computers and Industrial Engineering,62(1),141-151。  new window
6.Dorigo, Marco、Gambardella, Luca Maria(1997)。Ant Colony System: A cooperative learning approach to the traveling salesman problem。IEEE Transactions on Evolutionary Computation,1(1),53-66。  new window
7.Dorigo, M.、Birattari, M.、Stutzle, T.(2006)。Ant colony optimization。IEEE Computational Intelligence Magazine,1(4),28-39。  new window
8.Dorigo, M.、Maniezzo, V.、Colorni, A.(1996)。Ant system: optimization by a colony of cooperating agents。IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics,26(1),29-41。  new window
9.Blum, C.、Dorigo, M.(2004)。The hyper-cube framework for ant colony optimization。IEEE Transactions on Systems, Man and Cybernetics, Part B (Cybernetics),34,1161-1172。  new window
10.Dong, M.(2013)。Parallel machine scheduling with limited controllable machine availability。International Journal of Production Research,51,2240-2252。  new window
11.Arnaout, J. P.、Rabadi, G.、Musa, R.(2010)。A two-stage ant colony optimization algorithm to minimize the makespan on unrelated parallel machines with sequence-dependent setup times。Journal of Intelligent Manufacturing,21,693-701。  new window
12.Blum, C.(2005)。Beam-ACO-hybridizing ant colony optimization with beam search: An application to open shop scheduling。Computers & Operations Research,32,1565-1591。  new window
13.Behnamian, J.、Ghomi, S. M. T. Fatemi(2011)。Hybrid flowshop scheduling with machine and resource-dependent processing times。Applied Mathematical Modelling,35(3),1107-1123。  new window
14.Cheng, T. C. E.、Janiak, A.(2000)。A permutation flow-shop scheduling problem with convex models of operation processing times。Annals of Operations Research,96,39-60。  new window
15.Daniels, R. L.、Hua, S. Y.、Webster, S.(1999)。Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment。Computers & Operations Research,26,143-155。  new window
16.Hsieh, P. H.、Yang, S. J.、Yang, D. L.(2015)。Decision support for unrelated parallel machine scheduling with discrete controllable processing times。Applied Soft Computing,30,475-483。  new window
17.Janiak, A.(1998)。Minimization of the makespan in a two-machine problem under given resource constraints。European Journal of Operational Research,107,325-337。  new window
18.Jozefowska, J.、Mika, M.、Rozycki, R.(2002)。A heuristic approach to allocating the continuous resource in discrete continuous scheduling problems to minimize the makespan。Journal of Scheduling,5,487-499。  new window
19.Jansen, K.、Mastrolilli, M.(2004)。Approximation schemes for parallel machine scheduling problems with controllable processing times。Computers & Operations Research,31,1565-1581。  new window
20.Janiak, A.、Janiak, W.、Lichtenstein, M.(2007)。Resource management in machine scheduling problems: a survey。Decision Making in Manufacturing and Services,1,59-89。  new window
21.Liao, C. J.、Juan, H. C.(2007)。An ant colony optimization for single-machine tardiness scheduling with sequence-dependent setups。Computers & Operations Research,34,1899-1909。  new window
22.Lin, B. M. T.、Lu, C. Y.、Shyu, S. J.、Tsai, C. Y.(2008)。Development of new features of ant colony optimization for flowshop scheduling。International Journal of Production Economics,112,742-755。  new window
23.Leyvand, Y.、Shabtay, D.、Steiner, G.、Yedidsion, L.(2010)。Just-in-time scheduling with controllable processing times on parallel machines。Journal of Combinatorial Optimization,19,347-368。  new window
24.Liu, L.、Wang, J. J.、Wang, X. Y.(2015)。Single machine duewindow assignment scheduling with resource-dependent processing times to minimise total resource consumption cost。International Journal of Production Research。  new window
25.Mokhtari, H.、Abadi, I. N. K.、Cheraghalikhani, A.(2010)。A multi-objective flow shop scheduling with resource-dependent processing times: trade-off between makespan and cost of resources。International Journal of Production Research,49,5851-5875。  new window
26.Oron, D.(2014)。Scheduling controllable processing time jobs in a deteriorating environment。Journal of the Operational Research Society,65,49-56。  new window
27.Shabtay, D.、Kaspi, M.(2006)。Parallel machine scheduling with a convex resource consumption function。European Journal of Operational Research,173,92-107。  new window
28.Su, L. H.、Lien, C. Y.(2009)。Scheduling parallel machines with resource-dependent processing times。International Journal of Production Economics,117,256-266。  new window
29.Raghavan, N. R.、Venkataramana, M.(2009)。Parallel processor scheduling for minimizing total weighted tardiness using ant colony optimization。The International Journal of Advanced Manufacturing Technology,41,986-996。  new window
30.Keskinturk, T.、Yildirim, M. B.、Barut, M.(2012)。An ant colony optimization algorithm for load balancing in parallel machines with sequence-dependent setup times。Computers & Operations Research,39,1225-1235。  new window
31.Wang, J. B.、Wang, J. J.(2015)。Research on scheduling with job-dependent learning effect and convex resource-dependent processing times。International Journal of Production Research,53,5826-5836。  new window
 
 
 
 