期刊論文1. | Sun, K.、Li, H.(2010)。Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines。International Journal of Production Economics,124(1),151-158。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
2. | Lee, J. Y.、Kim, Y. D.(2012)。Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance。Computers and Operations Research,39,2196-2205。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
3. | Ma, Y.、Chu, C. B.、Zuo, C. R.(2010)。A survey of scheduling with deterministic machine availability constraints。Computers & Industrial Engineering,58,199-211。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
4. | Kubzin, M. A.、Strusevich, V. A.(2006)。Planning machine maintenance in two-machine shop scheduling。Operations Research,54(4),789-800。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
5. | Su, Ling-Huey、Wang, Hui-Mei(2017)。Minimizing total absolute deviation of job completion times on a single machine with cleaning activities。Computers & Industrial Engineering,103,242-249。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
6. | Ho, J. C.、Chang, Y. L.(1995)。Minimizing the number of tardy jobs for m parallel machines。European Journal of Operational Research,84(2),343-355。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
7. | Moore, J. M.(1968)。An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs。Management science,15(1),102-109。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
8. | Lawler, E. L.、Martel, C. U.(1989)。Preemptive scheduling of two uniform machines to minimize the number of late jobs。Operations Research,37(2),314-318。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
9. | M'Hallah, R.、Bulfin, R. L.(2005)。Minimizing the weighted number of tardy jobs on parallel processors。European Journal of Operational Research,160(2),471-484。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
10. | M'Hallah, R.、Al-Khamis, T.(2015)。A Benders decomposition approach to the weighted number of tardy jobs scheduling problem on unrelated parallel machines with production costs。International Journal of Production Research,53(19),5977-5987。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
11. | Bornstein, C. T.、Alcoforado, L. F.、Maculan, N.(2005)。A graph-oriented approach for the minimization of the number of late jobs for the parallel machines scheduling problem。European journal of operational research,165(3),649-656。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
12. | Ruiz-Torres, A. J.、López, F. J.、Ho, J. C.(2007)。Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs。European Journal of Operational Research,179(2),302-315。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
13. | Đurasević, M.、Jakobović, D.、Knežević, K.(2016)。Adaptive scheduling on unrelated machines with genetic programming。Applied Soft Computing,48,419-430。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
14. | 楊達立、洪清鏈、許洲榮、陳茂生(20020100)。Minimizing the Makespan in a Single Machine Scheduling Problem with a Flexible Maintenance。工業工程學刊,19(1),63-66。 延伸查詢![new window](/gs32/images/newin.png) |
15. | Gharbi, A.、Haouari, M.(2005)。Optimal parallel machines scheduling with availability constraints。Discrete Applied Mathematics,148(1),63-87。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
16. | Liao, L. W.、Sheen, G. J.(2008)。Parallel machine scheduling with machine availability and eligibility constraints。European Journal of Operational Research,184(2),458-467。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
17. | Xu, D.、Cheng, Z.、Yin, Y.、Li, H.(2009)。Makespan minimization for two parallel machines scheduling with a periodic availability constraint。Computers & Operations Research,36(6),1809-1812。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
18. | Fu, B.、Huo, Y.、Zhao, H.(2011)。Approximation schemes for parallel machine scheduling with availability constraints。Discrete Applied Mathematics,159(15),1555-1565。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
19. | Tavana, M.、Zarook, Y.、Santos-Arteaga, F. J.(2015)。An integrated three-stage maintenance scheduling model for unrelated parallel machines with aging effect and multi-maintenance activities。Computers & Industrial Engineering,83,226-236。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
20. | Wang, X.、Cheng, T. C. E.(2015)。A heuristic for scheduling jobs on two identical parallel machines with a machine availability constraint。International Journal of Production Economics,161,74-82。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
21. | Yoo, J.、Lee, I. S.(2016)。Parallel machine scheduling with maintenance activities。Computers & Industrial Engineering,101,361-371。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
22. | Ni, J.、Gu, X.、Jin, X.(2015)。Preventive maintenance opportunities for large production systems。CIRP Annals,64(1),447-450。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
23. | Compare, M.、Martini, F.、Zio, E.(2015)。Genetic algorithms for condition-based maintenance optimization under uncertainty。European journal of operational research,244(2),611-623。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
24. | Costa, Antonio、Cappadonna, Fulvio Antonio、Fichera, Sergio(20161000)。Total Tardiness Minimization in a Parallel Machine System with Flexible Periodic Maintenance。工業工程學刊,33(7),485-494。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
25. | Xiao, L.、Song, S.、Chen, X.、Coit, D. W.(2016)。Joint optimization of production scheduling and machine group preventive maintenance。Reliability Engineering & System Safety,146,68-78。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
26. | Detienne, B.(2014)。A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints。European Journal of Operational Research,235(3),540-552。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
27. | Lee, C. Y.、Chen, Z. L.(2000)。Scheduling jobs and maintenance activities on parallel machines。Naval Research Logistics,47,145-165。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
28. | Mellouli, R.、Sadfi, C.、Chu, C.、Kacem, I.(2009)。Identical Parallel-Machine Scheduling Under Availability Constraints to Minimize the Sum of Completion Times。European Journal of Operational Research,197(3),1150-1165。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |