期刊論文1. | Sana, S. S.(2010)。A production-inventory model in an imperfect production process。European Journal of Operational Research,200(2),451-464。 |
2. | Tahera, K.、Chan, W. M.、Ibrahim, R. N.(2008)。Joint determination of process mean and production run: A review。International Journal of Advanced Manufacturing Technology,39(3/4),388-400。 |
3. | Sana, S. S.、Goyal, S. K.、Chauduri, K.(2007)。On a volume flexible inventory model for items with an imperfect production system。International Journal of Operational Research,2,64-80。 |
4. | Sana, S. S.、Goyal, S. K.、Chaudhuri, K. S.(2007)。An imperfect production process in a volume flexible inventory model。International Journal of Production Economics,105(2),548-559。 |
5. | Darwish, M. A.、Abdulmalek, F.(2012)。An integrated single-vendor single-buyer targeting problem with time-dependent process mean。International Journal of Logistics and Management,13,51-64。 |
6. | Darwish, M. A.、Abdulmalek, F.、Alkhedher, M.(2013)。Optimal selection of process mean for a stochastic inventory model。European journal of Operational Research,226,481-490。 |
7. | Darwish, M. A.、Duffuaa, S. O.(2010)。A mathematical model for the joint determination of optimal process and sampling plan parameters。Journal of Quality in Maintenance Engineering,16,181-189。 |
8. | Duffuaa, S. O.、El-Ga'aly, A.(2013)。A multi-objective mathematical optimization model for process targeting using 100% inspection policy。Applied Mathematical Modeling,37,1545-1552。 |
9. | Duffuaa, S. O.、El-Ga'aly, A.(2013)。A multi-objective optimization model for process targeting using sampling plans。Computers & Industrial Engineering,64,309-317。 |
10. | Jeang, A.(2013)。Concurrent product and process parameters determination under deterioration process。Applied Mathematics and Computation,219,9132-9141。 |
11. | Jeang, A.(2011)。Economic production order quantity and quality。International Journal of Production Research,49,1753-1783。 |
12. | 李旭華(20130600)。The Linkage of Process Capability without Target Value on the Center in Six Sigma Management。中國統計學報,51(2),211-224。 |
13. | Pan, J. N.、Pan, J.(2009)。Optimization of engineering tolerance design using revised loss functions。Engineering Optimization,41,99-118。 |
14. | Darwish, M. A.(2009)。Economic selection of process mean for single-vendor single-buyer supply chain。European Journal of Operational Research,199(1),162-169。 |
15. | Jeang, A.(2010)。Production order quantity for economical and quality consideration。Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture,224,1277-1294。 |
16. | Boyles, R. A.(1991)。The Taguchi capability index。Journal of Quality Technology,23,107-126。 |
17. | Jeang, A.、Chung, C. P.(2009)。Process capability analysis based on minimum production cost and quality loss。The International Journal of Advanced Manufacturing Technology,43(7),710-719。 |
18. | Pearn, W. L.、Kotz, S.、Johnson, N. L.(1992)。Distributional and Inferential Properties of Process Capability Indices。Journal of Quality Technology,24(4),216-231。 |
19. | Sarkar, B.、Sana, S. S.、Chaudhuri, K. S.(2010)。Optimal reliability, production lot size and safety stock in an imperfect production system。International Journal of Mathematics in Operational Research,2(4),467-490。 |
20. | Chen, Chung-ho、Chou, Chao-yu、Kan, Chao-chin(20150400)。Modified Economic Production and Raw Material Model with Quality Loss for Conforming Product。工業工程學刊,32(3),196-203。 |
21. | Chen, Chung-ho、Khoo, Michael B. C.、Chou, Chao-yu、Kan, Chao-chin(20150600)。Joint Determination of Process Quality Level and Production Run Time for Imperfect Production Process。工業工程學刊,32(4),219-224。 |
22. | Chen, Chung-ho、Chou, Chao-yu、Kan, Chao-chin(20140600)。Economic Specification Limits and Process Mean Settings by Considering Unequal Target Value and Specification Center。工業工程學刊,31(4),(3)1-(3)7。 |
23. | Chen, Chung-ho、Chou, Chao-yu、Kan, Chao-chin、Khoo, Michael B. C.(20140600)。Production Quantity and Specification Limits Settings by Considering Specified Process Capability Value。工業工程學刊,31(4),(6)1-(6)9。 |
24. | Pal, B.、Sana, S. S.、Chaudhuri, K.(2012)。Three-layer supply chain--a production-inventory model for reworkable items。Appl. Math. Comput.,219(2),530-543。 |
25. | Cárdenas-Barrón, L. E.、Sana, S. S.(2015)。Multi-item EOQ inventory model in a two-layer supply chain while demand varies with a promotional effort。Appl. Math. Modell.,39,6725-6737。 |
26. | Cárdenas-Barrón, L. E.、Treviño-Garza, G.、Taleizadeh, A. A.(2015)。Determining replenishment lot size and shipment policy for an EPQ inventory model with delivery and rework。Math. Prob. Eng.,1-8。 |
27. | Cárdenas-Barrón, L. E.、Chung, K. J.、Treviño-Garza, G.(2014)。Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris。Int J Prod Econ,155,1-7。 |
28. | Sana, S. Sankar(2010)。An economic production lot size model in an imperfect production system。Eur. J. Oper. Res.,201(1),158-170。 |
29. | Chen, Chung-ho、Tsai, Wen-ren(20161200)。Modified Single-Vendor Single-Buyer Supply Chain Model with Quality Loss for Product。工業工程學刊,33(8),495-500。 |
30. | Chakraborty, T.、Giri, B. C.、Chaudhuri, K. S.(2009)。Production lot sizing with process deterioration and machine breakdown under inspection schedule。Omega,37,257-271。 |
31. | Tahera, K.、Ibrahim, R. N.、Lochert, P. B.(2010)。The effect of non-constant process variance in determining the optimal process mean and production run of a deteriorating process。Prod. Plan. Control,21,36-46。 |
32. | Jeang, A.(2009)。Optimal parameters design and maintenance interval for a product with quality and cost considerations。Proc. Inst. Mech. Eng. B: J. Eng. Manuf.,223,737-750。 |
33. | Pearn, W. L.、Wu, C. H.(2013)。Supplier selection for multi-characteristics processes with one-sided specifications。Qual. Technol. Quant. Manage.,10,133-139。 |
34. | Nobil, A. H.、Sedigh, A. H. A.、Cardenas-Barron, L. E.(2016)。A multimachine multi-product EPQ problem for an imperfect manufacturing system considering utilization and allocation decisions。Expert Syst. App.,56,310-319。 |
35. | Pacheco-Velazquez, E. A.、Cardenas-Barron, L. E.(2016)。An economic production quantity (EPQ) inventory model with backorders considering the raw material costs。Sci. Iran. Trans. E,23,736-746。 |
36. | Jeang, A.(2010)。Optimal process capability analysis for process design。Int. J. Prod. Res.,48,957-989。 |
37. | Jeang, A.(2012)。Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown。Omega,40,774-781。 |
38. | Jeang, A.、Lin, Y. K.(2014)。Product and process parameters determination for quality and cost。Int. J. Syst. Sci.,45,2042-2054。 |
39. | Roy, M. D.、Sana, S. S.、Chaudhuri, K.(2011)。An optimal shipment strategy for imperfect items in a stock-out situation。Math. Comput. Model.,54,2528-2543。 |
40. | Pal, B.、Sana, S. S.、Chaudhuri, K.(2013)。A mathematical model on EPQ for stochastic demand in imperfect production system。J. Manuf. Syst.,32,260-270。 |
41. | Pal, B.、Sana, S. S.、Chaudhuri, K. S.(2013)。Maximising profits for an EPQ model with unreliable machine and rework of random defective items。International Journal of Systems Science,44(3),582-594。 |
42. | Pasandideh, S. H. R.、Niaki, S. T. A.、Nobil, A. H.、Cárdenas-Barrón, L. E.(2015)。A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost。International Journal of Production Economics,169,203-214。 |