| 期刊論文1. | Abdo, H.、Flaus, J.(2016)。Monte Carlo simulation to solve fuzzy dynamic fault tree。Ifac Papers online,49(12),1886-1891。 | 2. | Ahmed, W.、Hasan, O.、Tahar, S.(2016)。Formalization of reliability block diagrams in higher order logic。Journal of Applied Logic,18,19-41。 | 3. | Campean, F.、Yildirim, U.(2017)。Enhanced sequence diagram for function modelling of complex systems。Procedia Cirp,60,273-278。 | 4. | Denning, R.、Budnitz, R.(2017)。Impact of probabilistic risk assessment and severe accident research in reducing reactor risk。Progress in Nuclear Energy,102,90-102。 | 5. | Ding, L.、Wang, H.、Jiang, J.(2017)。SIL verification for srs with diverse redundancy based on system degradation using reliability block diagram。Reliability Engineering & System Safety,165,170-187。 | 6. | DurgaRao, K.、Gopika, V.(2009)。Dynamic fault tree analysis using Monte Carlo simulation in probabilistic safety assessment。Reliability Engineering and System Safety,94,872-883。 | 7. | Groen, F.、Smidts, C.、Mosleh, A.(2006)。QRAS - The quantitative risk assessment system, Reliability Engineering。System Safety,91(3),292-304。 | 8. | Kaczor, G.、Mlynarski, S.、Szkoda, M.(2016)。Verification of safety integrity level with the application of Monte Carlo simulation and reliability block diagrams。Journal of Loss Prevention in the Process Industries,41,31-39。 | 9. | Kwag, S.、Gupta, A.、Dinh, N.(2018)。Probabilistic risk assessment based model validation method using bayesian network。Reliability Engineering & System Safety,169,380-393。 | 10. | Lewandowski, R.、Denning, R.、Aldemir, T.(2016)。Implementation of condition-dependent prob abilistic risk assessment using surveillance data on passive components。Annals of Nuclear Energy,87,696-706。 | 11. | Li, X.、Huang, H.、Li, Y.(2018)。Reliability assessment of multi-state phased mission system with non-repairable multi-state components。Applied Mathematical Modelling,61,181-199。 | 12. | Li, X.、Huang, H.、Li, Y.(2018)。Reliability analysis of phased mission system with non exponential and partially repairable components。Reliability Engineering & System Safety,175,119-127。 | 13. | Wang, C.、Xing, L.、Peng, R.(2017)。Competing failure analysis in phased-mission systems with multiple functional dependence groups。Reliability Engineering & System Safety,164,24-33。 | 14. | Wang, Y.、Xing, L.、Levitin, G.(2018)。Probabilistic competing failure analysis in phased-mission systems。Reliability Engineering & System Safety,176,37-51。 | 15. | Xing, L.、Dugan, J. B.(2002)。BDD-based reliability analysis of phased-mission systems with multimode failures。IEEE Trans. Reliability,51(2),199-211。 | 16. | Zhai, Q.、Xing, L.、Peng, R.(2018)。Aggregated combinatorial reliability model for non-repairable parallel phased-mission systems, Reliability Engineering。System Safety,176,242-250。 | 17. | Zhang, S.、Tong, J.、Zhao, J.(2016)。An integrated modeling approach for event sequence devel opment in multi-unit probabilistic risk assessment。Reliability Engineering & System Safety,155,147-159。 | 18. | Zhou, J.、Reniers, G.、Khakzad, N.(2016)。Application of event sequence diagram to evaluate emergency response actions during fire-induced domino effects。Reliability Engineering & System Safety,150,202-209。 | 19. | Zhou, T.、Modarres, M.、Droguett, E.(2018)。An improved multi-unit nuclear plant seismic probabilistic risk assessment approach。Reliability Engineering & System Safety,171,34-47。 | 20. | Zitrou, A.、Bedford, T.、Walls, L.(2010)。Bayes geometric scaling model for common cause failure rates。Reliability Engineering and System Safety,95,70-76。 | 會議論文1. | Azarkhail, M.、Modarres, M.(2006)。An Intelligent Agent-Oriented Approach to Risk Analysis of Complex Dynamic System with Applications in Planetary Mission。 | 2. | Gupta, A.、Nouri, K.(2006)。QRAS Approach to Phased Mission Analysis。 | 3. | Mandelli, D.、Aldemir, T.、Zio, E.(2006)。An Event Tree/Fault Tree/Embedded Markov Model Approach for the PSAM-8 Benchmark Problem Concerning A Phased Mission Space Propulsion subsystem。 | |