:::

詳目顯示

回上一頁
題名:An Imperfect Production System with Predictive Maintenance Policy under Trade Credit
書刊名:International Journal of Information and Management Sciences
作者:Tsao, Yu-chungLee, Pei-lingZhang, QinhongVu, Thuy-linhFang, K. C.
出版日期:2020
卷期:31:1
頁次:頁15-34
主題關鍵詞:InventoryImperfect production systemPredictive maintenanceCorrective maintenanceTrade credit
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:5
期刊論文
1.Teng, Jinn-Tsair、Chang, Chun-Tao(2009)。Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy。European Journal of Operational Research,195(2),358-363。  new window
2.Ouyang, L.-Y.、Chang, C.-T.(2013)。Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging。International Journal of Production Economics,144(2),610-617。  new window
3.Chung, K. J.、Huang, Y. F.(2003)。The Optimal Cycle Time for EPQ Inventory Model under Permissible Delay in Payments。International Journal of Production Economics,84(3),307-318。  new window
4.Kreng, V. B.、Tan, S. J.(2011)。Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy。Expert Systems with Applications,38(8),9888-9899。  new window
5.Chen, S.-C.、Teng, J.-T.、Skouri, K.(2014)。Economic production quantity models for deteriorating items with up-stream full trade credit and down-stream partial trade credits。International Journal of Production Economics,155,302-309。  new window
6.Lee, H. L.、Rosenblatt, M. J.(1987)。Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System。Management Science,33(9),1125-1136。  new window
7.Ben-Daya, M.、Makhdoum, M.(1998)。Integrated production and quality model under various preventive maintenance policies。Journal of the Operational Research Society,49(8),840-853。  new window
8.Ben-Daya, M.(2002)。The economic production lot-sizing problem with imperfect production processes and imperfect maintenance。International Journal of Production Economics,76(3),257-264。  new window
9.Jamal, A. M. M.、Sarker, B. R.、Mondal, S.(2004)。Optimal manufacturing batch size with rework process at a single-stage production system。Computers & Industrial Engineering,47(1),77-89。  new window
10.Taleizadeh, A. A.、Cárdenas-Barrón, L. E.、Mohammadi, B.(2014)。A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process。International Journal of Production Economics,150,9-27。  new window
11.Pal, B.、Sana, S. S.、Chaudhuri, K. S.(2013)。Maximising profits for an EPQ model with unreliable machine and rework of random defective items。International Journal of Systems Science,44(3),582-594。  new window
12.Sarkar, B.、Cárdenas-Barrón, L. E.、Sarkar, M.、Singgih, Moses Laksono(2014)。An economic production quantity model with random defective rate, rework process and backorders for a single stage production system。Journal of Manufacturing Systems,33(3),423-435。  new window
13.Huang, Y. F.(2007)。Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy。European Journal of Operational Research,176(3),1577-1591。  new window
14.Sett, B. K.、Sarker, S.、Sarker, B.(2017)。Optimal buffer inventory and inspection errors in an imperfect production system with preventive maintenance。The International Journal of Advanced Manufacturing Technology,90,545-560。  new window
15.Tayal, S.、Singh, S. R.、Sharma, R.(2016)。An integrated production inventory model for perishable products with trade credit period and investment in preservation technology。International Journal of Mathematics in Operational Research,8(2),137-163。  new window
16.Terence, J. P.(1997)。Data requirements for the prioritization of predictive building maintenance。Facilities,15(3/4),97-104。  new window
17.Tsao, Y. C.、Chen, T. H.、Huang, S. M.(2011)。A production policy considering reworking of imperfect items and trade credit。Flexible Services and Manufacturing Journal,23(1),48-63。  new window
18.Tsao, Y. C.、Chen, T. H.、Zhang, Q. H.(2013)。Effects of maintenance policy on an imperfect production system under trade credit。International Journal of Production Research,51(5),1549-1562。  new window
19.Tsao, Y. C.、Zhang, Q.、Chang, F. C.、Vu-Thuy, L.(2017)。An imperfect production model under Radio Frequency Identification adoption and trade credit。Applied Mathematical Modelling,42,493-508。  new window
20.Wen, D.、Ershun, P.、Ying, W.、Wenzhu, L.(2016)。An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy。Journal of Intelligent Manufacturing,27(6),1323-1333。  new window
21.Goyal, Suresh Kumar(1985)。Economic order quantity under conditions of permissible delay in payments。Journal of the Operational Research Society,36(4),335-338。  new window
會議論文
1.Huang, Y. F.、Weng, M. W.、Lee, C. C.、Huang, H. F.(2017)。An economic production quantity model with imperfect production processes and corrective maintenance under allowable shortages。The 2017 IEEE 8th International Conference on Awareness Science and Technology,(會議日期: 8-10 Nov., 2017)。  new window
圖書
1.Mobley, R. Keith(2002)。An introduction to predictive maintenance。Butterworth-Heinemann。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關期刊論文
 
無相關博士論文
 
無相關書籍
 
無相關著作
 
QR Code
QRCODE