期刊論文1. | Teng, Jinn-Tsair、Chang, Chun-Tao(2009)。Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy。European Journal of Operational Research,195(2),358-363。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
2. | Ouyang, L.-Y.、Chang, C.-T.(2013)。Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging。International Journal of Production Economics,144(2),610-617。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
3. | Chung, K. J.、Huang, Y. F.(2003)。The Optimal Cycle Time for EPQ Inventory Model under Permissible Delay in Payments。International Journal of Production Economics,84(3),307-318。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
4. | Kreng, V. B.、Tan, S. J.(2011)。Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy。Expert Systems with Applications,38(8),9888-9899。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
5. | Chen, S.-C.、Teng, J.-T.、Skouri, K.(2014)。Economic production quantity models for deteriorating items with up-stream full trade credit and down-stream partial trade credits。International Journal of Production Economics,155,302-309。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
6. | Lee, H. L.、Rosenblatt, M. J.(1987)。Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System。Management Science,33(9),1125-1136。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
7. | Ben-Daya, M.、Makhdoum, M.(1998)。Integrated production and quality model under various preventive maintenance policies。Journal of the Operational Research Society,49(8),840-853。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
8. | Ben-Daya, M.(2002)。The economic production lot-sizing problem with imperfect production processes and imperfect maintenance。International Journal of Production Economics,76(3),257-264。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
9. | Jamal, A. M. M.、Sarker, B. R.、Mondal, S.(2004)。Optimal manufacturing batch size with rework process at a single-stage production system。Computers & Industrial Engineering,47(1),77-89。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
10. | Taleizadeh, A. A.、Cárdenas-Barrón, L. E.、Mohammadi, B.(2014)。A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process。International Journal of Production Economics,150,9-27。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
11. | Pal, B.、Sana, S. S.、Chaudhuri, K. S.(2013)。Maximising profits for an EPQ model with unreliable machine and rework of random defective items。International Journal of Systems Science,44(3),582-594。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
12. | Sarkar, B.、Cárdenas-Barrón, L. E.、Sarkar, M.、Singgih, Moses Laksono(2014)。An economic production quantity model with random defective rate, rework process and backorders for a single stage production system。Journal of Manufacturing Systems,33(3),423-435。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
13. | Huang, Y. F.(2007)。Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy。European Journal of Operational Research,176(3),1577-1591。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
14. | Sett, B. K.、Sarker, S.、Sarker, B.(2017)。Optimal buffer inventory and inspection errors in an imperfect production system with preventive maintenance。The International Journal of Advanced Manufacturing Technology,90,545-560。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
15. | Tayal, S.、Singh, S. R.、Sharma, R.(2016)。An integrated production inventory model for perishable products with trade credit period and investment in preservation technology。International Journal of Mathematics in Operational Research,8(2),137-163。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
16. | Terence, J. P.(1997)。Data requirements for the prioritization of predictive building maintenance。Facilities,15(3/4),97-104。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
17. | Tsao, Y. C.、Chen, T. H.、Huang, S. M.(2011)。A production policy considering reworking of imperfect items and trade credit。Flexible Services and Manufacturing Journal,23(1),48-63。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
18. | Tsao, Y. C.、Chen, T. H.、Zhang, Q. H.(2013)。Effects of maintenance policy on an imperfect production system under trade credit。International Journal of Production Research,51(5),1549-1562。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
19. | Tsao, Y. C.、Zhang, Q.、Chang, F. C.、Vu-Thuy, L.(2017)。An imperfect production model under Radio Frequency Identification adoption and trade credit。Applied Mathematical Modelling,42,493-508。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
20. | Wen, D.、Ershun, P.、Ying, W.、Wenzhu, L.(2016)。An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy。Journal of Intelligent Manufacturing,27(6),1323-1333。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |
21. | Goyal, Suresh Kumar(1985)。Economic order quantity under conditions of permissible delay in payments。Journal of the Operational Research Society,36(4),335-338。 ![](/gs32/thssjcncl/image/nclsfx.gif) ![new window](/gs32/images/newin.png) |