:::

詳目顯示

回上一頁
題名:Optimization of Fuzzy Integrated Inventory Model with Ordering Cost Reduction Dependent on Lead Time
書刊名:International Journal of Operations Research
作者:Vithyadevi, R.Annadurai, K.
出版日期:2021
卷期:18:4
頁次:頁79-96
主題關鍵詞:Optimal integrated total costOptimal order quantityGraded mean integration representation methodFuzzy inventory systemLagrangian method
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:1
  • 點閱點閱:3
期刊論文
1.Chen, Cheng-kang、Chang, Hung-chi、Ouyang, Liang-yuh(20010900)。A Continuous Review Inventory Model with Ordering Cost Dependent on Lead Time。International Journal of Information and Management Sciences,12(3),1-13。  new window
2.Hsieh, C. H.(2002)。Optimization of fuzzy production inventory models。Information Sciences: An International Journal,146,29-40。  new window
3.Chen, S. H.、Wang, C. C.、Arthur Ramer, A.(1996)。Backorder Fuzzy Inventory Model under Function Principle。Information Sciences: An International Journal,95(1/2),71-79。  new window
4.Annadurai, K.、Uthayakumar, R.(2010)。Controlling setup cost in (Q, r, L) inventory model with defective items。Applied Mathematical Modelling,34(6),1418-1427。  new window
5.Chen, S. H.、Hsieh, C. H.(2000)。Representation, Ranking, Distance, and Similarity of L-R type fuzzy number and Application。Australian Journal of Intelligent Information Processing Systems,6(4),217-229。  new window
6.Zimmermann, H. J.(1983)。Using Fuzzy Sets in Operational Research。European J. of Operational Research,13(3),201-216。  new window
7.Annadurai, K.、Uthayakumar, R.(2010)。Reducing lost-sales rate in (T, R, L) inventory model with controllable leadtime。Applied Mathematical Modelling,34(11),3465-3477。  new window
8.Billington, P. J.(1987)。The classical economic production quantity model with setup cost as a function of capital expenditure。Decision Sciences,18(1),25-42。  new window
9.El-Wakeel, M. F.、Al-yazidi, K. O.(2016)。Fuzzy constrained probabilistic inventory models depending on trapezoidal fuzzy numbers。Hindawi Publishing Corporation Advances in Fuzzy Systems,2016,1-10。  new window
10.Jaggi, C. K.、Yadavalli, V. S. S.、Sharma, Anuj、Tiwari, Sunil(2016)。A fuzzy EOQ model with allowable shortage under different trade credit terms。Applied Mathematics & Information Sciences,10(2),785-805。  new window
11.Li, Y.、Xu, X.、Zhao, X.、Yeung, J. H. Y.、Ye, F.(2012)。Supply chain coordination with controllable lead time and asymmetric information。European Journal of Operational Research,217(1),108-119。  new window
12.Ouyang, Liang-yuh、Chuang, Bor-ren、Lin, Yu-jen(20070900)。The Inter-Dependent Reductions of Lead Time and Ordering Cost in Periodic Review Inventory Model with Backorder Price Discount。International Journal of Information and Management Sciences,18(3),195-208。new window  new window
13.Vijayashree, M.、Uthayakumar, R.(2015)。Integrated inventory model with controllable lead time involving investment for quality improvement in supply chain system。International Journal of Supply and Operations Management,2(1),617-639。  new window
14.Vijayashree, M.、Uthayakumar, R.(2016)。An optimizing integrated inventory model with investment for quality improvement and setup cost reduction。International Journal of Information Technology Control and Automation,6,1-13。  new window
15.Vijayashree, M.、Uthayakumar, R.(2017)。A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time。Journal of Industrial Engineering International,13(3),393-416。  new window
16.Chen, F.、Federgruen, A.、Zheng, Y. S.(2001)。Coordination mechanisms for a distribution system with one supplier and multiple retailers。Management Science,47(5),693-708。  new window
17.Chen, Shan-huo(19850400)。Operations on Fuzzy Numbers with Function Principle。Tamkang Journal of Management Sciences,6(1),13-25。  new window
18.陳山火、謝志勳(19991200)。Graded Mean Integration Representation of Generalized Fuzzy Number。模糊系統學刊,5(2),1-7。  延伸查詢new window
19.Chen, Shan Huo、Wang, Shiu Tung、Chang, Shu Man(20051200)。Optimization of Fuzzy Production Inventory Model with Repairable Defective Products Under Crisp or Fuzzy Production Quantity。International Journal of Operations Research,2(2),31-37。new window  new window
20.Goyal, Suresh Kumar(1985)。Economic order quantity under conditions of permissible delay in payments。Journal of the Operational Research Society,36(4),335-338。  new window
21.Jaggi, C. K.、Aggarwal, S. P.(1994)。Credit financing in economic ordering policies of deteriorating items。International Journal of Production Economics,34(2),151-155。  new window
22.Jaggi, C. K.、Goyal, S. K.、Goel, S. K.(2008)。Retailer's optimal replenishment decisions with credit-linked demand under permissible delay in payments。European Journal of Operational Research,190(1),130-135。  new window
23.Liao, C. J.、Shyu, C. H.(1991)。An Analytical Determination of Lead Time with Normal Demand。International Journal of Operations & Production Management,11(9),72-78。  new window
24.Ouyang, L. Y.、Wu, K. S.、Ho, C. H.(2004)。Integrated vendor-€“buyer cooperative models with stochastic demand in controllable lead time。International Journal of Production Economics,92(3),255-266。  new window
25.Pan, J. C.-H.、Yang, J.-S.(2002)。A study of an integrated inventory with controllable lead time。International Journal of Production Research,40(5),1263-1273。  new window
26.Yang, J. S.、Pan, J. C.-H.(2004)。Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment。International Journal of Production Research,42(5),853-863。  new window
27.Cárdenas-Barrón, L. E.(2008)。Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation。Computers & Industrial Engineering,55(4),758-765。  new window
學位論文
1.丘寶平(1999)。前置時間對經濟製造批量策略之研究(碩士論文)。國立臺灣科技大學。  延伸查詢new window
圖書
1.Taha, Hamdy A.(1997)。Operations Research: An Introduction。Prentice Hall。  new window
2.Render, B.(1994)。Quantitative analysis for management。Pearson。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關書籍
 
無相關著作
 
QR Code
QRCODE