| 期刊論文1. | Abara, J.(1989)。Applying Integer Linear Programming to the Fleet Assignment problem。Interfaces,19(4),20-28。 | 2. | Fisher, M. L.(1981)。The lagrangian relaxation method for solving integer programming problems。Management Science,27(1),1-18。 | 3. | Jarrah, A. I. Z.、Gang, Y.、Krishnamurthy, N.、Rakshit, A.(1993)。A Decision Support Framework for Airline Flight Cancellations and Delays。Transportation Science,27(3),266-280。 | 4. | Graves, G. W.、McBride, R. D.、Gershkoff, I.、Anderson, D.、Mahidhara, D.(1993)。Flight Crew Scheduling。Management Science,39(6),736-745。 | 5. | Teodorovic, D.、Guberinic, S.(1984)。Optimal dispatching strategy on an airline network after a schedule perturbation。European Journal of Operational Research,15(2),178-182。 | 6. | Arabeyre, J. P.、Fearnley, J.、Steiger, F. C.、Teather, W.(1969)。The airline crew scheduling problem: a survey。Transportation Science,3(2),140-163。 | 7. | 顏上堯、楊大輝(19941200)。航空運具故障時系統性飛航排程。運輸計劃,23(4),407-426。 延伸查詢 | 8. | Teodorovic, D.、Stojkovic, G.(1990)。Model for Operational Daily Airline Scheduling。Transportation Planning and Technology,14,273-285。 | 9. | Balakrishnan, A.、Chien, T. W.、Wong, R. T.(1990)。Selecting aircraft routes for long-haul operations: a formulation and solution method。Transportation Research Part B,24(1),57-72。 | 10. | Camerini, P. K.、Fratta, L.、Maffioli, F.(1975)。On improving relaxation methods by modified gradient techniques。Mathematical Programming Study,3,6-25。 | 11. | 顏上堯、楊慧華(19950600)。多機種飛航排程與航次規劃。運輸計劃,24(2),195-219。 延伸查詢 | 12. | 顏上堯、何淑萍(19940300)。飛航排程暨班次表之建立。運輸計劃,23(1),73-90。 延伸查詢 | 13. | 汪進財、劉得昌(19940900)。動態班機排程方法。運輸計劃,23(3),327-348。 延伸查詢 | 14. | Teodorovic, D.、Krcmar-Nozic, E.(1989)。Multi Criteria Model to Determine Flight Frequencies on an Airline Network under Competitive Conditions。Transportation Science,23,14-25。 | 15. | Teodorovic, D.(1985)。A Model for Designing the Meteorologically Most Reliable Airline Schedule。European Journal of Operational Research,21(2),156-164。 | 16. | Powell, W. B.(1992)。A Review of Sensitivity Results for Linear Networks and a New Approximation to Reduce the Effects of Degeneracy。Transportation Science,26(3),230-245。 | 17. | 顏上堯、Bernstein, David、Sheffi, Yosef(1995)。Intermodal Pricing Using Network Flow Techniques。Transportation Research Part B: Methodological,29(3),171-180。 | 18. | Biro, M.、Simon, I.、Tanczos, C.(1992)。Aircraft and Maintenance Scheduling Support: Mathematical Insights and a Proposed Interactive System。Journal of Advanced Transportation,26(2),121-130。 | 19. | Feo, T. A.、Bard, J. F.(1989)。Flight Scheduling and Maintenance Base Planning。Management Science,35(12),1415-1432。 | 會議論文1. | Konig, P.(1976)。Short Term Aircraft Assignment。Proceedings of The XVI AGIFORS Symposium。Key Biscayne, Florida。 | 2. | Lee, K.、Reno, R.(1978)。Aircraft Maintenance Scheduling。Vancouver, Canada。 | 3. | Mathaisel, D. F. X.(1983)。Fleet Assignment with Variable Demand: A Goal Programming Approach。Olive Branch, Mississippi。 | 4. | Gershkoff, I.(19871000)。Aircraft Shortage Evaluator。ORSA/ TIMS Joint National Meeting。St. Louis, MO。 | 研究報告1. | Simpson, R. W.(1969)。Scheduling and Routing Models for Airline Systems。Flight Transportation Laboratory, M.I.T.。 | 2. | Etschmaier, M. M.、Rothstein, M.(1973)。Estimating the Punctuality Rate Inherent in an Airline Schedule。Department of Industrial Engineering, University of Pittsburgh。 | 3. | Lee, B. C.(1986)。Routing Problem with Service Choices。Massachusetts Institute of Technology。 | 學位論文1. | Jedlinsky, D. C.(1967)。The Effect of Interruptions on Airline Schedule Control(碩士論文)。Massachusetts Institute of Technology。 | 圖書1. | Svanberg, K.、Baathe, O.(1985)。Computational experiments with different subgradient techniques。 | 2. | Teodorovic, D.(1988)。Airline Operations Research。Gordon and Breach Science Publishers。 | 3. | 卞奭年(1984)。民航空運新論。黎明文化事業股份有限公司。 延伸查詢 | 4. | Ahuja, R. K.、Orlin, J. B.、Magnanti, T. L.(1993)。Network Flows: Theory, Algorithms, and Applications。Prentice-Hall。 | 5. | Garey, Michael R.、Johnson, David S.(1979)。Computers and Intractability: A Guide to the theory of NP-Completeness。W. H. Freeman and Company。 | 6. | Deckwitz, T. A.(1984)。Interactive Dynamic Aircraft Scheduling。Massachusetts Institute of Technology。 | 其他1. | 中華航空公司(1993)。八十一年度年報,台北。 延伸查詢 | |