期刊論文1. | Jacobs, F. R.、Bragg, D. J.(1988)。Repetitive Lots: Flow Time Reductions Through Sequencing and Dynamic Batch Sizing。Decision Science Journal,19(2),281-294。 |
2. | Baker, K. R.、Pyke, D. F.(1990)。Solution Procedures for the Lot Streaming Problem。Decision Sciences,21(3),475-491。 |
3. | Reiter, S.(1966)。A system for managing job shop production。Journal of Business,34(2),371-393。 |
4. | Vickson, R. G.、Alfredsson, B. E.(1992)。Two and Three Machine Flow Shop Scheduling Problems with Equal Sized Transfer Batches。International Journal of Production Research,30,1551-1574。 |
5. | Baker, K. R.、Jia, D.(1993)。A comparative study of lot treaming procedures。OMEGA,21,561-566。 |
6. | Cetinkaya, F. C.、Kayaligil, M. S.(1992)。Unit sized transfer batch scheduling with setup times。Computers and Industrial Engineering,22(2),177-183。 |
7. | Cetinkaya, F. C.(1994)。Lot-streaming in a two-stage flow shop with set-up, processing and removal times separated。Journal of Operational Research Society,45,1445-1455。 |
8. | Glass, C. A.、Gupta, J. N. D.、Potts, C. N.(1994)。Lot streaming in three-stage production processes。Journal of Operational Research,75,378-394。 |
9. | Hancock, T. M.(1991)。Effects of lot-splitting under various routing strategies。International Journal of Operations & Production Management,11(1),68-75。 |
10. | Kropp, D. H.、Smunt, T. L.(1988)。Optimal and heuristic models for lot splitting in a flow shop。Decision Sciences,21,691-709。 |
11. | Potts, C. N.、Van Wassenhove, L. N.(1992)。Integrated scheduling with batching and lot-sizing: a review of algorithms and complexity。Journal of Operational Research Society,43,395-406。 |
12. | Stephane, D. P.、Lasserre, J. B.(1993)。An iterative procedure for lot streaming in job-shop scheduling。Computers and Industrial Engineering,25(1),231-234。 |
13. | Trietsch, D.、Baker, K. R.(1993)。Basic techniques for lot streaming。Operations Research,41,1065-1076。 |