:::

詳目顯示

回上一頁
題名:流程型工廠單產品批量流移運批量最佳配置與探索解模式之研究
書刊名:工業工程學刊
作者:邱煥能張仁輝 引用關係
作者(外文):Chiu, Huan-nengChang, Jen-huei
出版日期:1996
卷期:13:4
頁次:頁329-341
主題關鍵詞:批量流處理批移運批流程型工廠探索解模式Lot-streamingProcess batchTransfer batchFlow shopHeuristic model
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(5) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:5
  • 共同引用共同引用:0
  • 點閱點閱:29
期刊論文
1.Jacobs, F. R.、Bragg, D. J.(1988)。Repetitive Lots: Flow Time Reductions Through Sequencing and Dynamic Batch Sizing。Decision Science Journal,19(2),281-294。  new window
2.Baker, K. R.、Pyke, D. F.(1990)。Solution Procedures for the Lot Streaming Problem。Decision Sciences,21(3),475-491。  new window
3.Reiter, S.(1966)。A system for managing job shop production。Journal of Business,34(2),371-393。  new window
4.Vickson, R. G.、Alfredsson, B. E.(1992)。Two and Three Machine Flow Shop Scheduling Problems with Equal Sized Transfer Batches。International Journal of Production Research,30,1551-1574。  new window
5.Baker, K. R.、Jia, D.(1993)。A comparative study of lot treaming procedures。OMEGA,21,561-566。  new window
6.Cetinkaya, F. C.、Kayaligil, M. S.(1992)。Unit sized transfer batch scheduling with setup times。Computers and Industrial Engineering,22(2),177-183。  new window
7.Cetinkaya, F. C.(1994)。Lot-streaming in a two-stage flow shop with set-up, processing and removal times separated。Journal of Operational Research Society,45,1445-1455。  new window
8.Glass, C. A.、Gupta, J. N. D.、Potts, C. N.(1994)。Lot streaming in three-stage production processes。Journal of Operational Research,75,378-394。  new window
9.Hancock, T. M.(1991)。Effects of lot-splitting under various routing strategies。International Journal of Operations & Production Management,11(1),68-75。  new window
10.Kropp, D. H.、Smunt, T. L.(1988)。Optimal and heuristic models for lot splitting in a flow shop。Decision Sciences,21,691-709。  new window
11.Potts, C. N.、Van Wassenhove, L. N.(1992)。Integrated scheduling with batching and lot-sizing: a review of algorithms and complexity。Journal of Operational Research Society,43,395-406。  new window
12.Stephane, D. P.、Lasserre, J. B.(1993)。An iterative procedure for lot streaming in job-shop scheduling。Computers and Industrial Engineering,25(1),231-234。  new window
13.Trietsch, D.、Baker, K. R.(1993)。Basic techniques for lot streaming。Operations Research,41,1065-1076。  new window
研究報告
1.Baker, K. R.(1988)。Lot streaming to reduce cycle time in a flow shop。Hanover, N. H.:The Amos Tuck School of Business Administration, Dartmouth College。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE