The planning of building construction is affected by a number of factors, the number of considerations multiply and the complexity of relationships increase. None of existing methods allows for the simultaneous consideration of the construction management within the limits and goals set by resources of a building project. The main purpose of this study is to formulate a model which combines the techniques of CPM and goal programming. To this end theoretical framework of construction is examined. This is followed by the formulation of a model. The calibration runs and the results of the sample testing.