| 期刊論文1. | Parunak, H. V. D.(1991)。Characterizing the Manufacturing Scheduling Problem。Journal of Manufacturing Systems,10,241-259。 | 2. | Church, L. K.、Uzsoy, R.(1992)。Analysis of periodic and event-driven rescheduling policies in dynamic shops。International Journal of Computer Integrated Manufacturing,5(3),153-163。 | 3. | Melnyk, S. A.、Vickery, S. K.、Carter, P. L.(1986)。Scheduling, sequencing and dispatching: Alternative perspectives。Production and Inventory Management,27(2),58-67。 | 4. | Muhlemann, A. P.、Lockett, A. G.、Farn, C. K.(1982)。Job shop scheduling heuristics and frequency of scheduling。International Journal Production Research,20(2),227-241。 | 5. | Hastings, N. A. J.、Yeh, C. H.(1990)。Job Oriented Production Scheduling。European Journal of Operational Research,47,35-48。 | 6. | Noronha, S. J.、Sarma, V. V. S.(1991)。Knowledge-Based Approaches for Scheduling Problems: A Survey。IEEE Transactions on Knowledge and Data Engineering,3(2),160-171。 | 7. | Rodammer, F. A.、White, K. P.(1988)。A Recent Survey of Production Scheduling。IEEE Transactions on Systems, Man, and Cybernetics,18(6),841-851。 | 8. | Panwalkar, S. S.、Iskander, W.(1977)。A Survey of Scheduling Rules。Operations Research,25(1),45-61。 | 9. | Blackstone, J. H. Jr.、Phillips, D. T.、Hogg, G. L.(1982)。A State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations。International Journal of Production Research,20(1),27-45。 | 10. | Suresh, V.、Chaudhuri, D.(1993)。Dynamic scheduling: A survey of research。International Journal of Production Economics,32,53-63。 | 11. | Montazeri, M.、Van Wassenhove, L. N.(1990)。Analysis of Scheduling Rules for an FMS。International Journal of Production Research,28(4),785-802。 | 12. | Christy, D. P.、Kanet, J. J.(1988)。Open order rescheduling in job shops with demand uncertainty: a simulation study。Decision Sciences,19,801-818。 | 13. | Chandra, J.、Talavage, J.(1991)。Intelligent dispatching for flexible manufacturing。international Journal of Production Research,29,2259-2278。 | 14. | Li, Rong-Kwei、Shyu, Yu-Tang、Adiga, Sadashiv(1993)。A heuristic rescheduling algorithm for computer-based production scheduling systems。International Journal of Production Research,31(8),1815-1826。 | 15. | Wu, H. H.、Li, R. K.(1996)。A methodology for schedule compression。Production Planning and Control,7,407-417。 | 16. | Adam, N. R.、Surkis, J.(1980)。Priority update intervals and anomalies in dynamic ratio job shop scheduling rules。Management Science,26,1227-1237。 | 17. | Adelsberger, H. H.、Kanet, J. J.(1991)。The leitstand: a new tool for computer-integrated manufacturing。Production and Inventory Management Journal,32,43-48。 | 18. | Adiri, I.、Bruno, J.、Frostig, E.、Rinnooy Kan, A. H. G.(1989)。Single machine flow time scheduling with a single breakdown。Acta Informatica,26,679-696。 | 19. | Ahluwalia, R. S.、Ji, P.(1991)。A distributed approach to job scheduling in a flexible manufacturing system。Computers & Industrial Engineering,20(1),95-103。 | 20. | Baker, K. R.(1977)。An experimental study of the effectiveness of rolling schedules in production planning。Decision Science,8,19-28。 | 21. | Baker, K. R.、Petersen, D. W.(1979)。An analytic framework for evaluating rolling schedules。Management Science,25,341-351。 | 22. | Baptiste, P.、Favrel, J.(1993)。Taking into account the rescheduling problem during the scheduling phase。Production Planning & Control,4,349-360。 | 23. | Bean, J. C.、Birge, J. R.、Mittenthal, J.、Noon, C. E.(1991)。Matchup scheduling with multiple resources, release dates and disruptions。Operations Research,39,470-483。 | 24. | Bensana, E.、Bel, G.、Dubois, D.(1988)。OPAL: A multi-knowledge-based system for industrial job-shop scheduling。International Journal of Production Research,26,795-819。 | 25. | Bharadwaj, A.、Vinze, A. S.、Sen, A.(1994)。Blackboard architecture for reactive scheduling。Expert Systems With Applications,7,55-65。 | 26. | Bona, B.、Brandimarte, P.、Greco, C.、Menga, G.(1990)。Hybrid hierarchical scheduling and control systems in manufacturing。IEEE Transactions on Robotics and Automation,6,673-686。 | 27. | Chang, S. C.、Liao, D. Y.(1994)。Scheduling flexible flow shops with no setup effects。IEEE Transactions on Robotics and Automation,10,112-122。 | 28. | Cho, H.、Wysk, R. A.(1993)。A robust adaptive scheduler for an intelligent workstation controller。International Journal of Production Research,31,771-789。 | 29. | Dar-EI, E. M.、Wysk, R. A.(1982)。Job shop scheduling: a systematic approach。Journal of Manufacturing Systems,1(1),77-88。 | 30. | Doulgeri, Z.、D'alessandro, G.、Magaletti, N.(1993)。A hierarchical knowledge-based scheduling and control for FMSs。International Journal of Computer Integrated Manufacturing,6,191-200。 | 31. | Eddy, J. L.(1993)。AHP Leitstand: Graphically links inventory planning and shop floor control。APICS: The Performance Advantage,4,42-45。 | 32. | Farhoodi, F.(1990)。A knowledge-based approach to dynamic job-shop scheduling。International Journal of Computer Integrated Manufacturing,3,84-95。 | 33. | Farn, C. K.、Muhlemann, A. P.(1979)。The dynamic aspects of a production scheduling problem。International Journal of Production Research,17,15-21。 | 34. | Fox, M. S.、Smith, S. F.(1984)。ISIS: a knowledge-based system for factory scheduling。Expert Systems,1,25-49。 | 35. | Gershwin, Stanley B.、Hilderbrant, R. B.、Suri, R.、Mitter, S. K.(1986)。A control perspective on recent trends in manufacturing systems。IEEE Control Systems,3,3-15。 | 36. | Graves, Stephen C.(1981)。A review of production scheduling。Operations Research,29(4),646-675。 | 37. | Hariri, A. M. A.、Potts, C. N.(1991)。Heuristics for scheduling unrelated parallel machines。Computers and Operations Research,18,323-331。 | 38. | Hayner, A. M.(1989)。Shop floor scheduling: making it work。Manufacturing Engineering,68,65-67。 | 39. | Huang, Y. G.、Kanal, L.、Tripathi, S. K.(1990)。Reactive scheduling for a single machine: problem definition。Computer Integrated Manufacturing,3,6-12。 | 40. | Jackson, S.、Browne, J.(1989)。An interactive scheduler for production activity control。International Journal of Computer Integrated Manufacturing,2,2-14。 | 41. | Kanet, J. J.、Sridharan, V.(1990)。The electronic leitstand: a new tool for shop scheduling。Manufacturing Review,3,161-170。 | 42. | Kiran, A. S.、Smith, M. L.(1984)。Simulation studies in job shop scheduling--I: a survey。Computer and Industrial Engineering,8,87-93。 | 43. | Kiran, A. S.、Smith, M. L.(1984)。Simulation studies in job shop scheduling--II: performance of priority rules。Computer and industrial Engineering,8,95-105。 | 44. | Kohler, C.(1993)。New technological and organizational solutions to shopfloor control。Computer Integrated Manufacturing Systems,6,44-52。 | 45. | Leon, V. J.、Wu, S. D.、Storer, R. H.(1994)。A game-theoretic control approach for job shops in the presence of disruptions。International Journal of Production Research,32,1451-1476。 | 46. | Raman, N.、Talbot, F. B.、Rachamadugu, R. V.(1989)。Due date based scheduling in a general flexible manufacturing system。Journal of Operations Management,8,115-132。 | 47. | Raman, N.、Rachamadugu, R. V.、Talbot. F. B.(1989)。Real-time scheduling of an automated manufacturing center。European Journal of Operational research,40,222-242。 | 48. | Roundy, R. O.、Maxwell, W. L.、Herer, Y. T.、Tayur, S. R.、Getzler, A. W.(1991)。A priced-directed approach to real-time scheduling of production operations。IIE Transactions,23,149-160。 | 49. | Smith, S. F.、Ow, P. S.、Potvin, J. Y.、Muscettola, N.、Matthys, D. C.(1990)。An integrated framework for generating and revising factory schedules。Journal of the Operational Research Society,41,539-552。 | 50. | Sun, D.、Lin, L.(1994)。A dynamic job shop scheduling framework: a backward approach。International Journal of Production Research,32,867-985。 | 51. | Wilhelm, W. E.、SOM, P.、Carroll, B.(1992)。A model for implementing a paradigm of time-managed, material flow control in certain assembly systems。International Journal of Production Research,30,2063-2086。 | 52. | Wu, H. H.、Li, R. K.(1995)。A new rescheduling method for computer based scheduling systems。International journal of Production Research,33,2097-2110。 | 53. | Wu, S. D.、Storer, R. H.、Chang, P. C.(1993)。One-machine rescheduling heuristics with efficiency and stability as criteria。Computers and Operations Research,20,1-14。 | 54. | Yamamoto, M.、Nof, S. Y.(1985)。Scheduling/rescheduling in the manufacturing operating environment。International Journal of Production Research,23,705-722。 | 會議論文1. | Bean, J. C.、Birge, J. R.(1985)。Match-up real-time scheduling。The Real-Time Scheduling Conference。Washington, D.C.:National Bureau of Standards。197-212。 | 2. | Grant, H. F.、Nof, S. Y.(1989)。Automatic adaptive schedling of multiprocessor cells。The 10th ICPR。University of Nottingham。174-175。 | 3. | Jordan, P.、Browne, J.、Browne, M.(1994)。Production activity control for small manufacturing enterprises。The IFIP TC5/WG5,(會議日期: 1993/10/01)。Athens, Greece。29-38。 | 學位論文1. | 吳鴻輝(1995)。淨變式重排程方法之設計與應用(博士論文)。國立交通大學。 延伸查詢 | 圖書1. | Baker, K. R.(1974)。Introduction to Sequencing and Scheduling。New York, NY:John Wiley & Sons。 | 2. | Conway, R. W.、Maxwell, W. L.、Miller, L. W.(1967)。Theory of Scheduling。Reading, MA:Addison Wesley Publishing。 | 3. | Bauer, A.、Bowden, R.、Browne, J.、Lyons, G.(1991)。Shop Floor Control Systems。London:Chapman and Hall。 | 4. | FACTOR(1990)。User Guide Version 4.0 Output Analysis。Indianapolis:Printsker Corp。 | 5. | Vollmann, T. E.、Berry, W. L.、Whybark, D. C.(1992)。Manufacturing Planning and Control Systems。IRWIN。 | 圖書論文1. | Ruiz-Diaz, F.、French, S.(1983)。A survey of multi-objective combinatorial scheduling。Multi-Objective Decision Making。Academic Press。 | |