:::

詳目顯示

回上一頁
題名:人機互動式排程系統之研究
書刊名:工業工程學刊
作者:郭文宏黃雪玲
作者(外文):Kuo, W. H.Hwang, S. L.
出版日期:1998
卷期:15:6
頁次:頁533-543
主題關鍵詞:人機互動排程系統平行機臺Human-computer interactionScheduling systemParallel machines
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:6
  • 點閱點閱:28
期刊論文
1.吳鴻輝、李榮貴(19970400)。生產排程之重排程決策問題的文獻探討與分析。工業工程學刊,14(2),147-158。new window  延伸查詢new window
2.Flynn, B. B.(1987)。Repetitive lots: the use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops。Journal of Operations Management,7,203-216。  new window
3.Ovacik, I. M.、Uzsoy, R.(1993)。Worst-case error bounds for parallel machine scheduling problems with bounded sequence-dependent setup times。Operations Research Letters,14,251-256。  new window
4.Wilbrecht, J. K.、Prescott(1969)。The Influence of Setup Time on Job Shop Performance。Management Science,16,B274-B280。  new window
5.Wu, S. D.、Wysk, R. A.(1989)。An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing。International Journal of Production Research,27(9),1603-1623。  new window
6.Bi, S.、Salvendy, G.(1994)。Analytical modeling and experimental study of human workload in scheduling of advanced manufacturing systems。International Journal of Human Factors in Manufacturing,4,205-234。  new window
7.Boccalatte, A.、Paolucci, M.、Prefumo, R.、Pesenti, R.(1995)。KCS: a hybrid approach to short-term scheduling in a manufacturing environment。International Journal of Industrial Engineering,2,145-154。  new window
8.Chryssolouris, G.、Wright, K.、Pierce, J.、Cobb, W.(1988)。Manufacturing systems operation: dispatch rules versus intelligent control。Robotics and Computer-Integrated Manufacturing,4,531-544。  new window
9.Chryssolouris, G.、Dick, K.、Lee, M.(1991)。An approach to short interval scheduling for discrete parts manufacturing。International Journal of Computer Integrated Manufacturing,4,157-168。  new window
10.Chryssolouris, G.、Pierce, J. E.、Dicke, K.(1992)。A decision-making approach to the operation of flexible manufacturing systems。The International Journal of Flexible Manufacturing Systems,3,309-330。  new window
11.Corbett, J. M.(1996)。The development of user-centered advanced manufacturing technology: new design practice or new marketing rhetoric?。The International Journal of Human Factors in Manufacturing,6,79-87。  new window
12.Godin, V. B.(1978)。Interactive scheduling: historical survey and state of the art。AIIE Transactions,10,331-337。  new window
13.Gupta, Y. P.、Gupta, M. C.、Bector, C. R.(1994)。A review of scheduling rules in flexible manufacturing systems。International Journal of computer Integrated Manufacturing,2,356-377。  new window
14.Haider, S. W.、Moodie, C. L.、Buck, J. B.(1981)。An investigation of the advantages of using a man-computer interactive scheduling methodology for job shops。International Journal of Production Research,19,381-392。  new window
15.Kim, M. H.、Kim, Y. D.(1994)。Simulation-based real-time scheduling in a flexible manufacturing system。Journal of Manufacturing Systems,13,85-93。  new window
16.Mukhopadhyay, S. K.、Maiti, B.、Garg, S.(1991)。Heuristic solution to the scheduling problems in flexible manufacturing system。International Journal of Production Research,29,2003-2024。  new window
17.Christine, M. M.、Patrica, M. J.(1995)。Human-computer cooperative problem solving: theory, design, and evaluation of an intelligent associate system。IEEE Transactions on Systems, Man, And Cybernetics,25,1039-1053。  new window
18.Rogers, B. P.、Flanagan, M. T.(1991)。On-line simulation for real-time scheduling of manufacturing systems。Industrial Engineering,23,37-40。  new window
19.Samadi, B.、Morris, R. J. T.、Rubin, L. D.、Wong, W. S.、Ekroot, B. C.(1990)。The operations assistant: a new manufacturing resource management tool。Journal of Manufacturing Systems,9,303-314。  new window
20.Sanderson, P. M.、Moray, N.(1990)。The human factors of scheduling behavior。Ergonomics of Hybrid Automated Systems II,399-406。  new window
21.Walden, R. S.、Rouse, W. B.(1978)。A queueing model of pilot decision making in a multi-task flight management situation。IEEE Transactions on Systems, Man, And Cybernetics,8,867-875。  new window
會議論文
1.林則孟、黃聖智(1996)。遺傳演算法在半導體晶圓偵測區排程問題之應用。沒有紀錄。685-692。  延伸查詢new window
2.Harmonsky, C. M.(1990)。Implementation issues using simulation for real-time scheduling, control, and monitoring。沒有紀錄。595-598。  new window
3.Jain, S.、Barber, K.、Osterfeld, D.(1989)。Expert simulation for on-line scheduling。沒有紀錄。930-935。  new window
4.Krishnamurthi, M.、Vasudevan, S.(1993)。Domain-based on-line simulation for real-time decision support。沒有紀錄。1304-1312。  new window
5.Kusiak, A.(1989)。KBSS: a knowledge and optimization based system for manufacturing scheduling。沒有紀錄。694-699。  new window
6.郭文宏、黃雪玲(1996)。An Interface Design of Real-time Scheduling Support System。沒有紀錄。171-174。  延伸查詢new window
7.Lin, J. T.、Huang, S. C.(1995)。A computer aided scheduler for wafer probe center in semiconductor manufacturing。Taiwan。  new window
8.Marriott, B.(1994)。Production scheduling systems using PRO-VISA。沒有紀錄。522-526。  new window
9.Moreno, A. A.、Ding, F.(1989)。Goal oriented heuristics for the FMS loading (and part type selection) problems。沒有紀錄。105-110。  new window
圖書
1.Garey, Michael R.、Johnson, David S.(1979)。Computers and Intractability: A Guide to the theory of NP-Completeness。W. H. Freeman and Company。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE