:::

詳目顯示

回上一頁
題名:以限制理論為基礎之晶圓製造廠派工法則
書刊名:工業工程學刊
作者:張盛鴻 引用關係馮鈺敏杜瑩美黃承龍 引用關係李榮貴 引用關係
作者(外文):Chang, Sheng-hungFeng, Yun-minTu, Ying-meiHuang, Chen-lungLi, Rong-kwei
出版日期:1999
卷期:16:2
頁次:頁209-220
主題關鍵詞:晶圓製造派工法則限制理論瓶頸機臺Wafer fabricationDispatching ruleTheory of constraintsBottleneck station
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(3) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:2
  • 共同引用共同引用:0
  • 點閱點閱:21
期刊論文
1.Uzsoy, R.、Lee, C. Y.、Martin-Vega, L. A.(1994)。A Review of Production Planning and Scheduling Models in the Semiconductor Industry Part II: Shop-Floor Control。IIE Transactions,26(5),44-55。  new window
2.Glassey, C. R.、Resende, M. G. C.(1988)。Closed-loop Job Release Control for VLSI Circuit Manufacturing。IEEE Transactions on Semiconductor Manufacturing,1(1),36-46。  new window
3.Li, Shu、Tang, Tom、Collins, Donald W.(1996)。Minimum Inventory Schedule With Application in Semiconductor Fabrication。IEEE Transactions on Semiconductor Manufacturing,9(1),145-149。  new window
4.Lozinski, Christopher、Glassey, C. Roger(1988)。Bottleneck Starvation for Shop Floor Control。IEEE Transactions on Semiconductor Manufacturing,1(4),147-153。  new window
5.Lu, Steve C. H.、Ramaswamy, Deepa、Kumar, P. R.(1994)。Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in Semiconductor Manufacturing Plants。IEEE Transactions on Semiconductor Manufacturing,7(3),374-388。  new window
6.Neuts, M. F.(1967)。A General Class of Bulk Queues with Poisson Input。Annuals Mathematical Statistics,38(3),759-770。  new window
7.Bailey, N. T. J.(1954)。On Queuing Processes with Bulk Service。J. R. Stat. Soc. B,16,80-87。  new window
8.Deb, R. K.、Serfozo, R. F.(1973)。Optimal Control of Batch Service Queues。Advances in Applied Probability,2(5),340-361。  new window
9.Fowler, John W.、Philips, Don T.、Hogg, Gary L.(1992)。Real-Time Control of Multiproduct Bulk-Service Semiconductor Manufacturing Processes。IEEE Transactions on Semiconductor Manufacturing,5(2),158-163。  new window
10.Glassey, C. Roger、Weng, W. Willie(1991)。Dynamic Batching Heuristic for Simultaneous Processing。IEEE Transactions on Semiconductor Manufacturing,4(2),77-82。  new window
11.Johri, Pravin K.(1994)。Practical issues in Scheduling and Dispatching in Semiconductor Wafer Fabrication。Journal of Manufacturing Systems,12(6),474-485。  new window
12.Kumar, P. R.(1994)。Scheduling Semiconductor Manufacturing Plants。IEEE Control Systems,33-40。  new window
會議論文
1.Raviv, Amnon(1995)。Applications of Queuing Theory and Simulation to Staffing in the Semiconductor Clean Room Environment。沒有紀錄。252-256。  new window
圖書
1.Goldratt, E. M.(1990)。The Haystack Syndrome: Sifting Information Out of the Data Ocean。Croton-on-Hudson, New York:North River Press。  new window
2.Srikanth, M. L.、Podzunas, A. E.(1990)。Synchronous Manufacturing: Principles for World Class Excellence。Synchronous Manufacturing: Principles for World Class Excellence。Cincinnati, OH:South-Western Publishing Co.。  new window
3.Goldratt, E. M.、Fox, R. E.(1986)。The Race。Croton-on-Hudson, NY。  new window
4.Goldratt, E. M.(1990)。What Is This Thing Called Theory of Constraints and How Should It Be Implemented?。North River Press。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
QR Code
QRCODE