:::

詳目顯示

回上一頁
題名:禁忌搜尋法在彈性零工型製造系統排程之探討
書刊名:工業工程學刊
作者:駱景堯 引用關係
作者(外文):Low, Chinyao
出版日期:1999
卷期:16:5
頁次:頁605-615
主題關鍵詞:排程彈性零工型工廠多製程規劃平均延遲時間禁忌搜尋法Flexible job shop schedulingTabu search
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(1) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:1
  • 共同引用共同引用:0
  • 點閱點閱:32
期刊論文
1.Widmer, M.、Hertz, A.(1989)。A New Heuristic Method for the Flow Shop Sequencing Problem。European Journal of Operational Research,41,186-193。  new window
2.Laarhoven, P. V.、Lenstra, J.、Arts, E.(1992)。Job shop scheduling by simulated annealing。Operations Research,40(1),113-125。  new window
3.Hutchison, J.、Leong, K.、Snyder, D.、Ward, P.(1991)。Scheduling approaches for random job shop flexible manufacturing systems。International Journal of Production Research,29(5),1053-1067。  new window
4.Hisao, Ishibuchi、Murata, Tadahiko(1994)。Performance Evaluation of Genetic Algorithms for Flow Shop Scheduling Problems。IEEE Transaction on Engineering Management,22(2),812-817。  new window
5.Dell'Amico, M.、Trubian, M.(1993)。Applying tabu search to the job shop scheduling problem。Annals of Operational Research,41(2),231-252。  new window
6.Adams, J.、Balas, E.、Zawack, D.(1988)。The Shifting Bottleneck Procedure for Job Shop Scheduling。Management Science,34(3),391-401。  new window
7.Blazewicz, Jacek、Domschke, Wolfgang、Pesch, Erwin(1996)。The job shop scheduling problem: convention and new solution techniques。European Journal of Operational Research,93,1-33。  new window
8.陳春龍、Vempati, Venkateswara S.、Nasser, Aljaber(1995)。An Application of Genetic Algorithms for Flow Shop Problems。European Journal of Operational Research,80,389-396。  new window
9.Raghu, T. S.、Rajendran, C.(1995)。Due-date setting methodologies based on simulated annealing - an experimental study in a real-life job shop。International Journal of Production Research,33(9),2535-2554。  new window
10.Sawik, Tadeusz(1990)。Modeling and Scheduling of Flexible Manufacturing System。European Journal of Operational Research,45,177-190。  new window
11.葉靜怡、溫于平(1997)。以塔布搜尋法求解流程式工場排序問題。中國工程學刊,20(4),465-470。  延伸查詢new window
12.Rajendran, C.、Sridhar, J.(1993)。Scheduling in a cellular manufacturing system: a simulated annealing approach。International Journal of Production Research,31(12),2927-2945。  new window
13.Lee, T. E.、Song, Ju-Seog(1996)。A tabu search procedure for periodic job shop scheduling。Computers Industrial Engineering,30(3),433-447。  new window
14.Lourenco, H. R.(1995)。Job-shop scheduling: computational study of local search and large-step optimization methods。European Journal of Operational Research,83,347-364。  new window
15.Ram, D. J.、Ganeshan, K.、Krishan, K.(1995)。Distributed simulated annealing algorithm for job shop scheduling。IEEE Transaction on Systems, Man and Cybernetics,25(7),1102-1109。  new window
16.Liang, M. Z.、Kolahan, F. M.(1995)。Solving the combined part sequencing and tool replacement center: a tabu search approach。Computers Industrial Engineering,28(4),731-743。  new window
17.Hong, R.、Hou, Edwin S. H.、Nirwan, A.(1994)。A Genetic Algorithms for Multiprocessor Scheduling。IEEE Transaction on Parallel and Distributed System,15(2),113-120。  new window
18.Chambers, J. B.、Barnes, J. W.(1995)。Solving the job shop scheduling problems with tabu search。IIE Transactions,27(2),257-263。  new window
19.Laguna, M.、Barnes, J. W.(1993)。Solving the multiple machine weighted flow time problem using tabu search。IIE Transactions,25(2),121-128。  new window
20.Anderson, E. J.、Nyirenda, J. C.(1990)。Two new rules to minimize tardiness in a job shop。International Journal of Production Research,28(12),2277-2292。  new window
會議論文
1.Engell, S.、Moser, M.(1992)。A survey of priority rules for FMS scheduling and their performance for the benchmark problem。沒有紀錄。392-397。  new window
圖書
1.Glover, F.、Laguna, M.(1997)。Tabu Search。Kluwer Academic Publishers。  new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top
:::
無相關博士論文
 
無相關書籍
 
無相關著作
 
無相關點閱
 
QR Code
QRCODE