:::

詳目顯示

回上一頁
題名:爵士鼓製造廠之瓶頸優先指派模式研究
書刊名:創新與經營管理學刊
作者:吳鴻輝鄧肖琳李明峰
作者(外文):Wu, Horng-hueiTeng, Hsiao-linLi, Ming-feng
出版日期:2020
卷期:9:1
頁次:頁35-50
主題關鍵詞:爵士鼓工廠雙重資源限制系統瓶頸優先指派前瞻式瓶頸優先指派限制理論Drum set manufacturingDual resource constrained systemDRC systemBottleneck first ruleLook-ahead bottleneck first ruleTheory of constraintsTOC
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:11
期刊論文
1.Bobrowski, P. M.、Park, P. S.(1993)。An evaluation for labor assignment rules when workers are not perfectly interchangeable。Journal of Operations Management,3,257-268。  new window
2.Rajendran, Chandrasekharan、Alicke, Knut(2007)。Dispatching in flow shops with bottleneck machines。Computers & Industrial Engineering,52(1),89-106。  new window
3.Gunther, R. E.(1979)。Server transfer delays in a dual resource constrained parallel queuing system。Management Science,12,1245-1257。  new window
4.Gunther, R. E.(1981)。Dual-resource parallel queues with server transfer and information access delays。Decision Sciences,12,97-111。  new window
5.Kher, H. V.(2000)。Examination of worker assignment and dispatching rules for managing vital customer priorities in dual resource constrained job shop environments。Computers and Operations Research,27,525-537。  new window
6.Koo, Pyung-Hoi、Jang, Jaejin、Suh, Jungdae(2005)。Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first。International Journal of Flexible Manufacturing Systems,17(1),23-38。  new window
7.Weeks, J. K.、Fryer, J. S.(1976)。A simulation study of operation policies in a hypothetical dual-constrained job shop。Management Science,12,1362-1371。  new window
8.Wedel, Michael、Noessler, Philipp、Metternich, Joachim(2016)。Development of bottleneck detection methods allowing for an effective fault repair prioritization in machining lines of the automobile industry。Production Engineering,10,329-336。  new window
9.Thürer, Matthias、Zhang, Haiwen、Stevenson, Mark、Costa, Federica、Ma, Lin(2019)。Worker assignment in dual resource constrained assembly job shops with worker heterogeneity: an assessment by simulation。International J. Production research。  new window
會議論文
1.Hadgaonkar, Aishwarya、Sapkal, Sagar、Arora, Aman(2020)。Downtime Reduction of End of Line Pump Testing Machine。International Conference in Mechanical and Energy Technology,145-156。  new window
圖書
1.Goldratt, E. M.(1990)。Theory of Constraints。North River Press。  new window
2.Goldratt, E. M.、Robert, E. F.(1986)。The Race。North River Press, Inc.。  new window
3.吳鴻輝、李榮貴(2001)。限制驅導式現場排程與管理技術。全華書局。  延伸查詢new window
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top