1. Chen, M.S. & Lan, C.H. (2001a), Dynamic Production Plan of Probabilistic Market Demand and Fixed Selling Time with Unreliable Machines and Obtainable Working Hour Capacity, Journal of the Operations Research Society of Japan, Vol. 44, No. 1, pp. 57-66.
2. Chen, M.S. & Lan, C.H. (2001b), Two-stage Production with Unreliable Machine and Finite Working Hour Capacity, International Journal of Information and Management Sciences, Vol. 12, No. 2, pp.11-24.
3. Chen, M.S. & Chu, M.C. (2003), The Analysis of Optimal Control in Matching Problem Between Manufacturing and Marketing, European Journal of Operational Research, Vol. 150, pp.293-303.
4. Chiang, A. (1992), Dynamic optimization, McGraw-Hill, Inc., Singapore.
5. Feichtinger, G. & Harth, R. (1985), Optimal Pricing and Production in An Inventory Model, European Journal of Operational Research, Vol. 19, pp. 45-56.
6. Flatto, L. (1979), Advanced Calculus, Second printing, Mei Ya Publications, Inc. Taipei, Taiwan.
7. Friedman, A. (1983), Advanced Calculus, Fifth printing, Mei Ya Publications, Inc. Taipei, Taiwan.
8. Grubbstrom, R.W. & Wang, Z. (2003), A Stochastic Model of Multi-Level/ Multi-Stage Capacity Constrained Production-Inventory Systems, International Journal of Production Economics, Vol. 81, pp. 483-494.
9. Horiguchi, K., Raghavan, N., Uzsoy, R. & Venkateswaran, S. (2001), Finite Capacity Production Planning Algorithms for a Semiconductor wafer fabrication facility, International Journal of Production Research, Vol. 39, pp. 825-842.
10. Kamien, M.I. & Schwartz, N.L. (1991), Dynamic Optimization: The Calculus of Variations and Optimal Control in Economics and Management, Second Edition, Elsevier, North Holland.
11. Soroush, H. (1999), Sequencing and due-date determination in the Stochastic single machine problem with earliness and tardiness costs, European Journal of Operational Research, Vol. 113, pp. 450-468.
12. Sox, C. & Muckstadt, J. (1997), Optimization-based Planning for the Stochastic Lot-scheduling Problem, IIE Transactions, Vol. 29, pp. 349-357.
13. Wu, M.C. & Chen, S.Y. (1996), Cost model for justifying the acceptance of rush orders, International Journal of Production Research, Vol. 34, No. 7, pp. 1963-1974.