|
[1]Abdel-Hameed, M. S., “An imperfect maintenance model with block replacement,” Applied Stochastic Models and Data Analysis, Vol.3, pp.63-72 (1987). [2]Abdel-Hameed, M. S. and F. Proschan, “Non Stationary shock models,” Stochastic Processes and their Application, Vol.1, pp.383-404 (1973). [3]Bai, D. S. and W. Y. Yun, “An age replacement policy with minimal repair cost limit,” IEEE Transactions on Reliability, Vol.R-35, pp.452-454 (1986). [4]Barlow, R. E. and L. C. Hunter, “Optimal preventive maintenance policies,” Operations Research, Vol.8, pp.90-100 (1960). [5]Beichelt, F., “A general preventive maintenance policy,” Mathematische Operations Forschung und Statistik, Vol.7, no.6, pp.927-932 (1976). [6]Beichelt, F., “A replacement policy based on limits for repair cost rate,” IEEE Transactions on Reliability, Vol.R31, pp.401-403 (1982). [7]Beichelt, F., “A unifying treatment of replacement policies with minimal repair,” Naval Research Logistics, Vol.40, pp.51-67 (1993). [8]Beichelt, F., “A replacement policy based on limiting the cumulative maintenance cost,” International Journal of Quality and Reliability Management, Vol.18, pp.76-83 (2001). [9]Beichelt, F. and K. Fisher, “On a basic equation of reliability theory,” Microelectrons and Reliability, Vol.19, pp.367-369 (1979). [10]Berg, M., M. Bievenu, and R. Cléroux, “Age replacement policy with age-dependent minimal repair,” INFOR, Vol.24, pp.26-32 (1986). [11]Berg, M. and R. Cléroux, “A marginal cost analysis for an age replacement policy with minimal repair,” INFOR, Vol.20, pp.258-263 (1982). [12]Block, H. W., W. S. Borges and T. H. Savits, “Age dependent minimal repair,” Journal of Applied Probability, Vol.22, pp.370-385 (1985). [13]Block, H. W., W. S. Borges and T. H. Savits, “A general age replacement model with minimal,” Naval Research Logistics, Vol.35, pp.365-372 (1988). [14]Boland, P. J., “Periodic replacement when minimal repair costs vary with time,” Naval Research Logistics Quarterly, Vol.29, pp.541-546 (1982). [15]Boland, P. J. and F. Proschan, “Periodic replacement with increasing minimal repair costs at failure,” Operations Research, Vol.30, pp.1183-1189 (1982). [16]Boland, P. J. and F. Proschan, “Optimum replacement of a system subject to shocks,” Operations Research, Vol.31, pp.697-704 (1983). [17]Brown, M. and F. Proschan, “Imperfect repair,” Journal of Applied Probability, Vol.20, pp.851-859 (1983). [18]Chung, K. J. and S. D. Lin, “A simple procedure to compute the optimal repair cost under minimal repair,” International Journal of Quality and Reliability Management, Vol.13, pp.77-81 (1996). [19]Cléroux, R., S. Dubuc and C. Tilquin, “The age replacement problem with minimal repair and random repair costs,” Operations Research, Vol.27, pp.1158-1167 (1979). [20]Dohi, T., N. Kaio and O. Osaki, “A graphical method to repair-cost limit replacement policies with imperfect repair,” Mathematical and Computer Modeling, Vol.31, pp.99-106 (2000). [21]Dohi, T., N. Kaio and O. Osaki, “A new graphical method to estimate the repair-time limit with incomplete repair and discounting,” Computers and Mathematics with Application, Vol.46, pp.999-1007 (2003). [22]Drinkwater, R. W. and N. A. J. Hastings, “A economic replacement model,” Operational Research Quarterly, Vol.18, pp.121-138 (1967). [23]Esary, J. D., A. W. Marshall and F. Proschan, “Shock models and wear process,” The Annals of Probability, Vol.1, pp.627-649 (1973). [24]Hastings, N. A. J., “The repair limit replacement method,” Operational Research Quarterly, Vol.20, pp.337-349 (1969). [25]Kapur, P. K., R. B. Garg and N. L. Butani, “Some replacement policies with minimal repairs and repair cost limit,” International Journal of System Science, Vol.20, pp.267-272 (1987). [26]Kijima, M., “Some results for repairable systems with general repair,” Journal of Applied Probability, Vol.26, pp.89-102 (1989). [27]Kijima, M., Morimura H., and Suzuki Y., “Periodical replacement problem without assuming minimal repair,” European Journal of Operational Research, Vol.69, pp.75-82 (1988). [28]Levitin, G. and A. Lisnianski, “Optimization of imperfect preventive maintenance for multi-state systems,” Reliability Engineering and System Safety, Vol.67, pp.193-203 (2000). [29]Liao, C. J. and W. J. Chen, “Single-machine scheduling with periodic maintenance and nonresumable jobs,” Computers and Operations Research, Vol.30, pp.1335-1347 (2003). [30]Lie, C. H. and Y. H. Chun, “An algorithm for preventive maintenance policy,” IEEE Transactions on Reliability, Vol.35, pp.71-75 (1986). [31]Lin, D., M. J. Zuo and R. C. M. Yam, “General sequential imperfect preventive maintenance models,” International Journal of Reliability, Quality and Safety Engineering, Vol.7, pp.253-266 (2000). [32]Lotka, A. J., “A contribution to the theory of self-renewing aggregates with special reference to industrial replacement,” Annals of Mathematical Statistics, Vol.10, pp.1-25 (1939). [33]Malik, M. A. K., “Reliable preventive maintenance scheduling,” AIIE Transactions, Vol.11, pp.221-228 (1979). [34]Murthy, D. N. P. and D. G. Nguyen, “Optimal age-policy with imperfect preventive maintenance,” IEEE Transactions on Reliability, Vol.30, pp.80-81 (1981). [35]Nakagawa, T., “Optimum policies when preventive maintenance is imperfect,” IEEE Transactions on Reliability, Vol.28, pp.331-332 (1979). [36]Nakagawa, T., “A summary of imperfect preventive maintenance policies with minimal repair,” RAIRO Operations Research, Vol.14, pp.249-255 (1980). [37]Nakagawa, T., “Periodic and sequential preventive maintenance policies,” Journal of Applied Probability, Vol.23, pp.536-542 (1986). [38]Nakagawa, T., “Sequential imperfect preventive maintenance policies,” IEEE Transactions on Reliability, Vol.37, pp.295-298 (1988). [39]Nakagawa, T. and K. Yasui, “Periodic-replacement models with threshold levels,” IEEE Transactions on Reliability, Vol.40, pp.395-397 (1991). [40]Nakagawa, T. and M. Kowada, “Analysis of a system with minimal repair and its application to replacement policy,” European Journal of Operational Research, Vol.12, pp.176-182 (1983). [41]Nakagawa, T. and S. Osaki, “The optimum repair limit replacement policies,” Operational Research Quarterly, Vol.25, pp.311-317 (1974). [42]Nguyen, D. G. and D. N. P. Murthy, “A note on the repair limit replacement policy,” Journal of the Operational Research Society, Vol.31, pp.1103-1104 (1980). [43]Nguyen, D. G. and D. N. P. Murthy, “Optimal preventive maintenance policies for repairable systems,” Operations Research, Vol.29, pp.1181-1194 (1981). [44]Park, K. S., “Cost limit replacement under minimal repair,” Microelectronics and Reliability, Vol.23, pp.347-349 (1979). [45]Park, K. S., “Pseudo dynamic cost limits replacement model under minimal repair,” Microelectronics and Reliability, Vol.25, pp.573-579 (1985). [46]Pham, H. and H. Wang, “Imperfect maintenance,” European Journal of Operational Research, Vol.94, pp.425-438 (1996). [47]Puri, P. S. and H. Singh, “Optimum replacement of a system subject to shocks: A mathematical lemma,” Operations Research, Vol.34, pp.782-789 (1986). [48]Ross, S.M., “Applied probability models with optimization applications,” Holden-Day: San Francisco (1970). [49]Savage, I. R., “Cycling,” Naval Research Logistics, Vol.3, pp.163-175 (1956). [50]Savits, T. H., “Some multivariate distributions period from a non-fatal shock model,” Journal of Applied Probability, Vol.25, pp.383-390 (1988). [51]Seo, J. H. and D. S. Bai, “An optimal maintenance policy for a system under periodic overhaul,” Mathematical and Computer Modelling, Vol.39, pp.373-380 (2004). [52]Sheu, S. H., “A generalized block replacement policy with minimal repair and general random repair costs for a multi-unit system,” Journal of the Operational Research Society, Vol. 42, pp. 331-341 (1991). [53]Sheu, S. H., “Optimal block replacement policy with multiple choice at failure,” Journal of Applied Probability, Vol.29, pp.129-141 (1992). [54]Sheu, S. H., “A modified block replacement policy with two variables general and random minimal repair cost,” Journal of Applied Probability, Vol.33, pp.557-572 (1996). [55]Sheu, S. H., “A generalized age and block replacement of a system subject to shocks,” European Journal of Operational Research, Vol.108, pp.345-362 (1998). [56]Sheu, S. H. and T. H. Chang, “Generalized sequential preventive maintenance policy of a system subject to shocks,” International Journal of Systems Science, Vol.33, pp.267-276 (2002). [57]Sheu, S. H. and W. S. Griffith, “Optimal number of minimal repairs before replacement of a system subject to shocks,” Naval Research Logistics Quarterly, Vol.43, pp.319-333 (1996). [58]Sheu, S. H., W. S. Griffith and T. Nakagawa, “Extended optimal replacement model with random minimal repair costs,” European Journal of Operational Research, Vol.85, pp.636-649 (1995). [59]Sheu, S. H. and C. T. Liou, “A generalized sequential preventive maintenance policy for repairable system with general random repair costs,” International Journal of Systems Science, Vol.26, pp.681-690 (1995). [60]Tilquin, C. and R. Cléroux, “Periodic replacement with minimal repair at failure and general cost function,” Journal of Statistical Computing and Simulation, Vol.4, pp.63-67 (1975). [61]Weiss, G., “On the theory of replacement of machinery with a random failure time,” Naval Research Logistics, Vol.3, pp.279-293 (1956).
|