|
[1]田怡,「我國租賃業企業公關之研究」,碩士論文,銘傳大學公共事務學系,桃園(2005)。 [2]張文亮,「考慮維修門檻值下租賃設備之最佳維修策略」,博士論文,台灣科技大學工業管理系,台北(2007)。 [3]陳清南,「營建機具設備維護策略之探討—以機具租賃業為對象」,碩士論文,台灣科技大學營建工程系,台北(2006)。 [4]蘇錫聰,「以融物代替融資-租賃業務」,玉山雙月刊,第35期(1998)。 [5]Anis, C. and Daoud, A.K., “An optimal inspection strategy for randomly failing equipment”, Reliability Engineering & System Safety 63, 127-131 (1999). [6]Baohe, S., “An optimal inspection and diagnosis policy for a multi-mode system”, Reliability Engineering & System Safety 76, 181-188 (2002). [7]Barlow, R.E. and Hunter, L.C., “Optimum preventive maintenance policies”, Operations Research 8, 90-100, (1960). [8]Berg, M. and Epstein, B., “Comparison of age, block and failure replacement policies”, IEEE Transaction on Reliability 27-1, 25-29 (1978). [9]Biswas, A. and Sarkar, J., “Availability of a system maintained through several imperfect repairs before a replacement or a perfect repair”, Statistics & Probability Letters 50, 105-114 (2000). [10]Blischke, W.R., “Mathematical models for analysis of warranty policies”, Mathematical and Computer Modelling 13 1-16 (1990). [11]Block, H.W., Borges, W.S. and Savits, T. H., “A general age replacement model with minimal repair”, Naval Research Logistics 35, 365-372 (1988). [12]Boland, P.J. and Proschan, F., “Periodic replacement with increasing minimal repair costs at failure”, Operations Research 30, 1183-1189 (1982). [13]Boland, P.J. and El-Neweihi, E., “Expected cost comparisons for inspection and repair policies”, Computers & Operations Research 22, 383-390 (1995). [14]Brown, M. and Proschan, F., “Imperfect repair,” Journal of Applied Probability 20, 851–859 (1983). [15]Cassandras, C.G. and Han, Y., “Optimal inspection policies for a manufacturing station”, European Journal of Operational Research 63, 35-53 (1992). [16]Chan, J.K. and Shaw, L., “Modeling repairable systems with failure rates dependent on age and maintenance”, IEEE Transactions on Reliability 42, 566-570 (1993). [17]Chen, M. and Feldman, R.M., “Optimal replacement policies with minimal repair and age-dependent costs”, European Journal of Operational Research 98, 75-84 (1997). [18]Chen, C.T., Chen, Y.W., and Yuan, J., “On a dynamic preventive maintenance policy for a system under inspection”, Reliability Engineering & System Safety 80, 41-47 (2003). [19]Christer, A.H. and Waller, W.M., “Delay time models of industrial inspection maintenance problems”, Journal of the Operational Research Society 35, 401-406 (1984). [20]Chun, Y.H., “Optimum number of periodic preventive maintenance operations under warranty”, Reliability Engineering and System Safety 37, 223-225 (1992). [21]Chukova, S. and Johnston, M.R., “Two-dimensional warranty repair strategy based on minimal and complete repairs”, Mathematical and Computer Modelling 44, 1133-1143 (2006). [22]Chung, K.J., “An approximation optimal inspection policy”, Microelectronics and Reliability 34, 1485-1488 (1994). [23]Cui, L.R., Loh, H.T. and Xie, M., “Sequential inspection strategy for multiple systems under availability requirement”, European Journal of Operational Research 155, 170-177 (2004). [24]Doyen, L. and Gaudoin, O., “Classes of imperfect repair models based on reduction of failure intensity or virtual age”, Reliability Engineering & System Safety 84, 45-56 (2004). [25]Goel, L.R., Sharma, G.C. and Gupta, P., “Reliability analysis of a system with preventive maintenance, inspection and two types of repair”, Microelectronics and Reliability 26, 429-433 (1986). [26]Gu, H.Y., “Studies on optimum preventive maintenance policies for general repair result”, Reliability Engineering & System Safety 41, 197-201 (1993). [27]Jack, N. and Dagpunar, J.S., “An optimal imperfect maintenance policy over a warranty period”, Microelectronics and Reliability 34, 529-534, (1994). [28]Jack, N. and Schouten, F.V.D., “Optimal repair–replace strategies for a warranted product”, International Journal of Production Economics 67, 95-100 (2000). [29]Jaturonnatee, J., Murthy, D.N.P., and Boondiskulchok, R, “Optimal preventive maintenance of leased equipment with corrective minimal repairs”, European Journal of Operational Research 174, 201-215 (2006). [30]Jayabalan, V. and Chaudhuri, D., “Optimal maintenance and replacement policy for a deteriorating system with increased mean downtime”, Naval Research Logistics 39, 67-78 (1992a). [31]Jayabalan, V. and Chaudhuri, D., “Optimal maintenance-Replacement policy under imperfect maintenance”, Reliability Engineering and System Safety 36(2), 165-169 (1992d). [32]Jayabalan, V. and Chaudhuri, D., “Replacement policies: A near optimal algorithm”, IIE Transactions 27, 784-788 (1995). [33]Kijima, M., Morimura, H. and Suzuki, Y., “Periodical replacement problem without assuming minimal repair”, European Journal of Operational Research 37(2), 194-203 (1988). [34]Kijima, M. and Nakagawa, T., “Accumulative damage shock model with imperfect preventive maintenance”, Naval Research Logistics 38, 145-156 (1991). [35]Kijima, M. and Nakagawa, T., “Replacement policies of a shock model with imperfect preventive maintenance”, European Journal of Operational Research 57, 100-110 (1992). [36]Lee, H.L. and Moinzadeh, K., “A repairable item inventory system with diagnostic and repair service”, European Journal of Operational Research 40, 210-221 (1989). [37]Levitin, G. and Lisnianski, A., “Optimization of imperfect preventive maintenance for multi-state systems”, Reliability Engineering & System Safety 67, 193-203 (2000). [38]Lie, C.H. and Chun, Y.H., “An algorithm for preventive maintenance policy”, IEEE Transactions on Reliability R-35 (1), 71-75 (1986). [39]Lin, D., Zuo, M.J. and Yam, R.C.M., “Sequential imperfect preventive maintenance models with two categories of failure modes”, Naval Research Logistics 48, 172-183 (2001). [40]Makis, V. and Jardine, A.K.S., “Optimal replacement of a system with imperfect repair”, Microelectronics and Reliability 31, 381-388 (1991). [41]Malik, M.A.K., “Reliable preventive maintenance policy”, AIIE Transactions 11(3), 221-228 (1979). [42]Martin, H.H., “Contracting out maintenance and a plan for future research”, Journal of Quality in Maintenance Engineering 3(2), 81-90 (1997). [43]Menipaz, E., “Optimization of stochastic maintenance policies”, European Journal of Operational Research 2, 97-106 (1978). [44]Menipaz, E., “Cost Optimization of Some Stochastic Maintenance Policies”, IEEE Transactions on Reliability R-28, 133-136 (1979). [45]Mohandas, K., Chaudhuri, D. and Rao, B.V.A., “Optimal periodic replacement with inspection and minimal repair for a system which is inoperable during inspection periods”, Microelectronics and Reliability 32, 509-513 (1992). [46]Murthy, D.N.P. and Asgharizadeh, E. “Optimal decision making in a maintenance service operation”, European Journal of Operational Research 116, 259-273 (1999). [47]Murthy, D.N.P. and Nguyen, D.G., “Optimal age policy with imperfect preventive maintenance”, IEE Transactions on Reliability R-30, 80-81 (1981). [48]Murthy, D.N.P. and Yeung, V., “Modelling and Analysis of Maintenance Service Contracts”, Mathematical and Computer Modelling 22(10-12), 219-225 (1995). [49]Nakagawa, T., “Imperfect preventive-maintenance”, Journal of the Operations Research Society of Japan 24, 213-227 (1979). [50]Nakagawa, T., “Replacement models with inspection and preventive maintenance”, Microelectronics and Reliability 20, 427-433 (1980). [51]Nakagawa, T., “A summary of periodic replacement with minimal repair at failure”, Journal of the Operational Research Society of Japan 24(3), 213-227 (1981). [52]Nakagawa, T., and Kowada, M., “Analysis of a system with minimal repair and its application to replacement policy”, European Journal of Operational Research 12, 176-182 (1983). [53]Nakagawa, T., “Periodic and Sequential Preventive Maintenance Policies”, Journal of Applied Probability R-23/2, pp.536-542, (1986). [54]Nakagawa, T., “Sequential imperfect preventive maintenance policies”, IEEE Transactions on Reliability 37(3), 295-298 (1988). [55]Nguyen, D.G. and Murthy, D.N.P., “Optimal reliability allocation for products sold under warranty”, Engineering Optimization 13, 35-45 (1988). [56]Osaki, S. and Nakagawa, T., “A note on age replacement”, IEEE Transactions on Reliability 24-1, 92-94 (1975). [57]Osaki, S., Applied Stochastic System Modeling, Springer, New York (1993). [58]Pham, H. and Wang, H., “Invited review-Imperfect Maintenance”, European Journal of Operational Research 94, 425-438 (1996). [59]Phillips, M.J., “A preventive maintenance plan for a system subject to revealed and unrevealed faults”, Reliability Engineering 2, 221-231 (1981). [60]Pongpech, J. and Murthy, D.N.P., “Optimal periodic preventive maintenance policy for leased equipment”, Reliability Engineering & System Safety 91, 772-777 (2006). [61]Qian, C., Nakamura, S. and Nakagawa, T., “Replacement and minimal repair policies for a cumulative damage model with maintenance”, Computers & Mathematics with Applications 46, 1111-1118 (2003). [62]Scarsini, M. and Shaked, M., “On the value of an item subject to general repair or maintenance”, European Journal of Operational Research 122, 625-637 (2000). [63]Seo, J.H. and Bai, D.S., “An optimal maintenance policy for a system under periodic overhaul”, Mathematical and Computer Modelling 39, 373-380 (2004). [64]Sheu S.H., “Periodic replacement with minimal repair at failure and general random repair cost for a multi-unit system”, Microelectronics and Reliability 31, 1019-1025 (1991). [65]Sheu, S.H. and Liou, C.T., “An age replacement policy with minimal repair and general random repair cost”, Microelectronics and Reliability 32, 1283-1289 (1992). [66]Sheu, S.H., Griffith, W.S. and Nakagawa, T., “Extended optimal replacement model with random minimal repair costs”, European Journal of Operational Research 85, 636-649 (1995). [67]Sheu, S.H., “Extended block replacement policy of system subject to shocks”, IEEE Transactions on Reliability 46-3, 375-382 (1997). [68]Sheu, S.H. and Yu, S.L., “Warranty strategy accounts for bathtub failure rate and random minimal repair Cost”, Computers & Mathematics with Applications 49, 1233-1242 (2005). [69]Sim, S.H. and Endrenyi, J., “A failure-repair model with minimal and major maintenance”, IEEE Transactions on Reliability 42, 134-140 (1993). [70]Stadje, W. and Zuckerman, D., “Optimal repair policies with general degree of repair in two maintenance models”, Operations Research Letters 11, 77-80 (1992). [71]Teramoto, K., Nakagawa, T. and Motoori, M., “Optimal inspection policy for a parallel redundant system,” Microelectronics and Reliability 30, 151-155 (1990). [72]Tilquin, C. and Cléroux, R., “Block replacement policies with general cost structures”, Technometrics 17-3, 291-298 (1975a). [73]Tilquin, C. and Cleroux, R., “Periodic Replacement with minimal repair at failure and general cost function”, Journal of Statistical Computing and Simulation 4(1), 63-67 (1975b). [74]Wang, H. and Pham, H., “Optimal age-dependent preventive maintenance policies with imperfect maintenance”, International Journal of Reliability, Quality and Safety Engineering 3, 119-135 (1996b). [75]Yeh, R.H. and Chen, C.K., “Periodical preventive-maintenance contract for a leased falcility with Weibull life-time”, Quality & Quantity 40, 303-313 (2006). [76]Yeh, R.H. and Chang, W. L., “Optimal threshold value of failure-rate for leased products with preventive maintenance actions”, Mathematical and Computer Modelling 46, 730-737 (2007). [77]Yeh, R.H. and Lo, H.C., “Optimal preventive-maintenance warranty policy for repairable products”, European Journal of Operational Research 134, 59-69 (2001). [78]Yun, W.Y., “An age replacement policy with increasing minimal repair cost”, Microelectronics and Reliability 29, 153-157 (1989).
|