:::

詳目顯示

回上一頁
題名:整合供應商與買家系統中考慮不良品重工的決策支援系統
作者:鄭震三
作者(外文):Chen-San Cheng
校院名稱:國立臺灣科技大學
系所名稱:管理研究所
指導教授:陳正綱
學位類別:博士
出版日期:2016
主題關鍵詞:整合供應商-買家系統存貨不良品重工integrated vendor-buyer systeminventorydefective itemsrework
原始連結:連回原系統網址new window
相關次數:
  • 被引用次數被引用次數:期刊(0) 博士論文(0) 專書(0) 專書論文(0)
  • 排除自我引用排除自我引用:0
  • 共同引用共同引用:0
  • 點閱點閱:8
廢棄物的不當處理可能造成環境的汙染。因此,如何做好廢棄物或報廢物的處理成為重要的研究議題。以往工業界對於不良品的處理多數都採取直接報廢的方式。本論文針對包含供應商和買家的整合供應鏈管理系統,不良品不直接報廢,而考慮將不良品重新送回供應商再生產製造,也就是重工。以系統總成本最小化為目標,來決定最佳的運送次數及生產數量。本研究將所欲探討的問題,建立成一個混合整數的非線性規畫問題,運用非線性規畫問題的求解技巧,找出最佳解的特性。然後根據這些特性,發展出有效的求解演算法,本研究更進一步將此演算法建置成一決策支援系統提供給決策者參考使用。
In this paper, we explore the defective items which can be reworked in an integrated vendor-buyer supply chain for the decision maker to determine the optimal number of shipments per production cycle from the vendor to the buyer and lot size per production cycle. The objective function of the total relevant costs considered in our model is mathematically formulated as a mixed-integer nonlinear programming problem. A complete search procedure is provided to find the optimal solution by utilizing the properties derived in this paper. Also, based on the search procedure developed in this paper, we implement a decision support system (DSS) on a personal computer to solve the proposed problem.
1.Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292-311.
2.Chen, C. K., & Lo, C. C. (2006). Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages. Mathematical and Computer Modelling, 44, 319-331.
3.Chen, L. H., & Kang, F. S. (2010). Coordination between vendor and buyer considering trade credit and items of imperfect quality. International Journal of Production Economics, 123, 52–61.
4.Chung, K. J. (2008). A necessary and sufficient condition for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration. International Journal of Production Economics, 113, 269–274.
5.Chung, K. J., & Hou, K. L. (2003). An optimal production run time with imperfect production processes and allowable shortages. Computers and Operations Research, 30, 483-490.
6.Flapper, S. D. P., & Teunter, R. H. (2004). Logistic planning of rework with deteriorating work-in-process. International Journal of Production Economics, 88, 51–59.
7.Goyal, S. K. (1988). “A joint economic-lot-size model for purchaser and vendor”: a comment. Decision Sciences, 19, 236-241.
8.Goyal, S. K., & Nebebe, F. (2000). Determination of economic production–shipment policy for a single-vendor–single-buyer system. European Journal of Operational Research, 121, 175–178.
9.Ha, D. (2010). Note on: A necessary and sufficient conditions for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration. International Journal of Production Economics, 124, 106–108.
10.Hill, R. M. (1997). The single-vendor single-buyer integrated production-inventory model with a generalised policy. European Journal of Operational Research, 97, 493–499.
11.Hill, R. M. (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. International Journal of Production Research, 37(11), 2463–2475.
12.Hsieh, C. C., & Lee, Z.Z. (2005). Joint determination of production run length and number of standbys in a deteriorating production process. European Journal of Operational Research, 162, 359-371.
13.Huang, C. K. (2004). An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration. International Journal of Production Economics, 91, 91–98.
14.Huang, C. K., Tsai, D. M., Wu, J. C., & Chung, K. J. (2010). An optimal integrated vendor–buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments. International Journal of Production Economics, 128, 445–451.
15.Inderfurth, K., Kovalyov, M. Y., Ng, C. T., & Werner, F. (2007). Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables. International Journal of Production Economics, 105, 345–356.
16.Kim, C. H., & Hong, Y. (1999). An optimal run length in deteriorating production process. International Journal of Production Economics, 58, 183-189.
17.Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312–323.
18.Ojha, D., Sarker, B. R., & Biswas, P. (2007). An optimal batch size for an imperfect production system with quality assurance and rework. International Journal of Production Research, 45, 3191–3214.
19.Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2007). An integrated vendor-buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics, 108, 349–358.
20.Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operation Research, 34, 137-144.
21.Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55.
22.Sana, S. S. (2010). An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201,158–170.
23.Woo, Y. Y., Hsu, S. L., & Wu, S. (2001). An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction. International Journal of Production Economics, 73, 203–215.
24.Yang, P. C., & Wee, H. M. (2002). A single-vendor and multiple-buyers production–inventory policy for a deteriorating item. European Journal of Operational Research, 143, 570–581.
 
 
 
 
第一頁 上一頁 下一頁 最後一頁 top