|
1.Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292-311. 2.Chen, C. K., & Lo, C. C. (2006). Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages. Mathematical and Computer Modelling, 44, 319-331. 3.Chen, L. H., & Kang, F. S. (2010). Coordination between vendor and buyer considering trade credit and items of imperfect quality. International Journal of Production Economics, 123, 52–61. 4.Chung, K. J. (2008). A necessary and sufficient condition for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration. International Journal of Production Economics, 113, 269–274. 5.Chung, K. J., & Hou, K. L. (2003). An optimal production run time with imperfect production processes and allowable shortages. Computers and Operations Research, 30, 483-490. 6.Flapper, S. D. P., & Teunter, R. H. (2004). Logistic planning of rework with deteriorating work-in-process. International Journal of Production Economics, 88, 51–59. 7.Goyal, S. K. (1988). “A joint economic-lot-size model for purchaser and vendor”: a comment. Decision Sciences, 19, 236-241. 8.Goyal, S. K., & Nebebe, F. (2000). Determination of economic production–shipment policy for a single-vendor–single-buyer system. European Journal of Operational Research, 121, 175–178. 9.Ha, D. (2010). Note on: A necessary and sufficient conditions for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration. International Journal of Production Economics, 124, 106–108. 10.Hill, R. M. (1997). The single-vendor single-buyer integrated production-inventory model with a generalised policy. European Journal of Operational Research, 97, 493–499. 11.Hill, R. M. (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. International Journal of Production Research, 37(11), 2463–2475. 12.Hsieh, C. C., & Lee, Z.Z. (2005). Joint determination of production run length and number of standbys in a deteriorating production process. European Journal of Operational Research, 162, 359-371. 13.Huang, C. K. (2004). An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration. International Journal of Production Economics, 91, 91–98. 14.Huang, C. K., Tsai, D. M., Wu, J. C., & Chung, K. J. (2010). An optimal integrated vendor–buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments. International Journal of Production Economics, 128, 445–451. 15.Inderfurth, K., Kovalyov, M. Y., Ng, C. T., & Werner, F. (2007). Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables. International Journal of Production Economics, 105, 345–356. 16.Kim, C. H., & Hong, Y. (1999). An optimal run length in deteriorating production process. International Journal of Production Economics, 58, 183-189. 17.Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312–323. 18.Ojha, D., Sarker, B. R., & Biswas, P. (2007). An optimal batch size for an imperfect production system with quality assurance and rework. International Journal of Production Research, 45, 3191–3214. 19.Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2007). An integrated vendor-buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics, 108, 349–358. 20.Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operation Research, 34, 137-144. 21.Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55. 22.Sana, S. S. (2010). An economic production lot size model in an imperfect production system. European Journal of Operational Research, 201,158–170. 23.Woo, Y. Y., Hsu, S. L., & Wu, S. (2001). An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction. International Journal of Production Economics, 73, 203–215. 24.Yang, P. C., & Wee, H. M. (2002). A single-vendor and multiple-buyers production–inventory policy for a deteriorating item. European Journal of Operational Research, 143, 570–581.
|