期刊論文1. | Egbelu, P. J.、Tanchoco, J. M. A.(1984)。Characterization of Automatic Guided Vehicle Dispatching rules。International Journal of Production Research,22(3),359-374。 |
2. | Sabuncuoglu, I.、Hommertzheim, D. L.(1992)。Dynamic Dispatching Algorithm for Scheduling Machines and Automated Guided Vehicles in a Flexible Manufacturing System。International Journal of Production Research,30(5),1059-1079。 |
3. | Yim, D.、Linn, R. J.(1993)。Push and Pull Rules for Dispatching Automated Guided Vehicles in a Flexible Manufacturing System。International Journal of Production Research,31(1),43-57。 |
4. | Psarafis, H.(1983)。An Exact Algorithm for the Single Vehicle Many-to-Many Immediate Request Dial-a-Ride Problem。Transportation Science,17(4),351-361。 |
5. | Psaraftis, Harilaos N.(1980)。A Dynamic Programming Solution to the Single Vehicle Many-to-many Immediate Request Dial-a-ride Problem。Transportation Science,14(2),130-154。 |
6. | Corley, H. W.、Sha, D. Y.(1982)。Most Vital Link and Nodes in Weighted Networks。Operations Research Letters,1(4),157-160。 |
7. | Bodin, L. D.、Golden, B. L.、Assad, A. A.、Ball, M. O.(1983)。Routing and Scheduling of Vehicles and Crews: The State of the Art。Computers & Operations Research,10(2),63-211。 |
8. | Bozer, Y. A.、Yen, Chin-kuan(1996)。Intelligent dispatching rules for trip-based material handling systems。Journal of Manufacturing Systems,15(4),226-236。 |
9. | Vasques, A.、Charnsethikul, P.、Blair, E. L.(1987)。Optimal routing of driverless vehicles in a flexible material handling system。Material Flow,4,73-83。 |
10. | Platzman, L. K.、Bartholdi, J. J.(1989)。Decentralized control of automated guided vehicles on a simple loop。IIE Transactions,21,76-81。 |
11. | Vohra, R. V.、Golden, B. L.、Ball, M. O.(1989)。Finding the most vital arcs in a network。Operations Research Letters,8,73-76。 |
12. | Bozer, Y. A.、Srinivasan, M. M.(1989)。Tandem configurations for agv systems offer simplicity and flexibility。Industrial Engineering,21(2),23-27。 |
13. | Bozer, Y. A.、Srinivasan, M. M.(1992)。Tandem AGV systems: a partitioning algorithm and performance comparison with conventional AGV systems。European Journal of Operational Research,63,173-179。 |
14. | Chen, Mingyuan(1996)。A mathematical programming model for AGVs planning and control in manufacturing systems。Computers and Industrial Engineering,30(4),647-658。 |
15. | Wilson, C.、King, R. E.(1991)。A review of automated guided vehicle systems design and scheduling。Production Planning & Control,2(1),44-51。 |
16. | Krishnamurthy, N. N.、Karwan, M. H.、Batra, R.(1993)。Developing conflict-free routes for automated guided vehicles。Operations Research,41(6),1077-1090。 |
17. | Liu, W. C.、Chang, C. C. K.、Lin, J. T.(1994)。A load-routeing problem in a tandem-configuration automated guided-vehicle system。International Journal of Production Research,32(2),411-427。 |
18. | Dgen, P. K.、Lin, J. T.(1994)。An algorithm for routeing control of a tandem automated guided vehicle system。International Journal of Production Research,32(2),2735-2750。 |
19. | Duh, Shyh-Hai、Liu, Chin-Ming(1992)。Study of AGVs design and dispatching rules by analytical and simulation methods。International Journal of Computer Integrated Manufacturing,5(4/ 5),290-299。 |
20. | Gupta, S. K.、Mittal, A. K.、Malik, K.(1989)。The k most vital arcs in the shortest path problem。Operations Research Letters,8,223-227。 |
21. | Malmborg, Charles J.(1990)。A model for design of zone control automated guided vehicle systems。International Journal of Production Research,28(10),1741-1758。 |
22. | Tanchoco, J. M. A.、Russell, D. S.(1984)。An evaluation of vehicle dispatching rules and their effect on shop performance。Material Flow,1,271-280。 |