| 期刊論文1. | Uzsoy, R.、Church, L. K.、Ovacik, I. M.、Hinchman, J.(1993)。Performance evaluation of dispatching rules for semiconductor testing operations。Journal of Electronics Manufacturing,3,95-105。 | 2. | Wein, L. M.(1988)。Scheduling Semiconductor Wafer Fabrication。IEEE Transactions on Semiconductor Manufacturing,1(3),115-130。 | 3. | Glassey, C. R.、Resende, M. G. C.(1988)。Closed-loop Job Release Control for VLSI Circuit Manufacturing。IEEE Transactions on Semiconductor Manufacturing,1(1),36-46。 | 4. | Hackman, S. T.、Leachman, R. C.(1989)。A General Framework for Modeling Production。Management Science,35(4),478-495。 | 5. | Uzsoy, R.、Lee, Chung-Yee、Martin-vega, L. A.(1992)。A Review of Production Planning and Scheduling Model in the Semiconductor Industry Part I: System Characteristics, Performance Evaluation and Production Planning。IIE Transactions,16(4),47-60。 | 會議論文1. | Ovacik, I. M.、Weng, W.(1995)。A framework for Supply chain management in Semiconductor Manufacturing Industry。IEEE/CPMT Int'l electronics manufacturing technology symposium。 | 2. | Murty, S. V.、Jennifer, W. B.(1995)。Global Planning at Harris Semiconductor Manufacturing。沒有紀錄。18-23。 | 研究報告1. | Leachman, R. C.(1993)。Modeling Techniques for Automated Production Planning in the Semiconductor Industry。Berkeley。 | 圖書1. | (1995)。發展論壇。1995半導體工業年鑑。新竹縣。 延伸查詢 | |